Komori
Osg (6136) · InitiativeAdvanced

CO2 Emissions Reduction through an Agrivoltaic Off-Site PPA

First written in FY2022. 2 of 3 entries say "Advanced", first in FY2023. Latest entry: FY2024.

3entries
3years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2022AdvancedFY2023 – FY20242023: 120232024: 120242025: 12025
Same theme, other companies
Introduction of Electricity from Renewable Energy at Business SitesA theme 107 companies write about · 0 as a headwind · 111 as a tailwind

47 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 107 companies compared. The sentences above are computed from all 107.
Full recordFilings, disclosures and news, newest first
  1. FY2024AdvancedAnnual report

    「In December 2022, the company entered into an agreement with 中部電力ミライズ㈱ and アグリガスコム㈱ to implement an agrivoltaic off-site PPA, under which it will procure CO2-free electricity from a dedicated solar power plant for 20 years. This is expected to reduce CO2 emissions by approximately 4,000 tonnes annually.」

    The expected reduction from the off-site PPA was revised from approximately 2,000 tonnes to approximately 4,000 tonnes annually, with the overall reduction effect expected to be approximately 9%. The plan also calls for the on-site PPA at the Shinshiro Plant to begin full-scale operation in December 2024.
  2. FY2023AdvancedAnnual report

    「In December 2022, the company entered into an agreement with 中部電力ミライズ㈱ and アグリガスコム㈱ to implement an agrivoltaic off-site PPA, under which it will procure CO2-free electricity from a dedicated solar power plant for 20 years. This is expected to reduce CO2 emissions by approximately 2,000 tonnes annually, equivalent to an approximately 5% reduction. Power generation began in February 2023 and now supplies part of the electricity used by 4 facilities, including the Shinshiro Plant.」

    The agrivoltaic off-site PPA progressed to the stage where power generation began in February 2023 and supplies part of the electricity used by 4 facilities, including the Shinshiro Plant.
  3. FY2022First statedAnnual report

    「In December 2022, the company entered into an agreement with 中部電力ミライズ㈱ and アグリガスコム㈱ to implement an agrivoltaic off-site PPA, under which it will procure CO2-free electricity from a dedicated solar power plant for 20 years. This is expected to reduce CO2 emissions by approximately 2,000 tonnes annually, equivalent to an approximately 5% reduction.」

    The company entered into a PPA agreement to procure CO2-free electricity from a dedicated solar power plant for 20 years, and expects an annual CO2 reduction of approximately 2,000 tonnes, or approximately 5%.
Moved together

"Share Repurchases" moved the same way as this thread, in the same document, in 2 of its 3 moves.

222222★123456
  1. ★This thread
  2. 1Share Repurchases2×
  3. 2Diversified funding through a combination of own funds, borrowings and corporate bonds2×
  4. 3Research and Development of New A-Brand Products and Machining Technologies2×
  5. 4Introduction of a Restricted Stock Compensation Plan2×
  6. 5Addressing Climate Change Risks and Opportunities Through TCFD Scenario Analysis2×
  7. 6Creating an Employment Environment for People with Disabilities Through the Establishment of a Special Subsidiary2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Osg yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
CO2 Emissions Reduction through an Agrivoltaic Off-Site PPA | OSG Corporation (6136) | Komori