Sanyo Industries (5958) · RiskMaterialised

Delays in Construction Starts and Progress Due to Labor Shortages

First written in FY2018-Q2. 12 of 20 entries say "Restated". Latest entry: FY2026.

20entries
10years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2018-Q2 – FY2022-Q2RestatedFY2023-Q3 – FY2024-Q32017: 12018: 320182019: 220192020: 220202021: 220212022: 220222023: 120232024: 320242025: 120252026: 32026
Same theme, other companies
Construction delays caused by labor shortages in the construction industryA theme 34 companies write about · 34 as a headwind · 0 as a tailwind

Sanyo Industries moved to the "Worse" side of this theme in 2025, 5 years after the typical company in this theme (2020).

The whole theme swung hardest in 2022: 6 of 14 companies on the "Worse" side.

7 other companies' latest entry also says "Materialised".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 34 companies compared. The sentences above are computed from all 34.
Full recordFilings, disclosures and news, newest first
  1. FY2026MaterialisedAnnual report

    「There were also delays in construction schedules due to labor shortages and other factors.」

    人手不足等による建設工事の工期遅延が実際に発生したと記載され、従来のリスクが事業環境に現れている。
  2. FY2026-H1MaterialisedAnnual report

    「厳しい市場環境を背景に受注が伸び悩んだことや工期遅延が重なったことにより」

    システム子会社の業績説明において、工期遅延が実際に発生し、受注の伸び悩みとともに売上・損益悪化の要因となったと記載されている。
  3. FY2025-H1RestatedAnnual report

    「No new business or other risks arose during the six months ended 30 June. There were also no material changes to the business and other risks described in the securities report for the previous fiscal year.」

    建設労働者不足による着工・進捗遅延または人件費上昇リスクについて、新たな発生や重要な変更はないとしている。
  4. FY2024MaterialisedAnnual report

    「また、人手不足等による建設工事の遅れも発生していました。」

    人手不足等による建設工事の遅れが実際に発生したと記載され、従来の外部リスクが事業環境に現れている。
  5. FY2024-Q3RestatedAnnual report

    「No new business or other risks arose during the nine months ended 31 December. There were also no material changes to the business and other risks described in the securities report for the previous fiscal year.」

    建設労働者不足による着工・進捗遅延または人件費上昇リスクについて、新たな発生や重要な変更はないとしている。
  6. FY2023-Q3RestatedAnnual report

    「No new business or other risks arose during the nine months ended 31 December. There were also no material changes to the business and other risks described in the securities report for the previous fiscal year.」

    建設労働者不足による着工・進捗遅延または人件費上昇リスクについて、新たな発生や重要な変更はないとしている。
  7. FY2022WorsenedAnnual report

    「他方、原材料価格の高騰をはじめ、物流費や建設労働者不足による人件費の上昇、さらにはコロナ禍の影響によって工事の遅延や延期を余儀なくされるなど、経営環境は依然として厳しい状況にありました。」

    建設労働者不足は、従来の着工・進捗遅延に加えて人件費上昇として実際のコスト負担に現れている。コロナ禍による工事遅延・延期も併記されている。
  8. FY2022-Q3ReframedAnnual report

    「一方、原材料価格の高止まりや物流費の上昇、更には建設労働者不足による人件費の高騰といったコストアップへの懸念が顕在化するなど、経営環境は引き続き厳しい状況にありました。」

    建設労働者不足について、従来の着工・進捗遅延という影響に加え、人件費高騰を通じたコストアップ要因として表現している。
  9. FY2022-Q2RestatedAnnual report

    「No new business or other risks arose during the first half of the current consolidated fiscal year. In addition, no material changes have occurred in the business and other risks described in the securities report for the previous fiscal year.」

    建設労働者不足による着工・進捗遅延リスクについて、新たな発生や重要な変更はないとしている。
  10. FY2021-Q3RestatedAnnual report

    「No new business or other risks arose during the nine months ended 31 December. There were also no material changes to the business and other risks described in the securities report for the previous fiscal year.」

    建設労働者不足による着工・進捗遅延リスクについて、新たな発生や重要な変更はないとしている。
  11. FY2021-Q2RestatedAnnual report

    「No new business or other risks arose during the six months ended 30 September. There were also no material changes to the business and other risks described in the securities report for the previous fiscal year.」

    建設労働者不足による着工・進捗遅延リスクについて、新たな発生や重要な変更はないとしている。
  12. FY2021-Q1RestatedAnnual report

    「During the current first-quarter consolidated cumulative period, no new business or other risks arose. There were also no material changes to the business and other risks described in the securities report for the previous fiscal year.」

    建設労働者不足による着工・進捗遅延リスクについて、新たな発生や重要な変更はないとしている。
  13. FY2019DroppedAnnual report

    「当社グループの関連する建築業界におきましては、政府建設投資が低調であったことに加え、民間建設投資においても、住宅投資及び土木を除く非住宅投資が前期比で微増に止まるなど、当連結会計年度における建築需要は総じて力強さを欠いた状況で推移いたしました。」

    本ファイリングの経営環境・リスク記載では、建設労働者不足による着工・進捗遅延への明示的な言及が見当たらない。
  14. FY2019-Q3RestatedAnnual report

    「During the current third-quarter consolidated cumulative period, no new business or other risks arose. There were also no material changes to the business and other risks described in the securities report for the previous fiscal year.」

    建設労働者不足による着工・進捗遅延リスクについて、新たな発生や重要な変更はないとしている。
  15. FY2019-Q2RestatedAnnual report

    「During the current second-quarter consolidated cumulative period, no new business or other risks arose. There were also no material changes to the business and other risks described in the securities report for the previous fiscal year.」

    建設労働者不足による着工・進捗遅延リスクについて、新たな発生や重要な変更はないとしている。
  16. FY2019-Q1RestatedAnnual report

    「During the current first-quarter consolidated cumulative period, no new business or other risks arose. There were also no material changes to the business and other risks described in the securities report for the previous fiscal year.」

    建設労働者不足による着工・進捗遅延リスクについて、新たな発生や重要な変更はないとしている。
  17. FY2018-Q3RestatedAnnual report

    「建設労働者不足による着工・進捗の遅れ、ドライバー不足による運賃コストの上昇など、経営を圧迫する要因が顕在化してきており、楽観視のできない状況が続いております。」

    建設労働者不足による着工・進捗遅延が引き続き顕在化した問題として記載されている。ドライバー不足と運賃コスト上昇は新たなリスクとして別スレッドで扱う。
  18. FY2018-Q2First statedAnnual report

    「In addition, problems such as delays in construction starts and progress caused by a shortage of construction workers have become apparent. The operating environment surrounding the construction industry contains sources of instability despite some positive developments, and cannot be viewed optimistically.」

    Delays in construction starts and progress caused by shortages of construction workers are identified for the first time as an external risk that has become apparent.
Moved together

"Stable Profits and Sustainable Growth Amid a Shrinking Construction Market" moved the same way as this thread, in the same document, in 4 of its 20 moves.

444322★123456
  1. ★This thread
  2. 1Stable Profits and Sustainable Growth Amid a Shrinking Construction Market4×
  3. 2Strengthening Sales at System Subsidiaries, Centered on Design Specification Activities4×
  4. 3Economic Uncertainty Due to Slowing Growth in Emerging Economies and Brexit4×
  5. 4Impact of Legislative Amendments and the Availability of Subsidies on Business Performance3×
  6. 5Shrinking Construction Market, Weak Construction Demand and Intensifying Competition2×
  7. 6Steel and Aluminum Price Volatility and the Risk of Failing to Pass Through Costs2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Sanyo Industries's next results are scheduled for 2026-11-06. Read the earnings preview It last moved in the General Meetings of Shareholders of 2026-06-04: "Restated".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Delays in Construction Starts and Progress Due to Labor Shortages | SANYO INDUSTRIES,LTD. (5958) | Komori