Komori
TAKADAKIKO(Steel Construction) (5923) · RiskMitigated

Liability for Serious Defects and Quality Issues

First written in FY2016. 3 of 6 entries say "Restated". Latest entry: FY2026.

6entries
11years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2016RestatedFY2022 – FY20242016: 120162017: 020172018: 020182019: 020192020: 020202021: 120212022: 120222023: 120232024: 120242025: 020252026: 12026
Same theme, other companies
Housing and Real Estate Construction Defect and Defect Liability RiskA theme 103 companies write about · 103 as a headwind · 4 as a tailwind

The whole theme swung hardest in 2026: 7 of 39 companies on the "Worse" side.

9 other companies' latest entry also says "Mitigated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 103 companies compared. The sentences above are computed from all 103.
Full recordFilings, disclosures and news, newest first
  1. FY2026MitigatedAnnual report

    「As a measure to address this risk, we launched the Safety and Quality Division to establish a company-wide quality management structure and are reorganising the departments responsible for quality management at each division into the Safety and Quality Division.」

    In response to serious defects and quality issues, the quality management departments were consolidated into the Safety and Quality Division, establishing a company-wide quality management structure.
  2. FY2024RestatedAnnual report

    「As a measure to address this risk, we are working to improve quality company-wide by operating a quality management system based on ISO 9001.」

    Operation of the quality management system based on ISO 9001 has continued.
  3. FY2023RestatedAnnual report

    「As a measure to address this risk, we are working to improve quality company-wide by operating a quality management system based on ISO 9001.」

    In response to serious defects and quality issues, operation of the quality management system based on ISO 9001 has continued.
  4. FY2022RestatedAnnual report

    「As a measure to address this risk, we are working to improve quality company-wide by operating a quality management system based on ISO 9001.」

    In response to serious defects and quality issues, operation of the quality management system based on ISO 9001 has continued.
  5. FY2021MitigatedAnnual report

    「As a measure to address this risk, we operate a quality management system based on ISO 9001 as part of company-wide efforts to improve quality.」

    In response to the risk of serious defects and quality issues, a company-wide quality management system based on ISO 9001 is in operation.
  6. FY2016First statedAnnual report

    「If serious defects liability arises, we could not only incur rectification costs but also lose the trust of our customers, potentially having a significant impact on our performance.」

    The company has disclosed the possibility of serious defects in manufacturing and installation quality, together with the resulting impact on costs and trust, as a risk.
Moved together

"Securing a Stable Order Pipeline" moved the same way as this thread, in the same document, in 2 of its 6 moves.

222★123
  1. ★This thread
  2. 1Securing a Stable Order Pipeline2×
  3. 2Making Maintenance and Medium- to Large-Scale Rehabilitation Projects a New Business Pillar2×
  4. 3Accidents associated with the manufacture, transportation and installation of large, heavy products2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for TAKADAKIKO(Steel Construction) yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.