- FY2026AdvancedAnnual report
「We are proceeding with capital investment to install HVDC cable manufacturing equipment, buildings and other facilities at our sites, including in Futtsu, Chiba Prefecture, and to manufacture and sell these cables, with operations scheduled to begin by 2030.」
Following the acquisition of 日本サブマリンケーブル as a subsidiary, the company is developing HVDC cable manufacturing facilities in Futtsu, Chiba Prefecture, and elsewhere, with operations scheduled to begin by 2030. - 2026-05-12AdvancedEarnings
「We continued working to increase the manufacturing and construction capabilities for power cables.」
The Company continued increasing power cable manufacturing and construction capabilities against a backdrop of domestic demand for extra-high-voltage power cables and renewable energy. - FY2026-H1AdvancedAnnual report
「As part of the growth strategy for the Energy Infrastructure Division, which oversees the power business, we are expanding currently insufficient submarine-cable manufacturing capacity.」
To expand submarine-cable manufacturing capacity, the company made 日本サブマリンケーブル株式会社 a subsidiary effective 1 July 2025. It also decided to invest approximately ¥100 billion in manufacturing equipment for 500kV-class HVDC cables and related facilities, targeting operations by 2030 and annual production capacity of 200 km. - FY2025AdvancedAnnual report
「In the energy infrastructure business, the power business worked to expand cable manufacturing and construction capacity against a backdrop of solid demand for domestic extra-high-voltage underground cables and submarine and underground cables for renewable energy.」
The company captured demand for domestic extra-high-voltage underground cables and renewable-energy-related products, while expanding manufacturing and construction capacity, prioritizing orders that secure profitability and pursuing appropriate pricing. Infrastructure segment operating profit improved by ¥15.8 billion from the previous year's loss to ¥4.5 billion. - FY2025-H1AdvancedAnnual report
「In the energy infrastructure business, profit increased due to higher revenue from domestic extra-high-voltage cables, renewable-energy-related products and specialty cables. As a result, segment revenue was ¥144.0 billion, up 6.8% year on year, and the operating loss was ¥2.9 billion, an improvement of ¥5.8 billion year on year.」
Higher revenue from domestic extra-high-voltage cables, renewable-energy-related products and specialty cables improved earnings in the energy infrastructure business, and the infrastructure segment's operating loss improved by ¥5.8 billion from the year-earlier period. However, it still posted an operating loss of ¥2.9 billion. - FY2024WorsenedAnnual report
「In the power business, demand for domestic extra-high-voltage underground cables remained solid, and submarine and underground cables for renewable energy also performed well. However, the energy infrastructure business as a whole reported higher revenue and lower profit due largely to the downturn in the Chinese market and other factors. As a result, consolidated segment revenue was ¥278.2 billion, down 14.1% from the previous fiscal year, and the consolidated operating loss was ¥11.3 billion, deteriorating by ¥19.9 billion.」
Although domestic extra-high-voltage underground cable and renewable-energy projects performed well, the infrastructure segment, including the energy infrastructure business, saw its operating loss widen to ¥11.3 billion due to the downturn in the Chinese market and other factors. - FY2024-Q3WorsenedAnnual report
「In the energy infrastructure business, specialty cables such as aluminum CV cables performed well. However, profit declined due to lower revenue and the application of the lower-of-cost-or-market method as large project orders were postponed to the following fiscal year or later, higher depreciation and amortization expenses and product warranty expenses. As a result, segment revenue was ¥198.9 billion, down 16.5% year on year, and the operating loss was ¥13.2 billion, deteriorating by ¥16.8 billion year on year.」
While specialty cables performed well, the infrastructure segment, including energy infrastructure, posted an operating loss of ¥13.2 billion as the lower-of-cost-or-market adjustment related to postponed large projects, higher depreciation and amortization expenses and product warranty expenses combined to weigh on earnings. - FY2024-Q2WorsenedAnnual report
「In the energy infrastructure business, specialty cables such as aluminum CV cables remained solid. However, profit declined due to lower revenue and the application of the lower-of-cost-or-market method as large project orders were postponed to the following fiscal year or later, continued customer construction delays in China, higher depreciation and amortization expenses and product warranty expenses. As a result, segment revenue was ¥134.8 billion, down 15.7% year on year, and the operating loss was ¥8.7 billion, deteriorating by ¥11.2 billion year on year.」
Although specialty cables remained solid, earnings in the energy infrastructure business deteriorated due to the application of the lower-of-cost-or-market method following the postponement of large projects to the following fiscal year or later, customer construction delays in China, higher depreciation and amortization expenses and product warranty expenses. - FY2024-Q1WorsenedAnnual report
「In the energy infrastructure business, specialty cables such as aluminum CV cables remained solid. However, profit declined due to continued customer construction delays caused by the slowdown in China's economic recovery, higher depreciation and amortization expenses associated with investment to expand cable manufacturing capacity, and product warranty expenses.」
While specialty cables such as aluminum CV cables remained solid, continued customer construction delays caused by the slowdown in China's economic recovery, depreciation and amortization expenses associated with capacity expansion investment, and product warranty expenses combined to impede earnings improvement in the energy infrastructure business, including the power business. - FY2023AdvancedAnnual report
「In the energy infrastructure business, we will focus on fields expected to expand, including domestic extra-high-voltage underground cables and submarine and underground cables for renewable energy such as solar and offshore wind power. Alongside efforts to expand cable manufacturing and construction capacity, we will increase sales of specialty cables, including lightweight and highly flexible aluminum CV cables that contribute to labor savings and greater efficiency in construction, as well as power transmission and distribution components, with the aim of increasing earnings.」
The company specified measures to rebuild the power business, including focusing on extra-high-voltage underground cables and submarine and underground cables for renewable energy, expanding manufacturing and construction capacity, and increasing sales of specialty cables and power transmission and distribution components. - FY2023-Q3RestatedAnnual report
「In the energy infrastructure business, domestic underground-cable projects and power transmission and distribution components remained solid. However, profit declined due to customer construction delays caused by COVID-19 lockdowns in China and lower operating levels at the Chinese subsidiary.」
While reconfirming the solid performance of domestic underground-cable projects and power transmission and distribution components, the company stated that construction delays and lower operating levels at the Chinese subsidiary caused by China's lockdowns continued to weigh on profit. - FY2023-Q2RestatedAnnual report
「In the energy infrastructure business, domestic underground-cable projects and power transmission and distribution components remained solid. However, profit declined due to customer construction delays caused by COVID-19 lockdowns in China and lower operating levels at the Chinese subsidiary.」
While domestic underground-cable projects and power transmission and distribution components progressed steadily, customer construction delays caused by China's lockdowns and lower operating levels at the Chinese subsidiary continued to weigh on profit. - FY2023-Q1WorsenedAnnual report
「In the energy infrastructure business, domestic underground-cable projects and power transmission and distribution components progressed steadily. However, profit declined due to customer construction delays caused by COVID-19 lockdowns in China and lower operating levels at the Chinese subsidiary.」
While domestic underground-cable projects and power transmission and distribution components progressed, customer construction delays caused by China's lockdowns and lower operating levels at the Chinese subsidiary resulted in lower profit in the energy infrastructure business. - FY2022AdvancedAnnual report
「In the energy infrastructure business, domestic underground-cable operations, including those for renewable energy, progressed steadily in the power business. The industrial electric wire and equipment business also recovered from the impact of COVID-19 and other factors in the previous fiscal year, resulting in higher revenue and profit.」
Domestic underground-cable operations, including those for renewable energy, progressed steadily, and the energy infrastructure business recovered from the previous fiscal year to report higher revenue and profit. - FY2022-Q3RestatedAnnual report
「In the energy infrastructure business, overseas submarine-cable projects, domestic underground-cable projects and the Chinese subsidiary remained broadly solid and progressed largely as expected.」
The company reconfirmed that overseas submarine-cable projects, domestic underground-cable projects and the Chinese subsidiary progressed largely as expected. - FY2022-Q2AdvancedAnnual report
「In the energy infrastructure business, overseas submarine-cable projects, domestic underground-cable projects and the Chinese subsidiary progressed as expected.」
The company stated that, in addition to its existing overseas submarine-cable and domestic underground-cable projects, the Chinese subsidiary also progressed as expected, providing specific confirmation of project progress in the power business. - FY2022-Q1RestatedAnnual report
「In the energy infrastructure business, overseas submarine-cable and domestic underground-cable projects progressed as expected.」
The company reconfirmed that overseas submarine-cable and domestic underground-cable projects progressed as expected. - FY2021Strong projects and continuing COVID-19 impacts coexistAnnual report
「In the energy infrastructure business, revenue and profit from domestic renewable-energy projects and underground-cable projects in Japan and overseas remained strong. However, the domestic market environment for general-purpose cables for the construction and electrical-product sales markets was challenging due to COVID-19. In China, construction start-ups were delayed and logistics disrupted because of restrictions on movement and other factors, resulting in lower revenue and profit.」
Although renewable-energy and underground-cable projects in Japan and overseas performed well, the energy infrastructure business reported lower revenue and profit due to the challenging general-purpose cable market and construction delays and logistics disruptions in China. - FY2021-Q3Project progress and COVID-19 impacts coexistAnnual report
「In the energy infrastructure business, domestic renewable-energy projects and underground-cable projects in Japan and overseas progressed steadily. However, due to the impact of COVID-19, products for the domestic construction and electrical-product sales markets and the railway-related market recorded lower revenue, while revenue at the Chinese subsidiary was deferred because customers postponed construction plans.」
Although renewable-energy projects and underground-cable projects in Japan and overseas progressed steadily, revenue declined in the domestic construction, electrical-product sales and railway-related markets, while the Chinese subsidiary experienced construction-plan delays. - FY2021-Q2WorsenedAnnual report
「In the energy infrastructure business, domestic renewable-energy projects and overseas underground-cable projects progressed steadily. However, revenue from general-purpose cables and components for the domestic construction and electrical-product sales markets declined due to the impact of COVID-19, while the business was also affected by lower operating levels at the Chinese subsidiary and construction delays in some regions. As a result, segment revenue was ¥122.2 billion, down 11.4% year on year, and the operating loss was ¥1.7 billion, deteriorating by ¥2.2 billion year on year.」
While renewable-energy and overseas underground-cable projects progressed, the infrastructure segment posted an operating loss due to lower revenue from domestic general-purpose cables and components amid COVID-19, lower operating levels at the Chinese subsidiary and construction delays. - FY2021-Q1AdvancedAnnual report
「In the energy infrastructure business, domestic renewable-energy projects and overseas underground-cable projects progressed steadily despite the impact of COVID-19.」
Domestic renewable-energy projects and overseas underground-cable projects progressed steadily despite the impact of COVID-19. - FY2020AdvancedAnnual report
「In the energy infrastructure business, operations at the power-cable manufacturing plant at the Chiba facility were temporarily suspended following damage from Typhoon No. 15. However, sales increased as a result of capturing demand for domestic extra-high-voltage underground cables and other factors. In addition, the absence of a one-off loss recorded in the previous fiscal year and improved earnings at the Chinese subsidiary resulted in a return to profitability.」
The energy infrastructure business returned to profitability as a result of capturing demand for domestic extra-high-voltage underground cables and improved earnings at the Chinese subsidiary. - FY2020-Q3Earnings decline widens despite recovery measuresAnnual report
「In the energy infrastructure business, we steadily implemented measures to improve performance, including capturing demand for domestic underground-cable projects. As a result, segment revenue was ¥204.1 billion, down 3.9% year on year, and operating profit was ¥0.3 billion, down 93.2% year on year.」
While implementing recovery measures, including capturing domestic underground-cable projects, infrastructure segment operating profit fell to ¥0.3 billion, down 93.2% year on year, widening the earnings decline. - FY2020-Q2Earnings decline continues despite recovery measuresAnnual report
「In the energy infrastructure business, we steadily implemented measures to improve performance, including capturing demand for domestic underground-cable projects. As a result, segment revenue was ¥137.9 billion, down 0.9% year on year, and operating profit was ¥0.6 billion, down 76.0% year on year.」
While implementing recovery measures, including capturing domestic underground-cable projects, the infrastructure segment's operating profit was ¥0.6 billion, down 76.0% year on year. - FY2020-Q1Losses emerge while recovery measures are being implementedAnnual report
「In the energy infrastructure business, we steadily implemented measures to improve performance, including capturing demand for domestic underground-cable projects. As a result, segment revenue was ¥67.7 billion, down 0.8% year on year, and the operating loss was ¥0.4 billion, deteriorating by ¥2.2 billion year on year.」
While implementing recovery measures, including capturing domestic underground-cable projects, the infrastructure segment posted an operating loss of ¥0.4 billion, a ¥2.2 billion deterioration from the year-earlier period. - FY2019Profit pressured by low-margin projects and provisions for contract lossesAnnual report
「In the power business, profit was pressured by the recognition of revenue from low-margin projects ordered in prior years and the recording of a provision for contract losses related to new-energy projects ordered strategically for the future.」
Losses from low-margin overseas underground-cable projects and new-energy submarine-cable projects in the power business pressured full-year profit. - FY2019-Q3RestatedAnnual report
「In the power business, a provision for contract losses related to new-energy orders was recorded in the second quarter of the fiscal year.」
The company again described the recording of a provision for contract losses related to new-energy orders and the continuing weakness in the power business. - FY2019-Q2Provision for contract losses recorded; weakness persistsAnnual report
「The power business recorded a provision for contract losses related to new-energy orders.」
The company stated that it had recorded a provision for contract losses related to new-energy orders in the power business, indicating that weak performance has continued. - FY2019-Q1Weakness persistsAnnual report
「In the infrastructure segment, the power business is steadily laying the groundwork for growth, but its performance remains weak.」
The company stated that it was laying the groundwork for growth, while noting that the power business remains underperforming. - FY2018RestatedAnnual report
「In the energy field, we will continue working to transition the power business to a stable earnings structure by building a track record of deliveries of submarine cables for new energy, including solar and wind power, as well as extra-high-voltage and submarine cables primarily for Asia, while strengthening profitability management and capturing demand for equipment upgrades from domestic electric utilities.」
The company continues to pursue its policy of transitioning the power business to a stable earnings structure through profitability management, capturing demand for equipment upgrades and building a track record of deliveries. - FY2018-Q3Power business weakness becomes apparentAnnual report
「Although the power business remained sluggish, the decline in revenue from integrated signal light sources widened as the adjustment in the Chinese market continued, and sales of optical cables in North America temporarily declined, higher sales driven by strong demand for domestic network systems resulted in segment sales of ¥216.6 billion, up 15.6% year on year, and operating income of ¥9.8 billion, up 15.1%.」
Although the infrastructure segment as a whole reported higher revenue and operating profit, the power business was described as underperforming, again highlighting the status of the business targeted for recovery. - FY2018-Q2AdvancedAnnual report
「Although the prolonged adjustment in the Chinese market for integrated signal light sources widened the decline in revenue, strong demand for optical fiber and cable products and domestic network systems, as well as solid domestic power construction activity, resulted in segment sales of ¥140.9 billion, up 15.0% year on year, and operating income of ¥8.0 billion, up 49.4%.」
Domestic power construction remained solid, with infrastructure segment revenue of ¥140.9 billion and operating profit of ¥8.0 billion. - FY2018-Q1AdvancedAnnual report
「In addition to strong demand for optical fiber and cable products in Europe and the United States and domestic power construction, the segment benefited from increased demand for domestic network systems accompanying the shift to optical communications. As a result, segment sales were ¥69.6 billion, up 12.6% year on year, and operating profit was ¥3.9 billion, up 70.0%.」
Strong demand for domestic power construction drove infrastructure segment revenue and operating profit above the year-earlier period. - FY2017RestatedAnnual report
「In October last year, we acquired the domestic underground and submarine transmission cable business of VISCAS Corporation. By operating it as an integrated business with the overseas division acquired in April the year before last, we will accelerate efforts to win contracts for ultra-high-voltage power projects in Japan and overseas.」
The company indicated a policy of accelerating order acquisition by operating the domestic business as an integrated operation with the overseas division following the acquisition. - FY2017-Q2AdvancedAnnual report
「This business acquisition is being carried out as part of the group's strategy for its power business. In the power infrastructure market, which is expected to grow over the medium to long term, the group aims to strengthen and further develop its competitiveness by leveraging its world-class technology and extensive track record in the power business to take over and operate the acquired business.」
The company outlined a specific measure to strengthen its competitiveness in the power infrastructure market by acquiring the underground and submarine transmission cable business from VISCAS. - FY2016First statedAnnual report
「In the energy field, we will seek to turn around the underperforming power business by strengthening the group's engineering capabilities and expanding orders for projects in Japan and overseas.」
The company plans to rebuild the underperforming power business through stronger engineering capabilities and increased domestic and overseas project orders.