Komori
Sumitomo Metal Mining (5713) · TargetUpdated annual production and KPI actuals

Annual Attributable Production of 300,000 Tonnes of Copper and 30 Tonnes of Gold

First written in FY2016. 13 of 23 entries say "Restated". Latest entry: FY2026.

23entries
11years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2018-Q1 – FY2019-Q1RestatedFY2020-Q1 – FY2021OtherFY2025-H1 – FY20262016: 320162017: 320172018: 320182019: 420192020: 220202021: 120212022: 120222023: 120232024: 220242025: 220252026: 12026
Same theme, other companies
Target for Increasing Production Attributable to Resource InterestsA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2026Updated annual production and KPI actualsAnnual report

    「銅権益生産量(当社グループが権益を保有する銅鉱山) 30万トン/年(銅量) 21.7万トン/年(銅量)」

    2030年度KPIの銅権益生産量30万トンに対し、2025年度実績21.7万トンを開示した。コテ金鉱山は年間生産量12.4トンで計画を上回った。
  2. FY2026-H1Updated six-month production actualAnnual report

    「ケブラダ・ブランカ銅鉱山の生産量は、前年同期間並みの92千tとなりました(うち非支配持分を除く当社持分は25.0%)。 コテ金鉱山の生産量は、5.3tとなりました(うち非支配持分を除く当社持分は30.0%)。」

    銅権益分年間生産量30万トン・金30トンの長期目標に関連し、QB銅鉱山とコテ金鉱山の当中間連結会計期間の生産実績を更新した。
  3. FY2025Update on annual production resultsAnnual report

    「銅権益生産量(SMMグループが権益を保有する銅鉱山) 30万トン/年(銅量) 23.2万トン/年」

    長期目標30万トン/年に対し、2030年度KPIの2024年度実績として銅権益生産量23.2万トンを記載した。
  4. FY2025-H1Updated six-month production actualAnnual report

    「Production at the Quebrada Blanca copper mine in Chile was 91 thousand tonnes, of which the Company’s interest excluding non-controlling interests was 25.0%. Production at the Côté Gold mine in Canada was 1.1 tonnes, of which the Company’s interest excluding non-controlling interests was 39.7%.」

    Production actuals for the major copper and gold mines were updated for the six-month consolidated accounting period: 91 thousand tonnes at QB and 1.1 tonnes at Côté Gold.
  5. FY2024AdvancedAnnual report

    「The project is expected to transition to full production from the second half of fiscal 2024.」

    Following the start of QB2 production ramp-up, the Company expects to transition to full production from the second half of fiscal 2024, indicating progress toward the target of annual attributable copper production of 300,000 tonnes.
  6. FY2023RestatedAnnual report

    「• Copper: annual attributable production of 300,000 tonnes」

    The long-term target of annual attributable copper production of 300,000 tonnes is reaffirmed.
  7. FY2022AdvancedAnnual report

    「Production of 70,000 tonnes per year attributable to the Company is planned for fiscal 2024, bringing annual attributable copper production to 270,000 tonnes through the project’s contribution.」

    A medium-term milestone was presented for fiscal 2024: 70,000 tonnes of copper production attributable to the Company and annual attributable copper production of 270,000 tonnes including QB2.
  8. FY2021RestatedAnnual report

    「• Copper: annual attributable production of 300,000 tonnes • Gold: entry into new mining operations through the acquisition of high-quality interests」

    The targets of annual attributable copper production of 300,000 tonnes and entry into new gold mining operations through the acquisition of high-quality interests are reaffirmed as targets under the 18 Plan.
  9. FY2020RestatedAnnual report

    「• Copper: annual attributable production of 300,000 tonnes • Gold: entry into new mining operations through the acquisition of high-quality interests」

    The targets of annual attributable copper production of 300,000 tonnes and entry into new gold mining operations through the acquisition of high-quality interests are reaffirmed.
  10. FY2020-Q3RestatedAnnual report

    「Specifically, in the Resources and Smelting businesses, we will expand operations with the aim of establishing annual nickel production capacity of 150,000 tonnes and annual attributable copper production of 300,000 tonnes, while seeking to enter new gold mining operations through the acquisition of high-quality interests.」

    The policy of expanding the Resources and Smelting businesses, including annual attributable copper production of 300,000 tonnes, and entering gold mining operations through the acquisition of high-quality interests is reaffirmed.
  11. FY2020-Q2RestatedAnnual report

    「Specifically, in the Resources and Smelting businesses, we will expand operations with the aim of establishing annual nickel production capacity of 150,000 tonnes and annual attributable copper production of 300,000 tonnes, while seeking to enter new gold mining operations through the acquisition of high-quality interests.」

    The policy of expanding the Resources and Smelting businesses, including annual attributable copper production of 300,000 tonnes, and entering new gold mining operations through the acquisition of high-quality interests is reaffirmed.
  12. FY2020-Q1RestatedAnnual report

    「Specifically, in the Resources and Smelting businesses, we will expand operations with the aim of establishing annual nickel production capacity of 150,000 tonnes and annual attributable copper production of 300,000 tonnes, while seeking to enter new gold mining operations through the acquisition of high-quality interests.」

    The 18 Plan reaffirms annual nickel production capacity of 150,000 tonnes, annual attributable copper production of 300,000 tonnes and entry into new gold mining operations through the acquisition of high-quality interests.
  13. FY2019AdvancedAnnual report

    「The Quebrada Blanca 2 project is a copper mine development project in Chile that the Company decided to enter in December 2018. It is a large-scale project with production scheduled to begin in the second half of 2021, a mine life of approximately 28 years and average annual copper production of approximately 240,000 tonnes. The project is expected to make annual attributable copper production of 300,000 tonnes achievable.」

    The decision to enter the QB2 project established a specific plan involving production start-up in the second half of 2021, a mine life of approximately 28 years and average annual copper production of approximately 240,000 tonnes, demonstrating the feasibility of the 300,000-tonne annual attributable copper target.
  14. FY2019-Q3AdvancedAnnual report

    「In the Resources business, the Company reached an agreement with Teck Resources, a Canadian major resources company, to acquire a 25% interest in the Quebrada Blanca copper mine held by Teck Resources, bringing annual attributable copper production of 300,000 tonnes into view.」

    The agreement to acquire a 25% interest in the Quebrada Blanca copper mine represents concrete progress toward the target of annual attributable copper production of 300,000 tonnes.
  15. FY2019-Q1RestatedAnnual report

    「Under its long-term vision, the Resources business aims to achieve annual attributable production of 300,000 tonnes of copper and 30 tonnes of gold in fiscal 2021.」

    The fiscal 2021 target of annual attributable production of 300,000 tonnes of copper and 30 tonnes of gold is reaffirmed.
  16. FY2018RestatedAnnual report

    「Under its long-term vision, the Resources business aims to achieve annual attributable production of 300,000 tonnes of copper and 30 tonnes of gold in fiscal 2021. For copper, annual attributable production of 300,000 tonnes is coming into view through the expansion of overseas copper mines already in operation, the start of commercial production at the Sierra Gorda project and the acquisition of additional interests in the Morenci copper mine.」

    The target of annual attributable production of 300,000 tonnes of copper and 30 tonnes of gold in fiscal 2021 is reaffirmed, together with the means of achieving it through mine expansions, commercial production and interest acquisitions.
  17. FY2018-Q3RestatedAnnual report

    「We will pursue our growth strategy with the aim of establishing annual nickel production capacity of 150,000 tonnes, annual attributable production of 300,000 tonnes of copper and 30 tonnes of gold, ordinary profit of ¥5 billion per year from new materials products, annual consolidated revenue of ¥1 trillion and annual profit attributable to owners of the parent of ¥100 billion.」

    The target of annual attributable production of 300,000 tonnes of copper and 30 tonnes of gold is reaffirmed.
  18. FY2018-Q1RestatedAnnual report

    「Taking these changes in the operating environment into account, the Company will sustainably grow its three core businesses of Resources, Smelting and Materials and pursue its growth strategy with the aim of becoming a “Global Non-Ferrous Metals Leader” and an “Excellent Japanese Company,” including by establishing annual nickel production capacity of 150,000 tonnes, annual attributable production of 300,000 tonnes of copper and 30 tonnes of gold, ordinary profit of ¥5 billion per year from new materials products, annual consolidated revenue of ¥1 trillion and annual profit attributable to owners of the parent of ¥100 billion.」

    The target of annual attributable production of 300,000 tonnes of copper and 30 tonnes of gold is reaffirmed. The acquisition of an interest in the Côté Gold development project was already reported in the previous filing and is reiterated here.
  19. FY2017AdvancedAnnual report

    「Under its long-term vision, the Company has set a target of increasing its attributable share of gold production to 30 tonnes per year, and the acquisition of an interest in the Côté Gold development project advances the Company toward that target.」

    On 20 June 2017, the Company acquired a 27.75% interest in the Côté Gold development project, representing concrete progress toward the target of 30 tonnes of gold production per year.
  20. FY2017-Q3RestatedAnnual report

    「We will pursue our growth strategy with the aim of establishing annual nickel production capacity of 150,000 tonnes, annual attributable production of 300,000 tonnes of copper and 30 tonnes of gold, ordinary profit of ¥5 billion per year from new materials products, annual consolidated revenue of ¥1 trillion and annual profit attributable to owners of the parent of ¥100 billion.」

    The target of annual attributable production of 300,000 tonnes of copper and 30 tonnes of gold is reaffirmed.
  21. FY2017-Q2RestatedAnnual report

    「We will pursue our growth strategy with the aim of establishing annual nickel production capacity of 150,000 tonnes, annual attributable production of 300,000 tonnes of copper and 30 tonnes of gold, ordinary profit of ¥5 billion per year from new materials products, annual consolidated revenue of ¥1 trillion and annual profit attributable to owners of the parent of ¥100 billion.」

    The growth targets include annual attributable production of 300,000 tonnes of copper and 30 tonnes of gold.
  22. FY2017-Q1RestatedAnnual report

    「In the Resources business, we are pursuing exploration and entry into development projects with the long-term vision of achieving annual attributable production of 300,000 tonnes of copper and 30 tonnes of gold in fiscal 2021.」

    The fiscal 2021 target of annual attributable production of 300,000 tonnes of copper and 30 tonnes of gold, together with exploration and entry into development projects, is reaffirmed.
  23. FY2016First statedAnnual report

    「In the Resources business, we are pursuing exploration and entry into development projects with the long-term vision of achieving annual attributable production of 300,000 tonnes of copper and 30 tonnes of gold in fiscal 2021.」

    Production target for attributable resource interests, with fiscal 2021 as the deadline.
Moved together

"Exploration, Mine Development and Expansion of High-Quality Resource Interests" moved the same way as this thread, in the same document, in 5 of its 23 moves.

532222★123456
  1. ★This thread
  2. 1Exploration, Mine Development and Expansion of High-Quality Resource Interests5×
  3. 2Transitioning the Business Portfolio toward Battery and Crystal Materials3×
  4. 3HPAL Technology Innovation and Recovery of New Resources2×
  5. 4Three-Business Collaboration Centered on Battery Cathode Materials and Battery Recycling2×
  6. 5Annual Gold Sales of 6 Tonnes from the Hishikari Mine2×
  7. 6Allocating R&D Resources to Priority Technology Areas2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Sumitomo Metal Mining yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Annual Attributable Production of 300,000 Tonnes of Copper and 30 Tonnes of Gold | Sumitomo Metal Mining Co.,Ltd. (5713) | Komori