Risk of Operating Interruptions Due to Equipment Accidents and Occupational Accidents

First written in FY2020. 3 of 5 entries say "Mitigated", first in FY2022. Latest entry: FY2026.

5entries
7years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2020MitigatedFY2022RestatedFY2025-H12020: 120202021: 020212022: 120222023: 020232024: 120242025: 120252026: 12026
Same theme, other companies
Risk of operational impacts from aging and failures of production equipment and occupational accidentsA theme 9 companies write about · 9 as a headwind · 0 as a tailwind

The whole theme swung hardest in 2026: 2 of 7 companies on the "Worse" side.

1 other company's latest entry also says "Mitigated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026MitigatedAnnual report

    「The total capital investment made during the consolidated fiscal year was ¥11.2 billion. Major projects included installing an energy-saving, low-CO2 electric furnace at the Sakai Plant of the Osaka Operations Site, replacing the harmonic filter for an electric furnace, and replacing a steelmaking crane at the West Japan Kumamoto Plant.」

    As measures to replace aging equipment and ensure stable operations, the Company replaced the electric-furnace harmonic filter at the Sakai Plant and the steelmaking crane at the Kumamoto Plant.
  2. FY2026-H1MitigatedAnnual report

    「The Company is also carrying out investments to replace aging equipment, including replacing cranes at the West Japan Kumamoto Plant, in line with its plans.」

    As a measure against the risk of operating interruptions caused by equipment accidents and occupational accidents, the Company carried out planned investment to replace aging equipment, including cranes.
  3. FY2025-H1RestatedAnnual report

    「The Company promoted cost reductions through steady improvements in yield and unit consumption centered on frontline activities, as well as efforts to strengthen stable production by enhancing equipment inspections and maintenance while production was declining.」

    The Company continues efforts to ensure stable production by strengthening equipment inspections and maintenance. No new completed measures were disclosed in response to the risks of equipment accidents and occupational accidents.
  4. FY2022MitigatedAnnual report

    「The Group is promoting measures to establish and strengthen its foundations on both the human and equipment sides, including securing personnel, human-resource development and skills transfer through safety, environmental and disaster-prevention training, daily equipment maintenance and the replacement of aging equipment.」

    In response to the risks of equipment accidents and occupational accidents, the Company is implementing a combination of measures including securing personnel, safety, environmental and disaster-prevention training, skills transfer, routine maintenance and replacement of aging equipment.
  5. FY2020First statedAnnual report

    「If an electrical or mechanical accident, fire, explosion or occupational accident occurs at these facilities, part of the operations may be interrupted and production or shipments delayed, resulting in expenses and compensation payments and potentially adversely affecting the Group’s business results and financial condition.」

    The Company has disclosed the risks of accidents, fires, explosions and occupational accidents involving critical facilities such as electric furnaces, continuous casters, reheating furnaces and rolling mills as a standalone risk category.
Moved together

"Steel Scrap Recycling, Resource Conservation and Energy Conservation" moved the same way as this thread, in the same document, in 3 of its 5 moves.

322222★123456
  1. ★This thread
  2. 1Steel Scrap Recycling, Resource Conservation and Energy Conservation3×
  3. 2Building the Foundation for Talent Development and Skills Transfer2×
  4. 3Achieving 20% Energy and Electricity Savings2×
  5. 4Optimization of the Production System in the Osaka Area and Consolidation of Ironmaking Processes2×
  6. 5Refresh and Renewal Investment in Core Facilities2×
  7. 6Risk of Delayed Commissioning and Failure to Realize Benefits from Capital Investments2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Osaka Steel's next results are scheduled for 2026-11-04. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Risk of Operating Interruptions Due to Equipment Accidents and Occupational Accidents | OSAKA STEEL CO.,LTD. (5449) | Komori