Achieving 20% Energy and Electricity Savings
First written in FY2016. 13 of 29 entries say "Restated". Latest entry: FY2026.
29 other companies' latest entry also says "Advanced".
- FY2026AdvancedAnnual report
「We continued steady improvements in yield and energy intensity centered on shop-floor activities and carried out planned capital investments at each site, including starting operations at the energy-saving, low-CO2 electric furnace at the Sakai Plant in February this year.」
The energy-saving, low-CO2 electric furnace at the Sakai Plant began operations in February this year. No results are stated for achieving the previous 20% energy and power conservation target itself. - FY2026-H1SoftenedAnnual report
「For the installation of the energy-saving, low-CO2 electric furnace at the Sakai Plant, we reviewed the construction period in light of adjustments to the construction schedule and other factors and are working toward starting operations within the current fiscal year. We are also carrying out planned replacement investments for aging equipment, including crane replacement at the Kumamoto Plant.」
For the energy-saving, low-CO2 electric furnace, the construction schedule was reviewed from the previous planned completion in October 2025, and the start-up plan was changed to within the current fiscal year. Meanwhile, replacement investments for aging equipment, including crane replacement at the Kumamoto Plant, are being carried out as planned. - FY2025AdvancedAnnual report
「We continued steady improvements in yield and energy intensity centered on shop-floor activities and carried out planned capital investments at each site, including starting the main construction work for the energy-saving, low-CO2 electric furnace at the Sakai Plant, scheduled for completion in 2025, and completing the new product warehouse at the West Japan Kumamoto Plant.」
The energy-saving, low-CO2 electric furnace project at the Sakai Plant progressed from foundation work to the start of main construction, and the plan for completion in 2025 continues. - FY2025-H1AdvancedAnnual report
「Regarding capital investment, foundation work has begun on the energy-saving, low-CO2 electric furnace at the Sakai Plant, for which a decision was made last fiscal year and completion is scheduled for fiscal 2025. The product warehouse at the West Japan Kumamoto Plant was completed in July this year, and we are improving truck drivers' working conditions by shortening loading times. Investment plans are progressing as scheduled.」
Foundation work has begun on the energy-saving, low-CO2 electric furnace at the Sakai Plant, representing concrete progress toward completion in fiscal 2025. - FY2024AdvancedAnnual report
「We continued steady improvements in yield and energy intensity centered on shop-floor activities, while benefiting from improvements generated by capital investments such as the rolling-line extension work at the Kishiwada Plant and the installation of flue-gas analysis equipment at 東京鋼鐵, thereby working to contain the impact of rising energy and commodity prices. During the period, we also worked to strengthen our business platform for the future, including deciding to install an energy-saving, low-CO2 electric furnace at the Sakai Plant, build a new product warehouse and expand solar power generation facilities at the Kumamoto Plant, and transfer rail-processing equipment at the Onが島 Plant.」
In addition to improving yield and energy intensity and benefiting from flue-gas analysis equipment, we are advancing several specific initiatives, including an energy-saving, low-CO2 electric furnace, solar power generation facilities and the transfer of rail-processing equipment. - FY2024-Q3RestatedAnnual report
「OSAKA STEEL CO.,LTD. Sakai Plant, Osaka Operations Office (Sakai City, Osaka Prefecture) Electric furnace equipment 11,839 3 Internal funds November 2023 October 2025 Reduction in power intensity, among other benefits」
For the Sakai Plant electric-furnace equipment project, the planned total investment of ¥11,839 million, start of work in November 2023, scheduled completion in October 2025, and benefits including reduced power intensity have been reiterated. No new completion results are stated. - FY2024-Q2AdvancedAnnual report
「During the first half of the fiscal year, we improved yield and energy intensity through the effects of the rolling-line extension work at our Kishiwada Plant carried out last fiscal year and the investment in flue-gas analysis equipment at Group company 東京鋼鐵. We also continued to develop the systems infrastructure needed to further strengthen quality control. With regard to establishing our business platform, following the consolidation of plants and optimization of fixed costs through the rolling-line reinforcement project at the Osaka Operations Office completed last fiscal year, we decided in August this year to install an energy-saving, low-CO2 electric furnace at the Sakai Plant of the Osaka Operations Office. We are working toward starting operations in 2025 while significantly improving variable costs, particularly energy costs, and reducing CO2 emissions.」
東京鋼鐵 improved yield and energy intensity using flue-gas analysis equipment, while the Sakai Plant decided to install an energy-saving, low-CO2 electric furnace. A target start-up date of 2025 was also stated. - FY2023-Q2AdvancedAnnual report
「In addition to strengthening the cost competitiveness of each site through initiatives such as starting investments at the Kishiwada Plant that will improve costs and energy efficiency and transferring production of certain products from our Sakai Plant to 東京鋼鐵, we are also working to establish an optimal production structure across the Group.」
The pursuit of energy and power conservation is described specifically through the start of investments at the Kishiwada Plant that will contribute to energy savings. - FY2022AdvancedAnnual report
「Construction work to strengthen the rolling line at the Osaka Operations Office was completed in fiscal 2020, and certification and approval for major product types were completed in fiscal 2021. As commercial production began, we worked to improve the direct-delivery rate of hot billets from steelmaking to rolling as a result of production consolidation, and energy-saving effects have also begun to emerge.」
Completion of the rolling-line reinforcement project, acquisition of certification and approval for major product types, and the start of commercial production have resulted in improved direct delivery of hot billets and the emergence of energy-saving effects. - FY2021ReframedAnnual report
「On 28 April this year, we formulated and announced the OSAKA STEEL CO.,LTD. Group Medium-Term Management Plan, whose primary objective is to contribute to society by contributing to a circular and decarbonized society through steel recycling using electric furnaces and, as a top supplier, further strengthening our manufacturing capabilities and cost and quality competitiveness so that we can supply products that meet customer needs.」
The previous pursuit of energy and power conservation is positioned as an issue under the new medium-term plan, which includes electric-furnace recycling, contributions to a decarbonized society, and stronger manufacturing capabilities and cost competitiveness. The previous 20% target is not reiterated. - FY2021-Q2RestatedAnnual report
「In addition to further strengthening quality and product competitiveness and pursuing energy and power conservation, we have actively promoted measures to ensure thorough compliance, recruit and train personnel capable of supporting sustainable business development, pass on skills, and strengthen the foundations for safety, health, environmental and disaster-prevention measures. We have also actively pursued thorough cost reductions through operational efforts rooted in the shop floor and actual conditions.」
The pursuit of energy and power conservation continues alongside stronger quality and product competitiveness, infrastructure development and cost reductions. The previous 20% numerical target is not stated. - FY2020AdvancedAnnual report
「To further pursue energy and power conservation, we installed equipment at the Sakai Plant of the Osaka Operations Office to improve the stirring capacity of molten steel in the electric furnace, as well as multifunctional burners and other equipment at the West Japan Kumamoto Plant.」
The previous pursuit of energy and power conservation has advanced to specific capital measures, including equipment to improve molten-steel stirring capacity in the electric furnace and the installation of multifunctional burners. - FY2020-Q3RestatedAnnual report
「We have also worked to further pursue energy-efficient and resource-saving operations and to achieve thorough cost reductions through operational efforts rooted in the shop floor and actual conditions.」
The pursuit of energy-efficient and resource-saving operations continues. The previous numerical target of 20% for energy and power conservation is not stated. - FY2020-Q2RestatedAnnual report
「We have also worked to further pursue energy-efficient and resource-saving operations and to achieve thorough cost reductions through operational efforts rooted in the shop floor and actual conditions.」
Energy-efficient and resource-saving operations and shop-floor-based cost reductions continue. The previous numerical target of 20% for energy and power conservation is not stated. - FY2020-Q1RestatedAnnual report
「Amid this business environment, the Group has strengthened safety, health, environmental and disaster-prevention risk management while enhancing and reinforcing compliance, and has further strengthened quality and product competitiveness. We have also pursued greater energy and power conservation and thorough cost reductions through operational efforts rooted in the shop floor and actual conditions.」
Energy and power conservation continues to be pursued. The previous 20% numerical target is not stated. - FY2019RestatedAnnual report
「We will continue to pursue thorough energy-saving and productivity improvement measures and work to further strengthen our cost competitiveness, which is among the highest in the industry.」
Energy-saving and productivity improvement measures continue. The previous 20% numerical target is again not stated. - FY2019-Q3RestatedAnnual report
「We have also worked to reduce costs in response to changes in the external environment, including the pursuit of more energy-efficient and resource-saving operations.」
Cost reductions through energy-efficient and resource-saving operations continue. The previous 20% numerical target is again not stated. - FY2019-Q2RestatedAnnual report
「While pursuing thorough cost reductions through operational efforts rooted in the shop floor and actual conditions, we have also worked to reduce costs in response to changes in the external environment, including the further pursuit of energy-efficient and resource-saving operations.」
The previous numerical target of 20% for energy and power conservation is not stated, but cost reductions through energy-efficient and resource-saving operations continue. - FY2019-Q1RestatedAnnual report
「We have also worked to reduce costs in response to changes in the external environment, including the pursuit of more energy-efficient and resource-saving operations.」
The previous energy-saving measures continue as initiatives involving resource-saving operations and cost reductions in response to the external environment. No 20% numerical target is stated. - FY2018RestatedAnnual report
「We will continue to pursue thorough energy-saving measures and productivity improvements and work to further strengthen our cost competitiveness, which is among the highest in the industry.」
The continuation of energy-saving measures is explicitly stated, but the previous numerical target of 20% for energy and power conservation is not included. - FY2018-Q1SoftenedAnnual report
「Under these circumstances, we have further pursued energy and power conservation, quality improvements and stronger product competitiveness, while maintaining a safety-first and shop-floor-first approach. We have also deepened GoZERO activities rooted in the shop floor and actual operations and implemented steady cost reductions.」
Energy and power conservation continues to be pursued, but the previously stated numerical target of 20% is not included this time. - FY2017-Q3RestatedAnnual report
「Amid this business environment, the Group has been actively installing energy-saving equipment while strengthening and enhancing compliance, with the aim of achieving its top management priority of reducing energy and power consumption by 20%.」
The 20% energy and power conservation target has been reiterated as the top management priority, and the installation of energy-saving equipment continues. - FY2017-Q2RestatedAnnual report
「Amid this challenging business environment, the Group has been actively installing energy-saving equipment while strengthening and enhancing compliance, with the aim of achieving its top management priority of reducing energy and power consumption by 20%.」
The 20% energy and power conservation target has been reiterated as the top priority, and the installation of energy-saving equipment continues. - FY2017-Q1RestatedAnnual report
「In particular, we are promoting measures to concentrate iron sources at Sakai Steelmaking and improve energy-saving technologies and operations toward achieving the 20% energy-saving target.」
The 20% energy-saving target has been reiterated, and energy-saving technology and operating improvements continue. - FY2016First statedAnnual report
「The Group has been actively installing energy-saving equipment to achieve its top management priority of reducing energy and power consumption by 20%. Measures have included maintaining the direct-delivery rate of billets from the steelmaking process to the rolling process, installing high-efficiency ladle preheating burners at the Sakai Plant, and installing flue-gas analysis equipment at the West Japan Kumamoto Plant.」
The stated measures are maintaining the direct-delivery rate of billets, installing high-efficiency burners and flue-gas analysis equipment, and improving the operating rate.