Lower Factory Utilization and Higher Fixed-Cost Burden Due to Construction and Delivery Delays

First written in FY2018. 3 of 6 entries say "Materialised", first in FY2018. Latest entry: FY2021.

6entries
4years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseMaterialisedFY2018 – FY2019-Q2MitigatedFY2019 – FY20212018: 320182019: 220192020: 020202021: 12021
Same theme, other companies
Operating profit volatility due to fixed-cost burden and sales fluctuationsA theme 30 companies write about · 30 as a headwind · 0 as a tailwind

The whole theme swung hardest in 2020: 7 of 20 companies on the "Worse" side.

9 other companies' latest entry also says "Mitigated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 30 companies compared. The sentences above are computed from all 30.
Full recordFilings, disclosures and news, newest first
  1. FY2021MitigatedAnnual report

    「We have withdrawn from the product manufacturing business. Going forward, we will conduct sales activities centered on product planning, based on a fabless model without manufacturing facilities.」

    製造部門から撤退しファブレス化することで、従来の工期・納期遅延に伴う工場稼働率低下や固定費負担へのエクスポージャーが縮小する方向が示された。
  2. FY2019MitigatedAnnual report

    「建築部材等の順調な販売活動や各工場稼働率の向上及び原価低減努力をしたもののセグメント損失となりました。」

    各工場の稼働率は向上し、工期・納期遅延に伴う稼働率低下の影響は前年度より緩和したが、工場集約化に伴う臨時費用等により損失は残った。
  3. FY2019-Q3RestatedAnnual report

    「マテリアル事業におきましては、工期遅延や納期遅延等物件の建築部材が出荷されたことに加え、新規案件である継続受注の建築部材の出荷開始により増収となりましたが」

    工期・納期遅延物件が引き続き存在し、その建築部材が出荷されたことを記載した。
  4. FY2019-Q2MaterialisedAnnual report

    「工期遅延や納期遅延物件の建築部材売上が実現し増収となりましたが」

    工期・納期遅延物件が引き続き存在し、その建築部材売上が実現したことを記載した。
  5. FY2019-Q1MaterialisedAnnual report

    「マテリアル事業におきましては、工期遅延や納期遅延物件等の建築部材売上が実現し増収となりましたが、新規物件である継続出荷の見込める建築部材の初期費用が嵩んだことにより、セグメント損失の結果となりました。」

    工期・納期遅延物件が実際に発生した状態が続き、建築部材売上の実現と新規物件の初期費用負担が同時に記載された。
  6. FY2018MaterialisedAnnual report

    「Delays in construction schedules and delivery schedules for contracted projects lowered utilization at each plant and increased the fixed-cost burden, resulting in lower revenue and profit.」

    Construction and delivery delays actually occurred and affected the Materials Business through lower plant utilization and a higher fixed-cost burden.
Moved together

"Significant Increases in Revenue and Profit in the Real Estate Development Business" moved the same way as this thread, in the same document, in 4 of its 6 moves.

433333★123456
  1. ★This thread
  2. 1Significant Increases in Revenue and Profit in the Real Estate Development Business4×
  3. 2Performance fluctuations due to the timing of real estate property deliveries3×
  4. 3Lower revenue and earnings in the leasing, management and related businesses3×
  5. 4Higher revenue and profit in the Materials business, which returned to profitability3×
  6. 5Return to Positive Operating Cash Flow3×
  7. 6Inventory Write-Downs Due to Lower Profitability3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Yoshicon's next results are scheduled for 2026-10-30. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.