Komori
Toyo Asano Foundation (5271) · InitiativeCited as achieved

Smart Energy Business at the Tokyo Plant

First written in FY2020. 1 of 4 entries say "Advanced", first in FY2021. Latest entry: FY2024.

4entries
5years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2020AdvancedFY2021 – FY20222020: 120202021: 120212022: 120222023: 020232024: 12024
Same theme, other companies
Tokyo Plant Smart Energy BusinessA theme 2 companies write about · 0 as a headwind · 2 as a tailwind

0 other companies' latest entry also says "Cited as achieved".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2024Cited as achievedAnnual report

    「The smart energy business, in which we participated and for which we built power generation facilities at the Tokyo Plant, received the Excellence Award at the Cogeneration Grand Prize 2023.」

    The filing reports that the smart energy business at the Tokyo Plant had progressed to the operating phase and received the Excellence Award at the Cogeneration Grand Prize 2023.
  2. FY2022AchievedAnnual report

    「“瑞穂町地域スマートエネルギー株式会社,” which was brought to the Tokyo Plant last fiscal year, is also in operation. Through energy conservation, it is reducing carbon dioxide emissions and utility costs while contributing to regional disaster preparedness as an energy supply facility resilient to disasters.」

    The smart energy business has progressed from the attraction and launch phase to the operating phase, achieving reductions in carbon dioxide emissions and utility costs and contributing to regional disaster preparedness.
  3. FY2021AdvancedAnnual report

    「The refurbishment of core equipment at the Tokyo Plant and the smart energy business are progressing steadily.」

    The company states that the refurbishment of core equipment at the Tokyo Plant and the smart energy business have progressed steadily from the launch and planning stages described previously. The combined investment plan for both businesses is approximately ¥2.0 billion.
  4. FY2020First statedAnnual report

    「At the Tokyo Plant, refurbishment of core equipment and the smart energy business are under way, and the company will steadily advance construction work in fiscal 2020. Planned investment in the core equipment refurbishment and smart energy business combined is approximately ¥2.0 billion. The investment is intended to improve and maintain the competitiveness of the company’s main plant, reduce environmental impact, particularly carbon dioxide emissions, and achieve sustainable business growth.」

    The company states for the first time that it has launched its smart energy business at the Tokyo Plant and plans to invest approximately ¥2.0 billion in it together with the core equipment refurbishment, with the aim of maintaining competitiveness and reducing environmental impact.
Moved together

"Further Improvement in Construction Quality through Stronger Construction Management Systems" moved the same way as this thread, in the same document, in 2 of its 4 moves.

22★12
  1. ★This thread
  2. 1Further Improvement in Construction Quality through Stronger Construction Management Systems2×
  3. 2Improving production capacity through refurbishment of core equipment at the Tokyo Plant2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Toyo Asano Foundation yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.