Asahi Concrete Works (5268) · InitiativeRestated
Strengthening Proposals Through the Use of CIM, Including 3D Spatial Models
First written in FY2024-Q3. 5 of 6 entries say "Restated". Latest entry: 2026-08-07.
6entries
3years
2from disclosures
How it moved
Same theme, other companies
Improving Construction Productivity Through Structural Construction Methods, BIM, and PrefabricationA theme 9 companies write about · 0 as a headwind · 12 as a tailwind
4 other companies' latest entry also says "Restated".
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
- FY2026-H1RestatedAnnual report
「工事期間の短縮に資するプレキャスト化の提案に、CIM(3D空間モデル、3Dプリンターモデル等のデジタル技術)を積極的に活用して、販売・設計部門が一体となった活動を行い」
プレキャスト化提案へのCIM活用を継続し、販売・設計部門が一体となった受注活動として実施している。 - FY2025-H1RestatedAnnual report
「受注に繋げる設計織込活動、工期短縮に資するプレキャスト化の提案に、CIM(3D空間モデル、3Dプリンターモデル等のデジタル技術)を積極的に活用した受注活動を、販売・設計部門が一体となり行いました。」
設計織込み・プレキャスト化提案へのCIM活用を、販売・設計部門一体の受注活動として継続している。 - FY2024RestatedAnnual report
「営業においては、受注に繋げる3D技術を駆使した設計織込み活動及び選別受注に注力するとともに、工期短縮に資するプレキャスト化提案など現場のニーズに直結する営業を推進します。」
設計織込み・プレキャスト化提案に3D技術を活用するCIM型の提案強化を継続している。 - FY2024-Q3First statedAnnual report
「We actively pursued initiatives including the use of CIM, comprising digital technologies such as 3D spatial models and 3D printer models, in design-incorporation activities that lead to orders and proposals for precast construction that contribute to shorter construction periods.」
The company first explicitly disclosed the use of CIM, including 3D spatial models and 3D printer models, in design-incorporation activities and precast-construction proposals aimed at shortening construction periods.