Nippon Sheet Glass (5202) · InitiativeAchieved

Repair and Restart of Float Furnaces in Ottawa, U.S., and Venice, Italy

First written in FY2017. 2 of 4 entries say "Advanced", first in FY2018-Q1. Latest entry: FY2018-Q3.

4entries
2years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2017AdvancedFY2018-Q1 – FY2018-Q32017: 320172018: 12018
Same theme, other companies
Repair and Restart of Float Furnaces in Ottawa, U.S., and Venice, ItalyA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2018-Q3AchievedAnnual report

    「The float furnace at the Venice plant in Italy restarted during the third quarter. The float furnace at the Ottawa plant restarted from the end of the third quarter.」

    The float furnace at the Venice plant in Italy restarted during the third quarter, and the float furnace at the Ottawa plant in the US restarted from the end of the third quarter, completing the planned restarts at both sites.
  2. FY2018-Q2AdvancedAnnual report

    「As announced on 12 May 2017, repairs (cold repair) are being carried out on the float furnace at the Ottawa plant, temporarily reducing the Group's production capacity in North America.」

    Repairs to the Ottawa plant's float furnace are under way, temporarily reducing production capacity in North America.
  3. FY2018-Q1AdvancedAnnual report

    「As announced on 12 May 2017, repairs (cold repair) are being carried out on the float furnace at the Ottawa plant, temporarily reducing the Group's production capacity in North America.」

    The company states that repairs to the Ottawa plant's float furnace are under way and that production capacity has temporarily declined.
  4. FY2017First statedAnnual report

    「The Group's major capital investments planned for the 1-year period after the end of the current consolidated fiscal year, namely the fiscal year ending March 2018, include an investment of ¥5.9 billion in the architectural glass business to carry out scheduled repairs and restart the float furnace in Ottawa, Illinois, US, and an investment of ¥2.0 billion in the architectural glass business to restart the float furnace in Venice, Italy, among others.」

    The company specified the investment amount and timing for repairing and restarting the furnace at the Ottawa plant following tornado damage, and for restarting the idle line at the Venice plant in Italy, in the fiscal year ending March 2018.
Moved together

"Risk of raising funds required in the future" moved the same way as this thread, in the same document, in 3 of its 4 moves.

33322★12345
  1. ★This thread
  2. 1Risk of raising funds required in the future3×
  3. 2Cost Reduction and Restructuring3×
  4. 3Production Interruption Risk3×
  5. 4Raw Material and Fuel Prices and Supply Risks2×
  6. 5Decline in the Ratio of Equity Attributable to Owners of the Parent2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Nippon Sheet Glass yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Repair and Restart of Float Furnaces in Ottawa, U.S., and Venice, Italy | Nippon Sheet Glass Company,Limited (5202) | Komori