Risk of Production Interruptions Due to Disasters, Fires and Earthquakes
First written in FY2016. 4 of 11 entries say "Restated". Latest entry: FY2024.
The whole theme swung hardest in 2018: 32 of 132 companies on the "Worse" side.
- FY2024RestatedAnnual report
「However, there is no assurance that the effects of disruptions caused by disasters, fires, power outages or other events occurring at production facilities can be completely prevented. Fire insurance is maintained for all production sites, but depending on the scale of a disaster, insurance may not cover all losses.」
While conducting preventive inspections, equipment inspections, diversifying production sites and maintaining insurance coverage, it continues to recognize that the effects of disasters, fires and power outages cannot be completely prevented. - FY2023RaisedAnnual report
「(4) Risks related to disasters, fires, earthquakes and infectious diseases」
It expands the scope of the risk category by expressly including the effects of infectious diseases on procurement, production and logistics alongside the existing risk of production disruptions caused by disasters, fires, earthquakes and power outages. - FY2022RestatedAnnual report
「However, there is no assurance that the effects of disruptions caused by disasters, fires, power outages or other events occurring at production facilities can be completely prevented.」
While conducting equipment inspections, diversifying production sites and maintaining insurance coverage, it continues to recognize that production disruptions caused by disasters, fires and power outages cannot be completely prevented. - FY2021RestatedAnnual report
「However, there is no assurance that the effects of disruptions caused by disasters, fires, power outages or other events occurring at production facilities can be completely prevented.」
While conducting preventive inspections, equipment inspections, diversifying production sites and maintaining insurance coverage, it continues to recognize that the effects of disasters, fires and power outages cannot be completely prevented. - FY2020AdvancedAnnual report
「In the Industrial Materials Business, the Company made investments totaling ¥1,879 million in the construction of new urethane production equipment and buildings (restoration of the plant destroyed by the fire), the introduction of industrial materials manufacturing equipment and other projects.」
It states that ¥1,879 million was invested in capital expenditures, including restoration of the plant destroyed by the fire, indicating progress on the restoration project. - FY2020-Q2Further postponement of completion of the fire restoration projectAnnual report
「Shiga No. 2 Plant (Toyosato, Shiga) | Industrial materials business | New urethane manufacturing equipment and building | ¥664 million | July 2018 | November 2019 | Expansion of production capacity」
For the restoration equipment at the Shiga No. 2 Plant destroyed by the fire in March 2018, the scheduled completion date was postponed again, from August to November 2019. - FY2019AdvancedAnnual report
「Shiga No. 2 Plant Industrial Materials Business Construction of new urethane production equipment and buildings 664 283 Internal funds and borrowings July 2018 August 2019 Increase in production capacity」
For the Shiga No. 2 Plant destroyed by the fire in March 2018, it states that a ¥664 million restoration equipment project was under way, ¥283 million had already been paid, and completion was scheduled for August 2019. - FY2019-Q2Detailed planning for fire restorationAnnual report
「This concerns the restoration of the plant destroyed by the fire that occurred in March 2018.」
Following the fire at the Shiga No. 2 Plant, plans to construct new urethane production equipment and buildings for restoration have taken concrete form. - FY2018MaterialisedAnnual report
「This is the amount of the loss caused by the fire that occurred on 26 March 2018 at the urethane plant within the Shiga No. 2 Plant. The breakdown consists of losses from the destruction of property, plant and equipment and inventories, as well as restoration costs and other expenses.」
A fire occurred at the urethane plant within the Shiga No. 2 Plant, and a fire loss of ¥164 million was recognized. - FY2017RestatedAnnual report
「However, there is no assurance that the effects of disruptions caused by disasters, fires, power outages or other events occurring at production facilities can be completely prevented. Fire insurance is maintained for all production sites, but depending on the scale of a disaster, insurance may not cover all losses.」
It continues to state that, despite conducting regular inspections, equipment inspections, diversifying production sites and maintaining insurance coverage, the effects of disasters, fires and power outages cannot be completely prevented. - FY2016First statedAnnual report
「However, there is no assurance that the effects of disruptions caused by disasters, fires, power outages or other events occurring at production facilities can be completely prevented.」
While conducting regular inspections, equipment inspections, diversifying production sites and maintaining insurance coverage, it states that the effects of disruptions caused by disasters and other events cannot be completely prevented.