Climate Change Scenario Analysis and GHG Emissions Reduction
First written in FY2023. 3 of 4 entries say "Advanced", first in FY2024. Latest entry: FY2026.
7 other companies' latest entry also says "Advanced".
- FY2026AdvancedAnnual report
「Scope 1 and Scope 2 emissions Fiscal year ended March 2025 actual: 1,040.210 t-CO2 (entire group) Scope 3 emissions (Categories 1, 2, 4, 5, 6 and 7) Fiscal year ended March 2025 actual: 14,623.196 t-CO2 (アイティフォー standalone)」
Scope 1 and 2 emissions were updated to 1,040.210 t-CO2 for the entire group, and Scope 3 emissions to 14,623.196 t-CO2 on a standalone basis. - FY2025AdvancedAnnual report
「Scope 1 and Scope 2 emissions Fiscal year ended March 2024 actual: 716.277 t-CO2 (entire group) Scope 3 emissions (Categories 1, 2, 4, 5, 6 and 7) Fiscal year ended March 2024 actual: 17,462.705 t-CO2 (アイティフォー standalone)」
The company disclosed Scope 1 and 2 emissions of 716.277 t-CO2 for the entire group and Scope 3 emissions for the applicable categories of 17,462.705 t-CO2 on a standalone basis, expanding the scope of its emissions disclosure. - FY2024AdvancedAnnual report
「Scope 1 and Scope 2 emissions Fiscal year ended March 2022 actual: 444 t-CO2 For Scope 3, calculations for upstream emissions have begun.」
Scope 1 and 2 emissions were updated to 444 t-CO2 for the fiscal year ended March 2022, and calculations of upstream Scope 3 emissions were begun. Analysis using below-2°C and 4°C scenarios through 2050 is also continuing. - FY2023First statedAnnual report
「For transition risks, we used below-2°C and 4°C scenarios for policy and regulatory risks and market risks, and for physical risks, we used them for acute risks, conducting scenario analysis through 2050. As a result, we projected no material impact. Scope 1 and Scope 2 emissions 2021 actual: 454 t-CO2 *2022 figures are being compiled」
The company conducted an analysis through 2050 using below-2°C and 4°C scenarios for climate change risks and projected no material impact. Scope 1 and 2 emissions were 454 t-CO2 in 2021, while Scope 3 is under consideration for future disclosure.