“Building competitive factories” and expanding facilities in growth areas

First written in FY2016. 11 of 21 entries say "Advanced", first in FY2017. Latest entry: FY2026.

21entries
11years
4from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2017RestatedFY2021-Q2 – FY2022-Q2AdvancedFY20232016: 120162017: 120172018: 120182019: 320192020: 320202021: 120212022: 220222023: 120232024: 120242025: 220252026: 52026
Same theme, other companies
Targeted capital investment in growth and core areasA theme 49 companies write about · 0 as a headwind · 50 as a tailwind

37 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 49 companies compared. The sentences above are computed from all 49.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「Total capital investment during the consolidated fiscal year was ¥4,762 million, an increase of ¥2,367 million from the previous fiscal year. The principal facility completed during the consolidated fiscal year was the expansion of the third-phase production facilities and other facilities at TOHO CHEMICAL (SHANGHAI) CO., LTD.」

    Capital investment increased to ¥4,762 million, and the third-phase production facility expansion and other construction at TOHO CHEMICAL (SHANGHAI) CO., LTD. was completed.
  2. FY2026-H1RestatedAnnual report

    「Cash flow from investing activities during the interim consolidated accounting period was an outflow of ¥1,667 million, an increase of ¥344 million in the outflow year on year. The main factors behind the outflow were ¥1,587 million in payments for the acquisition of property, plant and equipment and ¥81 million in payments for the acquisition of intangible assets, among other items.」

    The company continued capital investment, mainly in the acquisition of property, plant and equipment. No specific completion milestone, such as the completion of a new facility, was mentioned.
  3. FY2025AdvancedAnnual report

    「The principal facilities completed during the consolidated fiscal year were construction of a refrigerated warehouse for hazardous materials at the Chiba Plant and the installation of advanced resin production facilities for electronic materials.」

    A refrigerated warehouse for hazardous materials and advanced resin production facilities for electronic materials were completed at the Chiba Plant, advancing the development of facilities to secure supply capacity and appropriate inventory levels in the electronic information materials field.
  4. FY2025-H1RestatedAnnual report

    「Cash flow from investing activities during the interim consolidated accounting period was an outflow of ¥1,322 million, an increase of ¥667 million in the outflow year on year. … The main factor behind the outflow was ¥1,561 million in payments for the acquisition of property, plant and equipment and other items.」

    The company continued capital investment, mainly in the acquisition of property, plant and equipment, with acquisition payments during the interim consolidated accounting period amounting to ¥1,561 million. No new facility completion was mentioned.
  5. FY2023AdvancedAnnual report

    「Total capital investment during the consolidated fiscal year was ¥2,119 million, a decrease of ¥3,249 million from the previous fiscal year. The principal facility completed during the consolidated fiscal year was the renewal of the main reactor at the Oppama Plant to accommodate hazardous materials and high-pressure gases.」

    Total capital investment was ¥2,119 million, and the renewal of the main reactor at the Oppama Plant to accommodate hazardous materials and high-pressure gases was completed. Investment continued for capacity expansion in growth fields, productivity improvements and the establishment of an optimal production system.
  6. FY2023-Q2RestatedAnnual report

    「Cash flow from investing activities was an outflow of ¥3,464 million, an increase of ¥775 million in the outflow year on year. This was mainly due to ¥3,666 million in payments for the acquisition of property, plant and equipment and other items.」

    The company continued capital investment, mainly in the acquisition of property, plant and equipment, and investing outflows increased by ¥775 million from the previous year. No new facility completion was mentioned.
  7. FY2022AdvancedAnnual report

    「Total capital investment during the consolidated fiscal year was ¥5,369 million, an increase of ¥229 million from the previous fiscal year. The principal facility completed during the consolidated fiscal year was the electronic information materials resin production plant at the Chiba Plant.」

    Capital investment increased to ¥5,369 million, and the electronic information materials resin production plant at the Chiba Plant was completed.
  8. FY2022-Q2RestatedAnnual report

    「Cash flow from investing activities was an outflow of ¥2,689 million, an increase of ¥704 million in the outflow year on year. This was mainly due to ¥2,590 million in payments for the acquisition of property, plant and equipment and other items.」

    The company spent ¥2,590 million on the acquisition of property, plant and equipment, continuing its capital investment. No identifiable milestone, such as the completion of a new facility, was mentioned.
  9. FY2021-Q2RestatedAnnual report

    「Cash flow from investing activities was an outflow of ¥1,984 million, an increase of ¥2 million in the outflow year on year. This was mainly due to ¥1,914 million in payments for the acquisition of property, plant and equipment and other items.」

    The company spent ¥1,914 million on the acquisition of property, plant and equipment, continuing its capital investment. No identifiable milestone, such as the completion of a new facility, was mentioned.
  10. FY2020AdvancedAnnual report

    「Total capital investment during the consolidated fiscal year was ¥4,429 million, an increase of ¥645 million from the previous fiscal year. The principal facilities completed during the consolidated fiscal year were an expansion of the electronic materials purification facilities at the Chiba Plant, renovation of the cogeneration system (gas turbine) at the Oppama Plant, and expansion of product storage tanks at the Kashima Plant.」

    Capital investment increased to ¥4,429 million, and the electronic materials purification facilities at the Chiba Plant, the cogeneration system at the Oppama Plant, and the product storage tank expansion at the Kashima Plant were completed.
  11. FY2020-Q3RestatedAnnual report

    「The main factors behind the changes in fixed assets were an increase of ¥1,433 million in property, plant and equipment, an increase of ¥183 million in intangible assets, and a decrease of ¥114 million in investments and other assets.」

    Property, plant and equipment increased by ¥1,433 million and intangible assets by ¥183 million, confirming that investment in facilities, systems and other assets is continuing. No specific milestone, such as the completion of a new facility, was mentioned.
  12. FY2020-Q2RestatedAnnual report

    「Cash flow from investing activities was an outflow of ¥1,982 million, an increase of ¥517 million in the outflow year on year. The main factors behind the outflow were ¥1,929 million in payments for the acquisition of property, plant and equipment and ¥191 million in payments for the acquisition of intangible assets, among other items.」

    The company incurred acquisition costs of ¥1,929 million for property, plant and equipment and ¥191 million for intangible assets, continuing to invest in facilities, systems and other assets. No identifiable milestone, such as the completion of a new facility, was mentioned.
  13. FY2019AdvancedAnnual report

    「The principal facilities completed during the consolidated fiscal year were a new automated high-rise warehouse for hazardous materials at the Chiba Plant and renovation work on solvent facilities at the Oppama Plant.」

    Total capital investment increased to ¥3,783 million, and the automated high-rise warehouse for hazardous materials at the Chiba Plant and renovation work on solvent facilities at the Oppama Plant were completed. Expansion of production facilities at the Shanghai subsidiary and facilities for electronic information materials were also planned.
  14. FY2019-Q3RestatedAnnual report

    「The main changes in fixed assets were an increase of ¥1,443 million in property, plant and equipment and a decrease of ¥180 million in investments and other assets.」

    Property, plant and equipment increased by ¥1,443 million, confirming that capital investment is continuing. However, no identifiable milestone, such as the completion of a new facility, was mentioned.
  15. FY2019-Q2RestatedAnnual report

    「Cash flow from investing activities was an outflow of ¥1,464 million, an increase of ¥1,079 million in the outflow year on year. This was mainly due to ¥1,395 million in payments for the acquisition of property, plant and equipment and other items.」

    The company spent ¥1,395 million on the acquisition of property, plant and equipment, confirming that capital investment is continuing. However, no identifiable milestone, such as the completion of a new facility, was mentioned.
  16. FY2017AdvancedAnnual report

    「Regarding capital investment during the consolidated fiscal year, we continued to invest in capacity expansion in growth fields, equipment upgrades at each plant, and research and development-related facilities, with the aim of promoting the development of competitive plants. Total capital investment during the consolidated fiscal year was ¥1,213 million, a decrease of ¥82 million from the previous fiscal year. The principal facility completed during the consolidated fiscal year was an expansion of the purification facilities for electronic materials at the Chiba Plant.」

    Total capital investment was ¥1,213 million, and the expansion of the purification facilities for electronic information materials at the Chiba Plant was completed. The capital investment plan also included a cogeneration system at the Oppama Plant and an automated high-rise warehouse for hazardous materials at the Chiba Plant, scheduled for completion in 2018.
  17. FY2016First statedAnnual report

    「Regarding capital investment during the consolidated fiscal year, we continued to invest in capacity expansion in growth fields, equipment upgrades at each plant, and research and development-related facilities, with the aim of promoting the development of competitive plants. Total capital investment during the consolidated fiscal year was ¥1,295 million, an increase of ¥33 million from the previous fiscal year.」

    It states the total capital investment for the year and the purposes of investment in growth fields, plant upgrades and research and development facilities.
Moved together

"Develop the business serving the electronic information industries into the largest earnings pillar" moved the same way as this thread, in the same document, in 9 of its 21 moves.

998877★123456
  1. ★This thread
  2. 1Develop the business serving the electronic information industries into the largest earnings pillar9×
  3. 2Delivering Results from Development Themes for High-Performance, High-Value-Added Products9×
  4. 3Turning 東邦化学(上海)有限公司 profitable and putting its business on track8×
  5. 4Productivity Improvements and Cost Reduction Through Review of Manufacturing Methods for Existing Products8×
  6. 5Strategic shareholdings held to facilitate business relationships7×
  7. 6Building an optimal production structure across domestic and overseas production sites7×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Toho Chemical Industry's next results are scheduled for 2026-11-09. Read the earnings preview It last moved in the Management Planning of 2026-06-15: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.