ProgressHeldSoftenedWorseAchievedFY2017-Q3 – FY2017Cited as achievedFY2019-Q2 – FY2020-Q1AdvancedFY20232016: 320162017: 220172018: 120182019: 220192020: 020202021: 020212022: 020222023: 120232024: 020242025: 120252026: 22026
Same theme, other companies
Reducing purchased electricity and CO2 emissions through the introduction of a new biomass boilerA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2026Update to the scheduled completion dateAnnual report

    「New waste boiler construction 12,500 4,073 Internal funds and borrowings 2023.9 2027.9 -」

    The planned completion date for the new waste boiler is disclosed as September 2027 in the capital investment plan. The text also states that completion is scheduled for October 2027, resulting in a discrepancy in the stated completion date.
  2. 2026-05-14AdvancedFinancial results presentation

    「In anticipation of increased in-group consumption following the operation of Boiler No. 13 at the Shimada Mill, the company will pursue stable production increases while maintaining a balance among collection, production and sales volumes.」

    The company presented a plan to achieve stable increases in the collection, production and sales of waste-derived fuel following the start-up of Boiler No. 13 at the Shimada Mill.
  3. FY2025SoftenedAnnual report

    「Toward achieving a low-carbon society, the company will improve the efficiency of energy use and switch from fossil fuels, including through the plan to install a new waste boiler at the Shimada Mill, scheduled for completion in October 2027.」

    The scheduled completion date for the new waste boiler has changed from January 2027 to October 2027.
  4. FY2023AdvancedAnnual report

    「New waste boiler construction 12,500 85 Internal funds and borrowings 2023.9 2027.1 Steam generation volume 70t/h」

    A plan was presented to construct a new waste boiler at the Shimada Mill, with a planned investment of ¥12,500 million, construction beginning in September 2023, completion in January 2027, and steam generation of 70t/h.
  5. FY2020-Q1Cited as achievedAnnual report

    「In the Industrial Materials segment, consolidated subsidiary Shin-Tokai Paper Co., Ltd. is working to further improve its competitiveness in terms of both cost and quality, including through the cost-reduction benefits of its new biomass boiler.」

    The cost-reduction benefits of the new biomass boiler already in operation are cited as an achievement in improving current competitiveness.
  6. FY2019-Q3RestatedAnnual report

    「In the Industrial Materials segment, the new biomass boiler at consolidated subsidiary Shin-Tokai Paper Co., Ltd. has generated cost reductions since commencing operations.」

    The cost-reduction benefits generated by the new biomass boiler already in operation continue to be reported.
  7. FY2019-Q2Cited as achievedAnnual report

    「In the Industrial Materials segment, the new biomass boiler at consolidated subsidiary Shin-Tokai Paper Co., Ltd. has generated cost reductions since commencing operations.」

    The cost-reduction benefits of the new biomass boiler already in operation are reported as a business achievement.
  8. FY2017AchievedAnnual report

    「At consolidated subsidiary Shin-Tokai Paper Co., Ltd. (Shimada Mill), the new biomass boiler began full-scale operations in February 2017.」

    Following completion of construction, the new biomass boiler reached the stage of full-scale operations beginning in February 2017.
  9. FY2017-Q3AchievedAnnual report

    「At consolidated subsidiary Shin-Tokai Paper Co., Ltd. (Shimada Mill), construction of a new biomass boiler was completed in January 2017.」

    Construction of the new biomass boiler at the Shimada Mill was completed in January 2017.
  10. FY2017-Q2RestatedAnnual report

    「At our Shimada Mill, we are constructing a new biomass boiler with completion targeted for January 2017. Operation of the new biomass boiler will increase in-house power generation and help curb energy costs by reducing purchased electricity and fossil fuel consumption.」

    The plan to complete the project in January 2017, continue construction, and reduce purchased electricity and fossil fuel consumption by increasing in-house power generation has been reiterated.
  11. FY2017-Q1RestatedAnnual report

    「In the Industrial Materials segment, our Shimada Mill is constructing a new biomass boiler, with completion targeted for January 2017. Operation of the new biomass boiler will increase in-house power generation and help curb energy costs by reducing purchased electricity and fossil fuel consumption.」

    The plan to complete the project in January 2017, continue construction, and reduce purchased electricity and fossil fuel consumption by increasing in-house power generation has been reiterated.
  12. FY2016First statedAnnual report

    「At the Shimada Mill, construction of a new biomass boiler is under way to reduce purchased electricity and CO2 emissions, with completion and the start of operations targeted for January 2017.」

    The disclosed plan calls for capital investment of ¥7,880 million and maximum power generation of 22,700 kWh.
Moved together

"Strengthening the R&D Organization" moved the same way as this thread, in the same document, in 3 of its 12 moves.

332222★123456
  1. ★This thread
  2. 1Strengthening the R&D Organization3×
  3. 2Suspension of Use of Paper Manufacturing Equipment and Impairment3×
  4. 3Interest-Bearing Debt and Interest-Rate Fluctuations2×
  5. 4Monetization of environmental businesses2×
  6. 5Strengthening Oversight by Outside Directors and Outside Audit & Supervisory Board Members2×
  7. 6Progress in Developing New Products Such as Airas2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Tokushu Tokai Paper yet. It last moved in the Financial results presentation of 2026-05-14: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Reduction in Purchased Electricity and CO2 Emissions through a New Biomass Boiler | Tokushu Tokai Paper Co.,Ltd. (3708) | Komori