Delays in repair work progress due to schedule delays in large carried-over construction projects

First written in FY2019-Q2. 7 of 18 entries say "Materialised", first in FY2019-Q3. Latest entry: FY2026.

18entries
9years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseMaterialisedFY2020 – FY2022-Q1OtherFY2024 – FY20252018: 12019: 320192020: 120202021: 220212022: 420222023: 320232024: 220242025: 120252026: 12026
Same theme, other companies
Revenue decline due to sluggish progress on large projectsA theme 10 companies write about · 10 as a headwind · 0 as a tailwind

S E moved to the "Worse" side of this theme in 2026, 3 years after the typical company in this theme (2023).

The whole theme swung hardest in 2020: 3 of 6 companies on the "Worse" side.

2 other companies' latest entry also says "Materialised".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026MaterialisedAnnual report

    「Consolidated gross profit declined by ¥114 million, although the gross profit margin increased by 0.1 percentage points. The main reasons for the decline were the profit impact of lower revenue and the occurrence of additional costs due to rework in the steel-frame construction field of the building materials manufacturing and sales business.」

    Rework and additional costs in steel-frame construction actually occurred and are cited as factors behind the decline in consolidated gross profit.
  2. FY2025Lower opening orders alongside unapproved increases for additional workAnnual report

    「During the fiscal year, work on projects won during the period progressed steadily, but the volume of projects completed declined as opening orders decreased. In addition, increases for additional work were not approved for some major projects.」

    In the repair and strengthening business, projects won during the period progressed steadily, while the decline in opening orders and the failure to approve increases for additional work became factors behind lower revenue and lower profit.
  3. FY2024Higher costs from construction delays alongside improved profitabilityAnnual report

    「Although profitability improved through selective order-taking, higher costs on projects delayed by work stoppages resulted in operating profit increasing by ¥79 million from the previous fiscal year and by ¥98 million versus the initial forecast.」

    While higher costs remain on projects delayed by the impact of work stoppages, profitability improved through selective order-taking and other measures, resulting in higher profit in the repair and strengthening business.
  4. FY2024-Q3MitigatedAnnual report

    「During the nine months ended the third quarter, revenue increased because construction progress on projects won during the period was steady. The company also worked to secure profit through increases and improved profit margins on projects progressing as scheduled, resulting in higher profit.」

    Construction progressed steadily in the repair and strengthening business, and the impact of delays in the progress of major projects that occurred in the previous fiscal year has recently eased.
  5. FY2024-Q1MaterialisedAnnual report

    「During the three months ended the first quarter, projects under construction required redesign and design revisions, delaying the schedule. However, the company worked to secure profit through increases and improved profit margins on projects progressing as scheduled. As a result, this business reported revenue of ¥441 million, down 29.9% year on year, and operating profit of ¥54 million, down 4.6%.」

    In the repair and strengthening business, redesigns and design revisions caused schedule delays, resulting in a 29.9% year-on-year decline in revenue. Meanwhile, the company sought to secure profit through increases and improved profit margins.
  6. FY2023Recovery in progress alongside higher costsAnnual report

    「During the fiscal year, progress on some major projects recovered and increases for additional work arising in contracted projects were approved. However, higher construction costs, including those attributable to projects delayed by schedule disruptions, resulted in higher revenue but lower profit.」

    While progress on major projects recovered, higher costs on projects delayed by schedule disruptions resulted in higher revenue but lower profit in the repair and strengthening business.
  7. FY2023-Q3MitigatedAnnual report

    「During the cumulative third quarter of the current consolidated fiscal year, net sales and profit increased due to the recovery in the progress of some large projects and approval of increases in the amounts of additional work arising in projects received. As a result, net sales in this business were ¥1,655 million, up 14.5% year on year, and operating income was ¥145 million, up 2.2%.」

    Regarding the delays in the progress of major projects that emerged in the previous quarter, progress on some projects recovered, and the repair and strengthening business reported higher revenue and higher profit.
  8. FY2023-Q2MaterialisedAnnual report

    「In this business, we are advancing repair and strengthening work on bridges and tunnels as measures to address the aging of social infrastructure. With national resilience measures and related initiatives progressing, the order environment remains favorable. During the six months ended the second quarter, the business reported lower revenue and lower profit due to delays in the progress of major projects and higher construction costs. As a result, it reported revenue of ¥1,017 million, down 1.3% year on year, and operating profit of ¥71 million, down 29.5%.」

    In the repair and strengthening business, delays in the progress of major projects and higher construction costs actually occurred, resulting in a 1.3% decline in revenue and a 29.5% decline in operating profit.
  9. FY2023-Q1MitigatedAnnual report

    「During the cumulative first quarter of the current consolidated fiscal year, the opening order backlog was larger than in the previous fiscal year and was worked through steadily. As a result, net sales in this business were ¥629 million, up 53.2% year on year, and operating income was ¥56 million, up 42.6%.」

    The repair and strengthening business made steady progress in working through its order backlog, easing the impact of the delayed progress seen in the previous fiscal year.
  10. FY2022MitigatedAnnual report

    「During the fiscal year, there was little impact from COVID-19 at construction sites, and work progressed as scheduled, resulting in revenue at approximately the same level as the previous year.」

    Repair and strengthening work progressed as scheduled, and no new impact from the delay in working through the order backlog or construction schedule delays seen in the previous fiscal year has been reported.
  11. FY2022-Q3MitigatedAnnual report

    「During the nine months ended the third quarter, there was little impact from COVID-19 at construction sites, and work progressed as scheduled, resulting in revenue at approximately the same level as the previous year.」

    Repair and strengthening work progressed as scheduled, and no new impact from the delay in working through the order backlog or construction schedule delays through the previous quarter has been reported.
  12. FY2022-Q2MitigatedAnnual report

    「In this business, we are advancing repair and strengthening work on bridges and tunnels as measures to address the aging of social infrastructure. With national resilience measures and related initiatives progressing, the order environment remains favorable. During the six months ended the second quarter, profit increased because projects carried over from the previous fiscal year were completed as scheduled.」

    Repair and strengthening projects carried over from the previous fiscal year were completed as scheduled, easing the impact of the delay in working through the order backlog and the construction progress delays seen in the previous quarter.
  13. FY2022-Q1MaterialisedAnnual report

    「During the three months ended the first quarter, personnel were prioritized for major projects carried over from the previous fiscal year, pushing the completion of the opening order backlog into the following quarter and beyond. As a result, this business reported revenue of ¥411 million, down 17.3% year on year, and operating profit of ¥39 million, down 42.2%.」

    In the repair and strengthening business, the completion of the opening order backlog was pushed into the following quarter and beyond, with the impact of delays in construction schedules and progress reflected in a 17.3% decline in revenue and a 42.2% decline in operating profit.
  14. FY2020MaterialisedAnnual report

    「In the repair and strengthening business, construction costs decreased by ¥34 million from the previous fiscal year and by ¥12 million versus the initial forecast, due to higher construction costs resulting from additional personnel assigned to secure the construction period for prime contracts and higher costs, including standby expenses, resulting from work stoppages caused by two heavy-rain disasters.」

    In the repair and strengthening business, work stoppages caused by heavy-rain disasters and additional costs, including standby expenses, were incurred and appeared as a decline in operating profit.
  15. FY2020-Q1MitigatedAnnual report

    「During the three months ended the first quarter, progress on carried-over projects, including projects related to hydroelectric power plants, and revenue from carried-over design projects contributed to higher revenue and higher profit.」

    The company states that, with carried-over construction projects and design projects progressing during the quarter, the impact of the schedule delays on major carried-over projects that had occurred in the previous fiscal year contributed to higher revenue and higher profit in the repair and strengthening business.
  16. FY2019MaterialisedAnnual report

    「During the fiscal year, delays in construction progress occurred due to schedule delays on some major carried-over projects, resulting in lower revenue and lower profit. As a result, this business reported revenue of ¥2,046 million, down 3.4% year on year, and operating profit of ¥235 million, down 8.0%.」

    Schedule delays on major carried-over projects continued through the full year, resulting in a 3.4% decline in revenue and an 8.0% decline in operating profit in the repair and strengthening business.
  17. FY2019-Q3MaterialisedAnnual report

    「During the nine months ended the third quarter, delays in the schedules of some major carried-over projects led to delays in construction progress, resulting in lower revenue and lower profit. As a result, this business reported revenue of ¥1,391 million, down 8.5% year on year, and operating profit of ¥131 million, down 20.6%.」

    In the repair and strengthening business, schedule delays occurred on some major carried-over projects, resulting in an 8.5% year-on-year decline in revenue and a 20.6% decline in operating profit.
  18. FY2019-Q2First statedAnnual report

    「During the six months ended the second quarter, delays occurred in the schedules of some major carried-over projects, resulting in delays in construction progress. As a result, this business reported revenue of ¥806 million, down 6.3% year on year, and operating profit of ¥68 million, up 4.1%.」

    In the repair and strengthening business, schedule delays actually occurred on some major carried-over projects, resulting in revenue for the business declining 6.3% year on year.
Moved together

"Strengthening efforts to address expansion of the repair and reinforcement market" moved the same way as this thread, in the same document, in 7 of its 18 moves.

775554★123456
  1. ★This thread
  2. 1Strengthening efforts to address expansion of the repair and reinforcement market7×
  3. 2Credit, Market, Interest Rate and Liquidity Risks7×
  4. 3New Business Development Overseas5×
  5. 4Sluggish Order Intake and Placement for Private Construction Work and Slower Shipments5×
  6. 5Reducing Interest-Bearing Debt and Improving Cash Efficiency and Financial Soundness5×
  7. 6Expanding Market Share and Enhancing the Competitiveness of Core Products4×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
S E's next results are scheduled for 2026-11-09. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.