Komori
Medius Holdings (3154) · RiskRestated

Impact of Large-Scale Disasters on Product Supply and Business Performance

First written in FY2016. 7 of 11 entries say "Restated". Latest entry: FY2024.

11entries
9years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY2019-Q3WorsenedFY20202016: 12017: 120172018: 220182019: 320192020: 120202021: 020212022: 120222023: 120232024: 12024
Same theme, other companies
Risk of supply stoppages caused by natural disasters and supply chain disruptionsA theme 74 companies write about · 72 as a headwind · 2 as a tailwind

The whole theme swung hardest in 2026: 14 of 31 companies on the "Worse" side.

25 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 74 companies compared. The sentences above are computed from all 74.
Full recordFilings, disclosures and news, newest first
  1. FY2024RestatedAnnual report

    「However, our Group's business covers a wide area, and given the increasing scale of disasters associated with recent climate change, it is difficult to avoid all risks in the event of a disaster.」

    The business impact of the wide geographic distribution of operating sites, the increasing scale of disasters associated with climate change, disruption of logistics, and damage to customers and suppliers continues to be identified as a residual risk.
  2. FY2023MitigatedAnnual report

    「In preparation for disasters, the Company operates an earthquake-isolated logistics center in Kanagawa Prefecture and a large-scale logistics center in Gunma Prefecture with more than 19,000 m² of warehouse space, and is working to expand its backup framework to maintain product supplies.」

    Backup arrangements, including seismically isolated logistics centers and a large-scale logistics center exceeding 19,000㎡, are presented, specifying measures to maintain product supplies. However, the possibility of business impacts from natural disasters exceeding expectations remains.
  3. FY2022RestatedAnnual report

    「However, our Group's business covers a wide area, and given the increasing scale of disasters associated with recent climate change, it is difficult to avoid all risks in the event of a disaster.」

    The business impact of the wide geographic distribution of operating sites, the increasing scale of disasters associated with climate change, disruption of logistics, and damage to customers and suppliers continues to be described.
  4. FY2020WorsenedAnnual report

    「Our Group's business covers a wide area, and given the increasing scale of disasters associated with recent climate change, it is difficult to avoid all risks in the event of a disaster. If a disaster substantially exceeds expectations and products are soiled or damaged due to damage to our Group's head office, operating sites, warehouses or other facilities, if employees are unable to work, if deliveries become difficult because distribution routes are disrupted, or if sales and procurement become difficult because customers, suppliers or others suffer damage, this could disrupt ordinary business operations」

    In addition to the existing risk of damage to operating sites, the potential impact routes are specified, including the increasing scale of disasters due to climate change, disruption of logistics, and damage to customers and suppliers.
  5. FY2019MitigatedAnnual report

    「Our Group has logistics centers in 3 areas, Gunma, Kanagawa and Shizuoka, and the Tokyo metropolitan logistics center and Yokohama Minato logistics center in Kanagawa are housed in seismically isolated buildings. Although we are working to expand our backup arrangements so that product supplies can be maintained even in the event of a major disaster such as an earthquake, disasters substantially exceeding expectations could affect our Group's business performance.」

    Yokohama Minato Logistics Center has been added as a logistics hub with a seismic isolation structure, strengthening the backup arrangements for product supplies, while the risk of disasters exceeding expectations remains.
  6. FY2019-Q3RestatedAnnual report

    「Our Group has logistics centers in 3 areas, Gunma, Kanagawa and Shizuoka, and the Tokyo metropolitan logistics center in Kanagawa is housed in a seismically isolated building. Although we are working to expand our backup arrangements so that product supplies can be maintained even in the event of a major disaster such as an earthquake, disasters substantially exceeding expectations could affect our Group's business performance.」

    The 3-area logistics centers, seismic isolation structure and backup arrangements are described, while the impact on business performance of major disasters exceeding expectations is identified as a residual risk.
  7. FY2019-Q2RestatedAnnual report

    「Our Group has logistics centers in 3 areas, Gunma, Kanagawa and Shizuoka, and the Tokyo metropolitan logistics center in Kanagawa is housed in a seismically isolated building. Although we are working to expand our backup arrangements so that product supplies can be maintained even in the event of a major disaster such as an earthquake, disasters substantially exceeding expectations could affect our Group's business performance.」

    The 3-area logistics centers, seismic isolation structure and backup arrangements are described, while the impact on business performance of major disasters exceeding expectations is identified as a residual risk.
  8. FY2019-Q1RestatedAnnual report

    「Our Group has logistics centers in 3 areas, Gunma, Kanagawa and Shizuoka, and the Tokyo metropolitan logistics center in Kanagawa is housed in a seismically isolated building. Although we are working to expand our backup arrangements so that product supplies can be maintained even in the event of a major disaster such as an earthquake, disasters substantially exceeding expectations could affect our Group's business performance.」

    The 3-area logistics centers, seismic isolation structure and backup arrangements are described, while the impact on business performance of disasters exceeding expectations is identified as a residual risk.
  9. FY2018RestatedAnnual report

    「Our Group has logistics centers in 3 areas, Gunma, Kanagawa and Shizuoka, and the Tokyo metropolitan logistics center in Kanagawa is housed in a seismically isolated building. Although we are working to expand our backup arrangements so that product supplies can be maintained even in the event of a major disaster such as an earthquake, disasters substantially exceeding expectations could affect our Group's business performance.」

    The 3-area logistics centers, seismic isolation structure and backup arrangements, as well as the impact on business performance of disasters exceeding expectations, continue to be described.
  10. FY2017RestatedAnnual report

    「Our Group has logistics centers in 3 areas, Gunma, Kanagawa and Shizuoka, and the Tokyo metropolitan logistics center in Kanagawa is housed in a seismically isolated building. Although we are working to expand our backup arrangements so that product supplies can be maintained even in the event of a major disaster such as an earthquake, disasters substantially exceeding expectations could affect our Group's business performance.」

    The 3-area logistics centers, seismic isolation structure and backup arrangements, as well as the impact on business performance of disasters exceeding expectations, continue to be described.
  11. FY2016First statedAnnual report

    「Our Group has logistics centers in 3 areas, Gunma, Kanagawa and Shizuoka, and the Tokyo metropolitan logistics center in Kanagawa is housed in a seismically isolated building. Although we are working to expand our backup arrangements so that product supplies can be maintained even in the event of a major disaster such as an earthquake, disasters substantially exceeding expectations could affect our Group's business performance.」

    The 3-area logistics centers, seismic isolation structure and backup arrangements are described, while disasters exceeding expectations are identified as a residual risk.
Moved together

"Talent Development Through IT, E-Learning and Position-Specific Training" moved the same way as this thread, in the same document, in 2 of its 11 moves.

222★123
  1. ★This thread
  2. 1Talent Development Through IT, E-Learning and Position-Specific Training2×
  3. 2Strengthening Core Systems Through Mobile Devices and Analytics2×
  4. 3Impact of the spread of COVID-19 on the economy, medical institutions and surgical cases2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Medius Holdings yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Impact of Large-Scale Disasters on Product Supply and Business Performance | MEDIUS HOLDINGS Co.,Ltd. (3154) | Komori