Komori
Informetis (281A) · InitiativeAdvanced

Expanding Business Opportunities Through Next-Generation Smart Meters

First written in FY2024. 8 of 9 entries say "Advanced", first in 2026-03-05. Latest entry: 2026-08-19.

9entries
2years
7from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2024Advanced2026-03-05 – 2026-08-192025: 120252026: 82026
Same theme, other companies
Expansion of Next-Generation Smart Meter Deployment and ApplicationsA theme 2 companies write about · 0 as a headwind · 2 as a tailwind

0 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. 2026-08-19AdvancedFinancial results presentation

    「Specifications for high-resolution electricity measurement finalized」

    The company added that the measurement specifications for next-generation smart meters had been finalized, clarifying the basis for service deployment using those meters.
  2. FY2026-H1AdvancedAnnual report

    「Kansai Transmission and Distribution, Inc. began installing next-generation (second-generation) smart meters on 5 January 2026. Chubu Electric Power Grid Co., Inc. has also announced that it will begin phased installation of next-generation (second-generation) smart meters from January 2026. The deployment phase for next-generation (second-generation) smart meters is therefore beginning in earnest across major areas of Japan. Nationwide full-scale deployment is planned over approximately 10 years from fiscal 2025 onward. These meters are positioned as infrastructure enabling the enhancement of DER (distributed energy resource) control and DR through high-frequency, high-precision electricity data and IoT routes.」

    Installation of next-generation smart meters has begun or is being phased in across the major Kansai and Chubu areas, with nationwide deployment over approximately 10 years from fiscal 2025 onward becoming more concrete.
  3. FY2024First statedAnnual report

    「This will dramatically increase the volume of information that can be obtained from electricity data through next-generation smart meters compared with current smart meters. The value of the information derived from analyzing that data will also expand discontinuously in both scale and scope, making it possible to create new value, such as enabling electricity consumers to enjoy an IoT-enabled lifestyle at lower cost, in addition to optimizing electricity-use efficiency.」

    With deployment from 2026 in view, the Group is advancing applications including compatible measurement methods, anomaly detection, visualization, monitoring and mid-level data. It also refers to the possibility of covering up to 83.17 million meters.
Moved together

"Demand response through BridgeLAB DR" moved the same way as this thread, in the same document, in 6 of its 9 moves.

654433★123456
  1. ★This thread
  2. 1Demand response through BridgeLAB DR6×
  3. 2Securing Business Funding Through Stock Acquisition Rights and Borrowings5×
  4. 3International business expansion, primarily in Europe4×
  5. 4Competitive Advantage Built Around NILM and Power AI Technology4×
  6. 5Strengthening alliances with energy companies and companies in other industries3×
  7. 6International Standardization of NILM Measurement Technology3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Informetis's next results are scheduled for 2026-11-13. Read the earnings preview It last moved in the Financial results presentation of 2026-08-19: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.