First written in FY2025-H1. 8 of 10 entries say "Advanced", first in FY2025. Latest entry: 2026-10-15.

10entries
2years
7from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2025-H1AdvancedFY2025 – 2026-05-01Advanced2026-06-23 – 2026-10-152025: 220252026: 82026
Same theme, other companies
Expansion of the Business Scope into Renewable Energy and Energy-Efficiency ProjectsA theme 10 companies write about · 0 as a headwind · 11 as a tailwind

The whole theme swung hardest in 2021: 2 of 8 companies on the "Worse" side.

3 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. 2026-10-15AdvancedOccurring Fact

    「風力発電所の特別高圧変電所新設工事」

    国内の風力発電事業主向け特別高圧変電所新設工事を受注したことにより、再生可能エネルギー設備工事の具体的な案件化が進んでいる。
  2. 2026-09-28Advancedfinance.yahoo.co.jp

    「In the facilities business, work on extra-high-voltage receiving and distribution equipment for data centers and renewable energy power plants also progressed smoothly, contributing to higher net sales.」

    It was reported that work on extra-high-voltage equipment for renewable energy power plants and data centers progressed and contributed to higher net sales.
  3. FY2025AdvancedAnnual report

    「Large orders for extra-high-voltage substations at renewable energy power plants and data centers, together with steady construction progress, resulted in orders received of ¥5,665 million and revenue of ¥2,272 million.」

    Large orders and construction progress for extra-high-voltage substations serving renewable energy power plants and data centers indicate concrete progress in commercializing decarbonization-related facility construction.
  4. FY2025-H1First statedAnnual report

    「The Group will focus on renewable energy facility construction plans and further strengthen this business as a core business by participating in extra-high-voltage substation construction for solar and wind power facilities, battery storage construction and other projects that can contribute to a decarbonized society.」

    Against the backdrop of 2050 carbon neutrality, the Group is advancing participation in extra-high-voltage substation construction for solar and wind power facilities and battery storage projects, positioning decarbonization-related businesses as core businesses.
Moved together

"Enhancing Corporate Value Through Expanded Orders and Improved Profit Margins" moved the same way as this thread, in the same document, in 3 of its 10 moves.

332222★123456
  1. ★This thread
  2. 1Enhancing Corporate Value Through Expanded Orders and Improved Profit Margins3×
  3. 2Steady Interim Progress in Line with the Medium-Term Management Plan3×
  4. 3Expansion of Transmission Construction Driven by Aging Equipment Renewal and Wide-Area Interconnection Development2×
  5. 4Expansion of the real estate business and synergies with existing businesses2×
  6. 5Future M&A Investment for Business Expansion2×
  7. 6Returning Profits to Shareholders Through Stable Dividends2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for ETS Group yet. It last moved in the Occurring Fact of 2026-10-15: "Advanced".
Strengthening renewable energy facility construction as a core business | ETS Group Co.,Ltd. (253A) | Komori