Reducing Water Consumption at Production Sites
First written in FY2023. 2 of 4 entries say "Achieved", first in FY2025. Latest entry: FY2026.
0 other companies' latest entry also says "Achieved".
- FY2026AchievedAnnual report
「The company set a KPI to reduce water use at production sites by 9% by FY2030 versus FY2013 and has achieved the KPI for 3 consecutive years since FY2023.」
The company achieved its KPI of reducing water use by 9% by FY2030 for 3 consecutive years from FY2023 and reduced water use by approximately 470,000 m³ in FY2025. - FY2025AchievedAnnual report
「The company set a KPI to reduce water use at production sites by 9% by FY2030 versus FY2013 and achieved the KPI ahead of schedule in FY2023. In FY2024, it continued efforts to reduce water use through measures including the installation of an air-compression cooling tower at the Horonobe Plant, improvements to the steam-condensate discharge method at the Ami Plant, the use of recovered boiler water at the Ebina Plant, and modifications to the water supply system at the Ikegami Manufacturing Site, reducing water use by approximately 109,000 m³ per year.」
The company achieved its KPI of reducing water use by 9% by FY2030 ahead of schedule in FY2023 and reduced water use by approximately 109,000 m³ annually in FY2024 through equipment improvements at several plants. - FY2024AdvancedAnnual report
「At the Ebina Plant, a backwash-water recovery system for filtration equipment began operating in May 2023. (Reduction effect: 26,000 m³ per year)」
To achieve the FY2030 target of reducing water use by 9%, the company has installed water recovery systems and other equipment and expects the Ebina Plant alone to reduce water use by 26,000 m³ annually. - FY2023First statedAnnual report
「Water use at production sites: 9% reduction by FY2030 (versus FY2013)」
The company has newly specified a group KPI to reduce water use at production sites by 9% by FY2030 versus FY2013 and is proceeding with the installation of water recovery systems.