Shorter Construction Times, Lower Costs and Higher Quality through the MCB Method
First written in FY2024. 1 of 3 entries say "Restated". Latest entry: 2026-07-15.
No other company in this theme has enough history to compare yet.
- 2026-07-15SoftenedFinancial Results Presentation
「事業規模の関係からモジュール拡販によるコストメリットが得られる段階に無いため、北海道以外においては新規出店を優先」
モジュール拡販について、北海道以外では新規出店を優先し、拡販戦略を見直すとしている。 - FY2025RestatedAnnual report
「With the MCB method, modules are manufactured at a factory during foundation work and then assembled on site. Compared with conventional construction methods, in which everything is assembled from scratch on site, the time required for on-site carpentry work can be reduced by approximately 50% (Note), enabling significant cost reductions through shorter construction times.」
The Group continues to explain that the MCB method addresses the shortage of skilled workers and delivers shorter construction times, lower costs and higher quality through the same mechanism and effects. - FY2024First statedAnnual report
「With the MCB method, modules are manufactured at a factory during foundation work and then assembled on site. Compared with conventional construction methods, in which everything is assembled from scratch on site, the time required for on-site carpentry work can be reduced by approximately 50% (Note), enabling significant cost reductions through shorter construction times.」
The Group aims to address the shortage of skilled workers, shorten construction times, reduce costs and improve quality, which is less affected by weather, by operating the Tomakomai module factory. The period for collecting effect data was June 2023 to May 2024.