Komori
Sanko Metal Industrial (1972) · TargetAdvanced

Improving Labor Productivity

First written in FY2016. 4 of 10 entries say "Advanced", first in FY2023. Latest entry: FY2026.

10entries
11years
1from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2016 – FY2017AdvancedFY2021 – FY20262016: 120162017: 120172018: 120182019: 120192020: 120202021: 120212022: 020222023: 120232024: 120242025: 020252026: 22026
Same theme, other companies
Improving Productivity through Rigorous Construction Process and Cost ManagementA theme 35 companies write about · 0 as a headwind · 36 as a tailwind

19 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 35 companies compared. The sentences above are computed from all 35.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「We will also improve on-site productivity by enhancing construction fixtures and other measures, creating a virtuous cycle through “industry-leading product, sales and construction capabilities,” and leading the industry with overwhelming overall capabilities.」

    Improving on-site productivity through enhancements to construction fixtures is explicitly identified as a means of improving labor productivity.
  2. 2026-06-03AdvancedGeneral Meetings of Shareholders

    「We will also improve on-site productivity by enhancing construction fixtures and other measures, creating a virtuous cycle through “industry-leading product, sales and construction capabilities,” and leading the industry with overwhelming overall capabilities.」

    施工治具の改善を現場生産性向上の具体的手段として記載している。
  3. FY2024AdvancedAnnual report

    「As a new initiative, we introduced a construction manager development program that makes achievement levels visible, with the aim of raising the construction management capabilities of junior construction managers.」

    A development program that makes achievement levels visible was introduced for junior construction managers. The company is also continuing the human capital development PDCA cycle for employees through their third year with the company, including an annual report.
  4. FY2023AdvancedAnnual report

    「We implement a human capital development PDCA cycle for employees through their third year with the company. Based on dialogue with junior employees, their supervisors or instructors prepare a “guidance plan” and a “progress report,” which are submitted once a year to the head of the Human Capital Development Department via the head of the workplace.」

    Specific measures for improving productivity and developing human capital include a human capital development PDCA cycle for employees through their third year with the company, on-the-job training and training by level.
  5. FY2021RaisedAnnual report

    「By undertaking initiatives centered on the “dramatic improvement of productivity” through business process reform and greater differentiation in products and construction through the “renewed strengthening of technical capabilities,” we aim to enhance corporate value over the medium term and expand revenue and earnings」

    The target has been strengthened from improving labor productivity to achieving a “dramatic improvement of productivity” through business process reform, with DX and the integration and use of business infrastructure also cited as means of achieving it.
  6. FY2020ReframedAnnual report

    「③ Human capital development ⑤ Promoting employee development and work-style reform」

    While continuing human capital development, the wording of the most important issue has been broadened to add work-style reform to employee development.
  7. FY2019RestatedAnnual report

    「③ Human capital development ④ Continued employee development」

    The company identifies human capital development as a medium- to long-term strategy and reaffirms continued employee development as its most important issue.
  8. FY2018ReframedAnnual report

    「③ Human capital development」

    “Human capital development” has been identified as a medium- to long-term strategy and the most important issue in place of the previous “improvement of labor productivity.”
  9. FY2017RestatedAnnual report

    「③ Improving labor productivity」

    The company continues to identify improving labor productivity as one of its medium- to long-term strategies and issues to be addressed.
  10. FY2016First statedAnnual report

    「③ Improving labor productivity」

    This is identified as one of the most important issues for securing order volume and improving the earnings structure.
Moved together

"Securing Order Volumes and Improving the Earnings Structure" moved the same way as this thread, in the same document, in 4 of its 10 moves.

443333★123456
  1. ★This thread
  2. 1Securing Order Volumes and Improving the Earnings Structure4×
  3. 2Capital investment aimed at new product development, labor saving and quality improvement4×
  4. 3Expanding Sales of Strategic Products and Solar Power Generation Roof, Renovation and Painting Work3×
  5. 4Passing Higher Steel Prices Through to Order Unit Prices and Addressing Procurement and Production Processes3×
  6. 5Further Strengthening Technical Capabilities3×
  7. 6Roof and Wall Product and Construction Method Development Leveraging Technology and Materials3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Sanko Metal Industrial's next results are scheduled for 2026-10-30. Read the earnings preview It last moved in the General Meetings of Shareholders of 2026-06-03: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.