Taihei Dengyo (1968) · InitiativeAdvancedLatest Earnings (2026-08-06): "Cited as achieved"

Addressing high-efficiency thermal power, biomass and nuclear safety improvement projects

First written in FY2016. 13 of 24 entries say "Advanced", first in FY2017-Q2. Latest entry: 2026-08-06.

24entries
11years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2019 – FY2023AdvancedFY2024 – FY20252016: 320162017: 420172018: 320182019: 320192020: 120202021: 120212022: 020222023: 320232024: 120242025: 220252026: 32026
Same theme, other companies
Comprehensive Strengthening of the Power Generation Equipment, Services and New Energy BusinessesA theme 6 companies write about · 0 as a headwind · 6 as a tailwind

0 other companies' latest entry also says "Cited as achieved".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. 2026-08-06Cited as achievedEarnings

    「Net sales increased across the division, due to increases in nuclear power generation equipment construction and environmental protection equipment construction, reaching ¥10,629 million, up 16.5% year on year and accounting for 29.0% of total net sales. Segment profit was ¥681 million, up 119.4%.」

    The disclosure cites increased sales from nuclear power generation equipment construction and environmental protection equipment construction. Meanwhile, orders received in the Construction division declined 45.7% year on year due to a decrease in nuclear power generation equipment construction.
  2. FY2026AdvancedAnnual report

    「Orders received increased across the segment due to increases in orders for nuclear power generation facility construction and environmental protection facility construction, reaching ¥89,865 million, up 65.7% year on year and accounting for 45.6% of the total.」

    In the power generation facility-related business, increased orders for nuclear power generation facility construction and environmental protection facility construction resulted in a 65.7% year-on-year increase in orders received in the construction business segment.
  3. 2026-06-04RestatedGeneral Meetings of Shareholders

    「We will focus on expanding orders for construction related to the restart of nuclear power plants and for the construction of new and replacement LNG-fired power plants,」

    Construction related to nuclear power plant restarts and new and replacement LNG-fired power plants is reiterated as a priority area throughout the plan period.
  4. FY2026-H1RestatedAnnual report

    「Construction of nuclear power plant restart-related projects, and winning orders for new-build and replacement construction of LNG-fired power plants, for which demand for construction is expected to rise significantly through the long-term decarbonized power source auction」

    In addition to nuclear power plant restart-related projects, the Company continues to pursue new-build and replacement construction of LNG-fired power plants as part of its power generation facility-related service offerings.
  5. FY2025AdvancedAnnual report

    「In the next consolidated fiscal year, we will work to enhance corporate value and achieve sustainable growth by continuing safety measure construction at nuclear power plants, securing personnel for the construction of large-scale thermal power plants, strengthening the organizational structure of our overseas bases, and further promoting the Green Project, which packages forestry and agriculture into a single initiative centered on our own biomass power plant.」

    For initiatives related to power generation facilities, the Company has specified the continuation of nuclear safety measures, securing personnel for large-scale thermal power plant construction, strengthening overseas bases, and promoting the Green Project as measures for the next fiscal year.
  6. FY2024AdvancedAnnual report

    「Expansion of service areas through orders for nuclear power plant restart-related construction」

    The Company states that it won orders for nuclear power plant restart-related construction and expanded its service areas.
  7. FY2024-Q2Increase in nuclear power construction orders; decrease in environmental protection facility construction ordersAnnual report

    「Orders received decreased across the segment due to a decline in orders for environmental protection facility construction, despite an increase in orders for nuclear power generation facility construction, to ¥20,066 million, down 2.7% year on year and accounting for 31.2% of the total.」

    In the construction business segment, orders for nuclear power generation facility construction increased, while orders for environmental protection facility construction decreased, resulting in a 2.7% year-on-year decline in segment orders received.
  8. FY2024-Q1Increase in nuclear power construction orders; decrease in thermal power and environmental facility construction ordersAnnual report

    「Orders received decreased across the segment due to a decline in orders for utility thermal power generation facility construction and environmental protection facility construction, despite an increase in orders for nuclear power generation facility construction, to ¥7,033 million, down 11.4% year on year and accounting for 27.4% of the total.」

    In the construction business segment, orders for nuclear power generation facility construction increased, while orders for utility thermal power generation facility construction and environmental protection facility construction decreased, resulting in a 11.4% year-on-year decline in total segment orders received.
  9. FY2023AdvancedAnnual report

    「Orders received increased across the segment due to increases in orders for nuclear power generation facility construction and environmental protection facility construction, reaching ¥58,200 million, up 32.6% year on year and accounting for 42.3% of the total.」

    The increase in orders for nuclear power generation facility construction and environmental protection facility construction led to orders received of ¥58,200 million in the construction business segment, up 32.6% year on year.
  10. FY2021AdvancedAnnual report

    「During the current consolidated fiscal year, we invested a total of ¥1,657 million in updating, developing, and improving machinery and tools to increase construction efficiency and safety, and in improving the facilities at the biomass power plant. The main investment was in facility improvements at the Nishikaze Shinto Biomass Power Plant (Hiroshima, Hiroshima Prefecture).」

    The Company improved the facilities at its own biomass power plant and disclosed this as the main investment within total capital expenditures of ¥1,657 million for the full year.
  11. FY2020-Q3AdvancedAnnual report

    「The Nishikaze Shinto Biomass Power Plant, which was under planning at the end of the previous consolidated fiscal year, was completed in October 2019 and commenced commercial operations.」

    The Nishikaze Shinto Biomass Power Plant completed construction and commenced commercial operations in October 2019, progressing from the construction and completion stages to the operating stage.
  12. FY2020-Q2AdvancedAnnual report

    「At the Nishikaze Shinto Biomass Power Plant, which was completed in October this year, we will contribute to the local community by helping realize a low-carbon society through renewable energy, an energy source for the next generation, while deepening our knowledge of next-generation power generation technologies and the electricity sales business and working to enhance corporate value.」

    Regarding initiatives involving high-efficiency thermal power and biomass, the Company states that the Nishikaze Shinto Biomass Power Plant was completed in October this year and progressed to the next stage involving renewable energy, power generation technology, and the electricity sales business.
  13. FY2019AdvancedAnnual report

    「In addition, construction of the Nishikaze Shinto Biomass Power Plant (Hiroshima, Hiroshima Prefecture), which began in earnest last April, is scheduled for completion in the current fiscal year. By owning the power plant, we aim to deepen our knowledge of the O&M and electricity sales businesses while contributing to the development and revitalization of the local community.」

    The Nishikaze Shinto Biomass Power Plant progressed from the full-scale commencement of construction to the stage of planned completion in the current fiscal year, with the acquisition of knowledge of the O&M and electricity sales businesses through ownership by the Company positioned as an objective.
  14. FY2019-Q3RestatedAnnual report

    「In addition, we regard nuclear power generation as an important baseload power source for the future and are working to comply with the new regulatory standards, including safety measures, in preparation for the restart of nuclear power plants.」

    Nuclear power generation is positioned as an important baseload power source for the future, and efforts to implement safety measures and comply with the new regulatory standards are continuing.
  15. FY2019-Q2AdvancedAnnual report

    「In addition, full-scale construction work began on the Nishikaze Shinto Biomass Power Plant (Hiroshima, Hiroshima Prefecture), which will be the first power plant owned by the Company, and the entire Company is working toward commencing operations in November next year.」

    For the biomass power plant owned by the Company, construction progressed to the stage of full-scale commencement, and the target of commencing operations in November of the following year remains unchanged.
  16. FY2018AdvancedAnnual report

    「In addition, construction of the Nishikaze Shinto Biomass Power Plant (Hiroshima, Hiroshima Prefecture), which will be the first power plant owned by the Company, began in April this year. We will aim to commence operations in November next year while contributing to regional development and giving consideration to safety and the environment.」

    The initiative involving the Company's own power plant and biomass power generation progressed from preparing an ownership plan to commencing construction. A target of commencing operations in November 2019 was also stated.
  17. FY2018-Q3RestatedAnnual report

    「We also worked to win orders for thermal power generation facility construction, prepare for the O&M business, prepare plans to own the Nishikaze Shinto Biomass Power Plant (Hiroshima, Hiroshima Prefecture), and fully launch operations at our own factory following improvements in its production capacity.」

    The initiatives concerning thermal power generation facility construction, the O&M business, the Nishikaze Shinto Biomass Power Plant, and the Company's own factory are described as being at the same stage of progress as in the previous quarter.
  18. FY2018-Q2AdvancedAnnual report

    「We also worked to win orders for thermal power generation facility construction, prepare for the O&M business, prepare plans to own the Nishikaze Shinto Biomass Power Plant (Hiroshima, Hiroshima Prefecture), and fully launch operations at our own factory following improvements in its production capacity.」

    The Company describes specific progress in its power generation facility-related business, including orders for thermal power generation facility construction, preparations for the O&M business, and preparations for plans to own the Nishikaze Shinto Biomass Power Plant.
  19. FY2018-Q1RestatedAnnual report

    「In addition, we began expanding our overseas construction business and O&M business, acquiring methods and technologies for nuclear power plant decommissioning, and preparing plans to own power plants,」

    The expansion of the O&M business and acquisition of methods and technologies for nuclear power plant decommissioning are reiterated as measures for developing the existing power generation facility-related business.
  20. FY2017AdvancedAnnual report

    「Against this business backdrop, with the aim of increasing the added value provided by the Group as a construction company, we worked to develop our O&M business, actively pursue orders under long-term maintenance contracts, shorten construction periods and improve safety through better construction methods, and establish overseas subsidiaries as part of the continuing development of our overseas business base. We also undertook construction of new high-efficiency thermal power plants and renewable energy (biomass) power plants, removal and dismantling of existing power generation facilities, nuclear power plant safety measure projects, and decommissioning projects.」

    The Company states that, in addition to its existing high-efficiency thermal power, biomass, and nuclear safety measure projects, it also undertook removal and dismantling of existing facilities and nuclear power plant decommissioning projects.
  21. FY2017-Q3RestatedAnnual report

    「The Group will continue working to win projects involving high-efficiency thermal power generation facilities planned for future construction, including IGCC (integrated coal gasification combined cycle) and MACC/GTCC (advanced gas turbine combined cycle), as well as renewable energy (biomass power generation), while closely monitoring trends in the electric power industry, including new power producers.」

    The policy of winning high-efficiency thermal power and biomass projects is reiterated, with facility types such as IGCC and MACC/GTCC specified.
  22. FY2017-Q2AdvancedAnnual report

    「Against this business backdrop, with the aim of achieving further sustainable corporate growth, the Group has undertaken the construction of new high-efficiency thermal power plants and renewable energy (biomass) power plants, thermal power plant removal projects, and nuclear power plant safety measure projects. By completing this work reliably, the Group is building relationships of trust with customers,」

    The Company states that it has actually undertaken high-efficiency thermal power, biomass, thermal power plant removal, and nuclear safety measure projects, moving from listing order opportunities to describing projects actually completed.
  23. FY2017-Q1RestatedAnnual report

    「In the current consolidated fiscal year, new construction of high-efficiency thermal power plants aimed at reducing greenhouse gas emissions, new construction of renewable energy (biomass) power plants, and safety measures construction at nuclear power plants are scheduled to proceed in sequence.」

    The Company continues to list high-efficiency thermal power, biomass, and nuclear safety measure projects as planned projects for the current fiscal year.
  24. FY2016First statedAnnual report

    「In the next consolidated fiscal year, new construction of high-efficiency thermal power plants aimed at reducing greenhouse gas emissions, new construction of renewable energy (biomass) power plants, and safety measures construction at nuclear power plants are scheduled to proceed in sequence.」

    The company identifies high-efficiency thermal power and biomass related to greenhouse gas emissions reductions, as well as nuclear power safety measures, as order opportunities.
Moved together

"Strengthening production capacity, alliances and specialist organizations to support an integrated operating structure" moved the same way as this thread, in the same document, in 10 of its 24 moves.

1087666★123456
  1. ★This thread
  2. 1Strengthening production capacity, alliances and specialist organizations to support an integrated operating structure10×
  3. 2Research and Development of Technologies to Improve Construction Efficiency and Safety and Expand into New Fields8×
  4. 3Long-Term, Stable and Sustained Shareholder Returns7×
  5. 4Promotion of Overseas Business Centered on Myanmar and Indonesia6×
  6. 5Performance-Linked Share Compensation Plan for Directors (BIP Trust)6×
  7. 6Initiating a plan to own in-house power plants6×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Taihei Dengyo yet. It last moved in the Earnings of 2026-08-06: "Cited as achieved".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Addressing high-efficiency thermal power, biomass and nuclear safety improvement projects | TAIHEI DENGYO KAISHA,LTD. (1968) | Komori