Full-scale entry into the offshore wind power generation sector
First written in FY2019-Q3. 4 of 7 entries say "Advanced", first in FY2020. Latest entry: 2026-08-07.
0 other companies' latest entry also says "Mitigated".
- 2026-08-07MitigatedEarnings presentation
「中東情勢悪化によって、一部原材料(ナフサ由来材料)の供給懸念があったが徐々に解消へ。」
中東情勢に起因する一部原材料の供給懸念について、徐々に解消しているとの説明に変化した。 - FY2026AdvancedAnnual report
「We have begun efforts to build a supply chain for floating structures and will work to expand orders by continuously strengthening our technological capabilities and competitiveness, using optimization and strong management of the overall project as our advantages.」
In offshore wind, the scope of activities has expanded beyond early-stage business feasibility studies and basic design to include the development of a supply chain for floating structures. - 2026-05-14WorsenedEarnings presentation
「EPC projects under execution: impacts from rising prices and longer lead times for materials and equipment, and higher transportation costs」
遂行中EPC案件について、資機材価格、納期、輸送費に関する影響要因を具体的に示した。 - FY2023AdvancedAnnual report
「The company recently established an optimal design technology for power cables.」
In the offshore wind power generation sector, optimal design technology for power cables has been established. - FY2022AdvancedAnnual report
「The group also aims to become a leading EPC player, seeking future EPC orders and execution while becoming involved from the early stages, including business feasibility studies and basic design.」
In offshore wind, the scope of activities and organizational framework for participation from the early business feasibility study and basic design stages, with the aim of becoming a leading EPC player, have taken concrete shape. - FY2020AdvancedAnnual report
「To enter the numerous offshore wind power generation construction projects planned in Japan and overseas, the Wind Power Project Division of JGC Corporation, which is responsible for the domestic EPC business, has established a system capable of handling the entire process, from developing new opportunities and preparing estimates through project execution, and is working to win orders for new projects.」
In the offshore wind sector, an operating division structure has been established to handle the entire process from business development through estimation and execution. - FY2019-Q3First statedAnnual report
「In addition, the Wind Power Project Office was newly established in November of the same year to support full-scale entry into the offshore wind power generation sector, where market expansion is expected, among other initiatives.」
A specialized organization was established in November 2018 to support full-scale entry into the offshore wind power generation sector, where market expansion is expected.