Komori
Daiwa House Industry (1925) · InitiativeAdvancedLatest Results (2026-11-11): "Achieved"

Renewable Energy Expansion in Solar and Hydroelectric Power Generation

First written in FY2016. 15 of 20 entries say "Advanced", first in FY2018. Latest entry: 2026-11-11.

20entries
11years
3from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2016AdvancedFY2018 – FY2020RestatedFY2021-Q2AdvancedFY2022 – FY20262016: 120162017: 020172018: 120182019: 020192020: 320202021: 020212022: 320222023: 420232024: 220242025: 220252026: 42026
Same theme, other companies
Expanding the Solar, Wind and Biomass Power PortfolioA theme 33 companies write about · 0 as a headwind · 40 as a tailwind

The whole theme swung hardest in 2025: 2 of 20 companies on the "Worse" side.

0 other companies' latest entry also says "Achieved".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 33 companies compared. The sentences above are computed from all 33.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「In the IPP business, we operate 825 power generation facilities nationwide, including solar, wind and hydropower plants, with generating capacity of 1,046MW (as of the end of March 2026).」

    Renewable energy generation facilities expanded from 758 and 959MW to 825 and 1,046MW. Construction of the grid-scale battery storage facility at the Kyushu plant was completed, with operations scheduled to begin in August 2026.
  2. 2026-05-13AdvancedResults

    「In the IPP business, we operate 825 power generation facilities nationwide, including solar, wind and hydropower plants, with generating capacity of 1,046MW (as of the end of March 2026).」

    再生可能エネルギー発電所の運営数と発電出力が、前回開示の758ヶ所・959MWから増加した。
  3. FY2026-H1AdvancedAnnual report

    「In the IPP business, we operate 758 power generation facilities nationwide, primarily solar power plants as well as wind and hydropower plants, with generating capacity of 959MW (as of 30 September 2025). We are also preparing a demonstration project for a grid-scale battery storage facility at our Kyushu plant, with operations scheduled to begin in July 2026, as we seek to enter the battery storage business.」

    Expanded the number of renewable energy generation facilities operated nationwide to 758, with generating capacity of 959MW, and announced plans to enter a demonstration project for a grid-scale battery storage facility. Construction also began in Thailand on the Company’s first overseas on-site PPA project.
  4. FY2025AdvancedAnnual report

    「In the IPP business, we operate 677 power generation facilities nationwide, primarily solar power plants as well as wind and hydropower plants, with generating capacity of 894MW.」

    Expanded the number of renewable energy generation facilities operated nationwide to 677, with generating capacity of 894MW. Also launched the battery storage business and the first overseas on-site PPA in Thailand.
  5. FY2025-H1AdvancedAnnual report

    「In the EPC business, we worked to expand two PPA businesses: off-site PPAs, which supply electricity to customers located away from solar power plants, and on-site PPAs, which supply electricity directly from solar power plants installed on rooftops or adjacent land. Demand for renewable energy is steadily increasing. We will continue to focus on this area as a key business by securing sites for solar power plants using our land development expertise accumulated since our founding and developing customers in collaboration with major energy companies. In the IPP business, we operate 600 power generation facilities nationwide, primarily solar power plants as well as wind and hydropower plants.」

    Advanced on-site and off-site PPAs, site acquisition and collaboration with major energy companies, bringing the number of renewable energy generation facilities operated nationwide to 600.
  6. FY2024-Q3AdvancedAnnual report

    「In the EPC business, we worked to expand two PPA businesses as part of our post-FIT initiatives: off-site PPAs, which supply electricity to customers located away from solar power plants, and on-site PPAs, which supply electricity directly from solar power plants installed on rooftops or adjacent land. Demand for renewable energy is steadily increasing. We will develop large-scale solar power plants by leveraging the land development expertise accumulated since our founding, and will continue to focus on this area as a key business going forward. In the IPP business, we operate 528 power generation facilities nationwide, primarily solar power plants as well as wind and hydropower plants.」

    Expanded on-site and off-site PPAs and positioned large-scale solar power plants as a key business going forward. The number of IPP power generation facilities operated reached 528 nationwide.
  7. FY2024-Q2AdvancedAnnual report

    「In September 2023, “DREAM Solar Ishikawa Hakui Horikake-Shinmachi,” a ground-mounted solar power plant for the Company’s first off-site PPA, began operations. Demand for renewable energy is steadily increasing. Based on land information accumulated nationwide since the Company’s founding, we will develop large-scale solar power plants and make them a key business going forward.」

    In the renewable energy business, the Company’s first ground-mounted solar power plant for an off-site PPA began operations in September 2023. The number of IPP power generation facilities operated also reached 498 nationwide.
  8. FY2024-Q1AdvancedAnnual report

    「In the IPP business, we operate 487 power generation facilities nationwide, primarily solar power plants as well as wind and hydropower plants. Going forward, as part of the three management policies under the Seventh Medium-Term Management Plan, we will take a central role in the initiative to “install solar power generation systems on the roofs of, in principle, all newly constructed buildings,” promoting it across the Group to further expand the adoption of renewable energy.」

    The number of solar, wind and hydropower plants operated increased from 480 to 487, and the Group continues to promote the principle of installing solar power systems on the roofs of all newly constructed buildings.
  9. FY2023AdvancedAnnual report

    「In the IPP business, we operate 480 power generation facilities nationwide, primarily solar power plants as well as wind and hydropower plants. Going forward, as part of the three management policies under the Seventh Medium-Term Management Plan, the Group will continue promoting the initiative to “install solar power generation systems on the roofs of, in principle, all newly constructed buildings,” with the aim of further expanding its renewable energy generation business.」

    The number of renewable energy generation facilities operated increased to 480 nationwide. The Company also plans to acquire the Hibikinada Thermal Power Plant and convert it to dedicated biomass firing in April 2026.
  10. FY2023-Q3AdvancedAnnual report

    「In the EPC business, as part of its post-FIT initiatives, we are focusing on expanding two PPA businesses, with projects increasing: on-site PPAs, which supply electricity directly from solar power plants installed on rooftops or adjacent land, and off-site PPAs, which supply electricity to customers located away from the solar power plant.」

    Reported an increase in on-site and off-site PPA projects as a post-FIT initiative, while the number of power generation facilities operated in the IPP business increased from 454 to 462 nationwide.
  11. FY2023-Q2AdvancedAnnual report

    「In the EPC business, although the number of projects is declining as FIT rates for solar power generation fall, projects for post-FIT initiatives are increasing, including on-site PPA solar power generation systems that supply electricity directly from solar power plants installed on rooftops or adjacent land, and off-site PPAs that supply electricity to customers located away from the solar power plant. In the IPP business, we operate 454 power generation facilities nationwide, primarily solar power plants as well as wind and hydropower plants. Going forward, as part of the three management policies under the Seventh Medium-Term Management Plan, the Group will launch the initiative to “install solar power generation systems on the roofs of, in principle, all newly constructed buildings,” with the aim of further expanding its renewable energy generation business.」

    On-site and off-site PPA projects increased in the renewable energy business, bringing the number of solar, wind and hydropower plants operated nationwide to 454. The Group also began implementing a policy of installing solar power systems, in principle, on the roofs of all newly constructed buildings.
  12. FY2023-Q1AdvancedAnnual report

    「In the IPP business, we operate 443 power generation facilities nationwide, primarily solar power plants as well as wind and hydropower plants. Going forward, as part of the three management policies under the Seventh Medium-Term Management Plan, the Group will begin implementing the initiative to “install solar power generation systems on the roofs of, in principle, all newly constructed buildings,” with the aim of further expanding its renewable energy generation business.」

    Operates solar, wind and hydropower plants at 443 locations nationwide and has begun implementing a Group-wide policy of installing solar power generation systems, in principle, on the roofs of all newly constructed buildings.
  13. FY2022AchievedAnnual report

    「In 2021, “Funabashi Grand Oasis,” a town powered entirely by renewable energy, from construction through the electricity used in residents’ daily lives, was completed.」

    Funabashi Grand Oasis, a town powered by 100% electricity generated from renewable energy sources, was completed across all stages from construction through residents’ daily lives.
  14. FY2021-Q2RestatedAnnual report

    「In Chiba Prefecture, sales of Premist Funabashi Tsukada, a large-scale mixed-use development designed as a 100% renewable-energy town using only electricity generated from renewable energy sources from construction through residents’ daily lives, progressed well and contributed to revenue.」

    Sales of Premist Funabashi Tsukada, which uses 100% electricity generated from renewable energy sources, progressed well and contributed to revenue.
  15. FY2020AdvancedAnnual report

    「At a mixed-use development on the former site of the AGC Technoglass Nakayama plant in Funabashi, Chiba Prefecture, we began the “Funabashi Tsukada Project,” a town development that supplies 100% substantially renewable electricity, from construction through residents’ daily lives, for the first time in Japan (Note 1).」

    In addition to generating and selling renewable energy, began a mixed-use development supplying 100% substantially renewable electricity from construction through occupancy.
  16. FY2020-Q3AdvancedAnnual report

    「In Japan, we began sales of Premist Funabashi Tsukada (Chiba Prefecture), a large-scale mixed-use development project designed as a 100% renewable-energy town using only electricity generated from renewable energy sources.」

    In addition to renewable energy generation and demonstration projects, advanced to the sales stage a large-scale mixed-use development powered entirely by electricity from renewable energy sources.
  17. FY2018AdvancedAnnual report

    「We began a demonstration project at Daiwa House Saga Building for an office that is self-sufficient in electricity generated from renewable energy. The building was selected by the Agency for Natural Resources and Energy of the Ministry of Economy, Trade and Industry for the FY2017 Net Zero Energy Building Demonstration Project. By introducing environmentally friendly technologies, including solar power generation (83.2kW), lithium-ion storage batteries (75kWh), and an air-conditioning system using well water and solar heat, it achieved a ZEB (net zero energy building) capable of operating independently without relying on electricity purchased from a utility company.」

    Began a demonstration project for a self-sufficient ZEB equipped with 83.2kW of solar power generation and 75kWh of storage batteries, among other features.
  18. FY2016First statedAnnual report

    「During the period, operations began at 30 new locations, bringing the number of operating solar power plants nationwide to 116. We also began construction of a hydropower plant in Hida City, Gifu Prefecture, as a new renewable energy source development project, with operations scheduled to begin in November 2017.」

    In addition to expanding its solar power plants, the Company has begun construction of a hydropower plant.
Moved together

"Comprehensive Proposals for Corporate Logistics, Medical and Nursing Care Facilities" moved the same way as this thread, in the same document, in 17 of its 20 moves.

171514121212★123456
  1. ★This thread
  2. 1Comprehensive Proposals for Corporate Logistics, Medical and Nursing Care Facilities17×
  3. 2Overseas Business Expansion Centered on China15×
  4. 3Growth Investments to Enhance Corporate Value14×
  5. 4Expansion of Rental Housing Sales Bases and Strengthening of the Product Lineup12×
  6. 5Nationwide Expansion of Urban Hotels12×
  7. 6Development of High-Value-Added, Rebuilding and Regional Core City Condominiums12×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Daiwa House Industry's next results are scheduled for 2026-11-11. Read the earnings preview It last moved in the Results of 2026-11-11: "Achieved".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.