Bodily injury and property damage accidents and disasters during construction

First written in FY2020. 2 of 5 entries say "Materialised", first in FY2022-Q3. Latest entry: FY2026.

5entries
7years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2020MaterialisedFY2022-Q3 – FY2022RestatedFY2024 – FY20262020: 120202021: 020212022: 220222023: 020232024: 120242025: 020252026: 12026
Same theme, other companies
Cost burden risk arising from serious construction accidents and contractual non-conformityA theme 17 companies write about · 18 as a headwind · 0 as a tailwind

The whole theme swung hardest in 2026: 1 of 7 companies on the "Worse" side.

12 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 17 companies compared. The sentences above are computed from all 17.
Full recordFilings, disclosures and news, newest first
  1. FY2026RestatedAnnual report

    「The Group's performance may be affected by unexpected costs arising from personal or property accidents or disasters during construction, or remedial work after handover.」

    It continues to disclose the risk of unexpected costs arising from accidents and disasters during construction and remedial work after handover.
  2. FY2024RestatedAnnual report

    「The Group's performance may be affected by unexpected costs arising from personal or property accidents or disasters during construction, or remedial work after handover.」

    It continues to disclose the risk of unexpected costs arising from accidents and disasters during construction and remedial work after handover.
  3. FY2022MaterialisedAnnual report

    「Meanwhile, at the US subsidiary, construction of ground-improvement works at an LNG terminal was postponed due in part to the impact of carbon-neutral policies. Some projects were also significantly delayed in starting construction because of ecological and environmental issues involving protected plants.」

    At the US subsidiary, construction postponements and significant delays in starting work resulted from policy and ecological and environmental issues, and construction-related risks materialized as lower-than-expected completed construction revenue.
  4. FY2022-Q3MaterialisedAnnual report

    「Meanwhile, at the U.S. subsidiary, construction profitability deteriorated because of work stoppages caused by natural disasters and the novel coronavirus disease, but the company reduced indirect expenses and yard costs and reviewed its staffing, maintaining its initial operating profit plan.」

    It states that construction was suspended due to natural disasters and COVID-19, worsening construction profitability.
  5. FY2020First statedAnnual report

    「The Group's performance may be affected by unexpected costs arising from personal or property accidents or disasters during construction, or remedial work after handover.」

    It separately identifies, for the first time, unexpected costs arising from accidents involving people or property and disasters during construction, as well as remedial work after handover, as general construction risks.
Moved together

"Intensifying competition for orders and rising material and labor costs" moved the same way as this thread, in the same document, in 2 of its 5 moves.

22222★12345
  1. ★This thread
  2. 1Intensifying competition for orders and rising material and labor costs2×
  3. 2Increase in the Equity Ratio2×
  4. 3Unprofitable construction projects and unexpected additional costs2×
  5. 4Delays and Cost Increases Due to Changes in Construction Methods and Unexpected Geological Conditions on a U.S. Construction Project2×
  6. 5Construction Industry Remains Firm, Supported by Domestic Construction Investment2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Japan Foundation Engineering yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Bodily injury and property damage accidents and disasters during construction | JAPAN FOUNDATION ENGINEERING CO.,LTD. (1914) | Komori