Credit and Loss Risks from Defective Ground-Improvement Works and Falsified Data

First written in FY2016. 9 of 19 entries say "Mitigated", first in FY2019. Latest entry: FY2022.

19entries
7years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2018-Q1 – FY2019-Q2MitigatedFY2019 – FY2022-Q12016: 320162017: 420172018: 220182019: 220192020: 320202021: 420212022: 12022
Same theme, other companies
Defective Workmanship and Data Falsification in Ground Improvement WorksA theme 5 companies write about · 5 as a headwind · 0 as a tailwind

Toa moved to the "Worse" side of this theme in 2016.

0 other companies' latest entry also says "Mitigated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2022MitigatedAnnual report

    「また、地盤改良工事における施工不良等の瑕疵修補に係る工事は完成したものの、再発防止に向けて社員のコンプライアンス意識向上に常に取り組み、誠実な企業風土を醸成していくことで」

    瑕疵修補工事が完成し、施工不良関連損失引当金も192百万円からゼロとなったため、施工不良に伴う修補・財務上のリスクはさらに低減している。
  2. FY2022-Q2RestatedAnnual report

    「施工不良関連損失引当金 192 -」

    施工不良関連損失引当金は前連結会計年度末の192百万円から当第2四半期末にはゼロとなっており、前四半期までに進んだ財務上のリスク低減状態を確認している。
  3. FY2022-Q1MitigatedAnnual report

    「施工不良関連損失引当金 192 -」

    施工不良関連損失引当金が前連結会計年度末の192百万円から当第1四半期末にはゼロとなり、関連する財務上の備えが解消された。
  4. FY2021MitigatedAnnual report

    「また、地盤改良工事における施工不良等の瑕疵修補に係る工事は完成したものの、再発防止に向けて社員のコンプライアンス意識向上に常に取り組み、誠実な企業風土を醸成していくことで」

    瑕疵修補工事が完成し、施工不良関連損失引当金も1,500百万円から192百万円へ減少した。問題に伴う残存リスクはあるが、修補・財務上の備えはいずれも縮小している。
  5. FY2021-Q3MitigatedAnnual report

    「地盤改良工事における施工不良等の瑕疵修補に関しては、すべての工事で施工が完了し、引き渡しを行いました。一部の空港では、施工後のモニタリングを実施しており、供用に障害が無いことが確認されております。」

    瑕疵修補に係る全工事の施工・引き渡しが完了し、一部空港では供用に障害がないことも確認されており、施工不良に関する残存リスクがさらに低減している。
  6. FY2021-Q2MitigatedAnnual report

    「施工不良関連損失引当金 1,500 842」

    施工不良関連損失引当金は前連結会計年度末の1,500百万円から842百万円へ減少しており、関連損失リスクへの財務上の備えは縮小している。施工不良問題自体への対応は継続している。
  7. FY2021-Q1MitigatedAnnual report

    「地盤改良工事における施工不良等の瑕疵修補に係る工事は着実に進捗しており、当工事を一日も早く完遂させ、施工者としての責任を全うすることに全力を注ぐ」

    瑕疵修補工事が着実に進捗しているとされ、施工不良に関する残存リスクへの対応が進んでいる。
  8. FY2020-Q3MitigatedAnnual report

    「地盤改良工事における施工不良等に関しましては、福岡空港以外の修補工事は完了いたしました。福岡空港修補工事につきましても早期かつ確実な完成に向け、総力を挙げ対応しております。」

    福岡空港以外の修補工事が完了し、残る福岡空港工事も完成に向けて対応中であるため、施工不良に関する修補・損失リスクは低減している。
  9. FY2020-Q2MitigatedAnnual report

    「施工不良関連損失引当金 4,741 2,738」

    施工不良関連損失引当金は前連結会計年度末の4,741百万円から2,738百万円へ減少した。施工不良問題に伴う損失リスクは残るが、引当金残高は減少している。
  10. FY2019MitigatedAnnual report

    「With regard to defective construction and other issues in ground-improvement works, we will devote every effort to completing the remedial works ordered by the Company’s customers steadily and as soon as possible, thereby fulfilling our responsibility as the contractor.」

    瑕疵修補工事の完遂に取り組む方針が示され、施工不良関連損失引当金も前期10,776百万円から4,741百万円へ減少している。ただし、修補工事と関連損失は残存している。
  11. FY2019-Q2RestatedAnnual report

    「海上土木分野を中心に、鉄道・発電所などのインフラ・社会資本の整備に継続的に取り組んでおります。当第2四半期連結累計期間の売上高は、手持工事の増加により前年同四半期に比べ15.0%増加し、38,641百万円となりました。セグメント利益(営業利益)は、工事利益率は改善しておりますが、施工不良関連損失引当金の見積差額の計上により前年同四半期に比べ28.5%減少し、1,151百万円となりました。」

    施工不良関連損失引当金の見積差額が引き続き国内土木事業の利益に影響しており、当第2四半期末の同引当金残高は7,466百万円となっている。
  12. FY2018-Q3RestatedAnnual report

    「平成28年に地盤改良工事における施工不良等や大学との共同研究に関する社員の贈賄被告事件(係争中)などの不祥事が明らかになりました。これらの原因は、コンプライアンス、内部統制の不徹底によるものであり、真摯に反省し、「技術と品質でお客様の信頼にお応えする新生東亜建設工業」となることを目指し、再発防止策に取り組んでおります。」

    地盤改良工事の施工不良等を既発生の不祥事として再掲し、再発防止策への取り組みを継続している。
  13. FY2018-Q2RestatedAnnual report

    「平成28年に地盤改良工事における施工不良等や大学との共同研究に関する社員の贈賄被告事件(係争中)などの不祥事が明らかになりました。これらの原因は、コンプライアンス、内部統制の不徹底によるものであり、真摯に反省し、「技術と品質でお客様の信頼にお応えする新生東亜建設工業」となることを目指し、再発防止策に取り組んでおります。」

    地盤改良工事の施工不良等を既発生の不祥事として再掲し、再発防止策への取り組みを継続している。
  14. FY2018-Q1RestatedAnnual report

    「地盤改良工事における施工不良等や大学との共同研究に関する社員の贈賄被告事件(係争中)などにより、株主様をはじめとする多くの関係者の皆様に多大なるご迷惑とご心配をおかけいたしましたことを、改めまして深くお詫び申し上げます。」

    地盤改良工事の施工不良等について、既発生の問題として謝罪と再発防止の文脈で再掲している。
  15. FY2017WorsenedAnnual report

    「Operating income was ¥6,196 million, down 47.4% from the previous consolidated fiscal year, and ordinary income was ¥5,897 million, down 44.4%. Net loss attributable to owners of the parent was ¥7,438 million, significantly affected by losses related to defective construction.」

    The defective-construction issue had a specific and growing financial impact, including ¥15,374 million in losses related to remedial costs and other matters and a ¥14,100 million provision for losses related to defective construction.
  16. FY2017-Q3RestatedAnnual report

    「当社が施工した地盤改良工事において、施工不良及び虚偽報告を行っていた事実が平成28年5月に判明いたしました。その後のボーリング調査の結果、平成28年10月にあらたに2件の工事において、十分な強度が確認されないことが判明いたしました。将来的には施工不良に伴う修補費用等、これらの問題に係る損失が生じる可能性がありますが、現時点ではその金額を合理的に見積もることは困難であるため、その影響を四半期連結財務諸表には反映しておりません。」

    施工不良・虚偽報告と新たに2件で十分な強度が確認されなかった事実、および損失額を合理的に見積もれない状況を再掲している。
  17. FY2017-Q2MaterialisedAnnual report

    「当社が施工した地盤改良工事において、施工不良及び虚偽報告を行っていた事実が平成28年5月に判明いたしました。その後のボーリング調査の結果、平成28年10月にあらたに2件の工事において、十分な強度が確認されないことが判明いたしました。将来的には施工不良に伴う修補費用等、これらの問題に係る損失が生じる可能性がありますが、現時点ではその金額を合理的に見積もることは困難であるため、その影響を四半期連結財務諸表には反映しておりません。」

    ボーリング調査により、平成28年10月に新たに2件で十分な強度が確認されない事実が判明し、施工不良問題の発生範囲が拡大した。
  18. FY2017-Q1MaterialisedAnnual report

    「It was discovered that the Company had carried out defective construction, falsified data and submitted false reports in ground-improvement works at Tokyo International Airport and elsewhere. We submitted to the Ministry of Land, Infrastructure, Transport and Tourism a report prepared by an investigative committee, including attorneys, on the causes and other findings, together with measures to prevent recurrence. Losses relating to this matter may arise in the future, but their amount cannot reasonably be estimated at present, so their impact has not been reflected in the quarterly consolidated financial statements.」

    The Company reconfirmed that defective construction, data falsification and false reporting had occurred and disclosed the possibility of future losses.
  19. FY2016First statedAnnual report

    「We established an investigative committee, including attorneys, concerning construction defects in ground-improvement works carried out by the Company at Tokyo International Airport and elsewhere, as well as the falsification of data and submission of false reports in completion documents and other materials to the Ministry of Land, Infrastructure, Transport and Tourism, the ordering party.」

    The Company disclosed that construction defects and false reporting had been identified and that an investigative committee had been established.
Moved together

"Increase in Outstanding Guarantees" moved the same way as this thread, in the same document, in 4 of its 19 moves.

433333★123456
  1. ★This thread
  2. 1Increase in Outstanding Guarantees4×
  3. 2Changes in Political and Economic Conditions and Laws and Regulations Overseas3×
  4. 3Decline in Revenue Due to Delays in the Progress and Start of Certain Projects3×
  5. 4Introduction of a performance-linked stock compensation plan3×
  6. 5Full-Scale Entry into Japan’s Offshore Wind-Farm Construction Market3×
  7. 6Impact of the COVID-19 Pandemic on Domestic and Overseas Operations and Business Performance3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Toa yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.