Komori
PS Construction (1871) · InitiativeAdvanced

Development of the DAX Beam HC Construction Method for Bridges with Shallow Girders

First written in FY2017. 3 of 4 entries say "Advanced", first in FY2019. Latest entry: FY2026.

4entries
10years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2017AdvancedFY2019 – FY20262017: 120172018: 020182019: 120192020: 020202021: 020212022: 020222023: 020232024: 120242025: 020252026: 12026
Same theme, other companies
Rollout and monetization of new bridge products and construction methodsA theme 2 companies write about · 0 as a headwind · 2 as a tailwind

1 other company's latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「Since 2024, the method has been applied to 2 bridges. For the bridge where it was applied for the first time, the validity of the design is being verified through continuous measurement of the actual bridge behavior. Based on these initial results, the company is currently conducting various tests to improve constructability and plans to construct the third bridge in fiscal 2026.」

    The DAX Beam HC method has been applied to 2 bridges and has advanced to the stage of testing to improve constructability based on the initial results, with construction of the third bridge planned for fiscal 2026.
  2. FY2024AdvancedAnnual report

    「By using high-strength concrete with a design standard strength of 100 N/mm2, this method can be applied to longer spans with a lower girder depth than conventional PC girders, which generally have a design standard strength of 50–60 N/mm2. The method was registered in the Ministry of Land, Infrastructure, Transport and Tourism's New Technology Information System (NETIS) in May 2023 and was first adopted for a bridge construction project ordered by a private company in July of the same year.」

    The DAX Beam HC method achieved concrete progress through its NETIS registration and first adoption for a privately ordered construction project.
  3. FY2019AdvancedAnnual report

    「The company is also developing DAX Beam HC, an improved version of the DAX Beam method, and is working to make the method available in commercially available bridge design software to promote the adoption of DAX Beam HC.」

    The company renewed the technical review certification for the DAX Beam method and is adapting bridge design software to promote the adoption of the improved DAX Beam HC technology.
  4. FY2017First statedAnnual report

    「At a public demonstration conducted at the company's technical research institute in December 2016, a flexural strength verification test was performed on a test specimen with a 12 m span, confirming that it had capacity exceeding the calculated value. Compared with conventional methods, this new method can reduce main-girder fabrication costs by 30% and construction costs by 10%, and is expected to be adopted as one option for constructing low girder-depth bridges in the future.」

    The company is developing a new method for low girder-depth bridges and conducted performance verification through a public demonstration. It expects to reduce main-girder fabrication costs by 30% and construction costs by 10%.
Moved together

"Average payout ratio of at least 23% during the medium-term management plan period" moved the same way as this thread, in the same document, in 3 of its 4 moves.

333322★123456
  1. ★This thread
  2. 1Average payout ratio of at least 23% during the medium-term management plan period3×
  3. 2Improving employee benefits and securing and developing personnel to support business strategy3×
  4. 3Use of retained earnings for new construction methods and technologies, plant reconstruction, and information-related investments3×
  5. 4Improving PC and Conventional Technologies and Conducting Joint Research with Industry, Academia and Government3×
  6. 5Improvements in Operating Profit, Ordinary Profit and Net Profit and Increase in Equity Ratio2×
  7. 6Focus on Large-Scale Upgrades, Maintenance and PC Construction2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for PS Construction yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.