PS Construction (1871) · RiskWorsenedLatest Earnings (2026-08-06): "Mitigated"

Expected Losses on Construction Projects on Hand and Increase in Provisions for Construction Losses

First written in FY2024. 4 of 6 entries say "Mitigated", first in FY2025-H1. Latest entry: 2026-08-06.

6entries
3years
1from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseMaterialisedFY2024MitigatedFY2025-H1 – FY2026-H12024: 220242025: 220252026: 22026
Same theme, other companies
Release of the Provision for Losses on Contracts Expected to Incur LossesA theme 148 companies write about · 147 as a headwind · 1 as a tailwind

57 other companies' latest entry also says "Mitigated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 148 companies compared. The sentences above are computed from all 148.
Full recordFilings, disclosures and news, newest first
  1. 2026-08-06MitigatedEarnings

    「工事損失引当金 45 17」

    工事損失引当金は2026年3月末の45百万円から2026年6月末の17百万円へ減少した。
  2. FY2026WorsenedAnnual report

    「The provision for losses on construction contracts is recorded at the estimated amount of future losses for projects in hand and other projects for which losses are expected to arise, in preparation for those future losses.」

    The provision for losses on construction contracts increased from ¥35 million at the end of the previous fiscal year to ¥45 million, with the provision for projects in hand expected to incur losses increasing again.
  3. FY2026-H1MitigatedAnnual report

    「The provision for losses on construction contracts is recorded at the estimated amount of future losses for projects in hand and other projects for which losses are expected to arise, in preparation for those future losses.」

    The provision for losses on construction contracts decreased from ¥35 million at the end of the previous fiscal year to ¥21 million, reducing the provision for projects in hand expected to incur losses.
  4. FY2025MitigatedAnnual report

    「The provision for losses on construction contracts is recorded at the estimated amount of future losses for projects in hand and other projects for which losses are expected to arise, in preparation for those future losses.」

    The provision for losses on construction contracts decreased from ¥549 million at the end of the previous fiscal year to ¥35 million, reducing the provision for projects in hand expected to incur losses.
  5. FY2025-H1MitigatedAnnual report

    「The provision for losses on construction contracts is recorded at the estimated amount of future losses for projects in hand and other projects for which losses are expected to arise, in preparation for those future losses.」

    The provision for losses on construction contracts decreased from ¥549 million at the end of the previous fiscal year to ¥78 million. Although a provision remains for projects in hand expected to incur losses, the provision amount has declined.
  6. FY2024MaterialisedAnnual report

    「The provision for losses on construction contracts is recorded at the estimated amount of future losses for projects in hand and other projects for which losses are expected to arise, in preparation for those future losses.」

    The provision for losses on construction contracts increased from ¥139 million in the previous fiscal year to ¥549 million, indicating that projects in hand expected to incur losses had become reflected as an accounting provision. The company cited material prices, construction conditions and design changes as factors in its estimates.
Moved together

"Improvements in Operating Profit, Ordinary Profit and Net Profit and Increase in Equity Ratio" moved the same way as this thread, in the same document, in 4 of its 6 moves.

433222★123456
  1. ★This thread
  2. 1Improvements in Operating Profit, Ordinary Profit and Net Profit and Increase in Equity Ratio4×
  3. 2Year-on-year Increase in Order Intake and Expansion of Building Construction Orders3×
  4. 3Use of retained earnings for new production methods and technologies, plant restructuring and information-related investment3×
  5. 4Lower revenue and a wider segment loss in the manufacturing business2×
  6. 5Focus on Large-Scale Upgrades, Maintenance and PC Construction2×
  7. 6THE GREEN VISION's environmental initiatives enter full swing2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for PS Construction yet. It last moved in the Earnings of 2026-08-06: "Mitigated".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Expected Losses on Construction Projects on Hand and Increase in Provisions for Construction Losses | PS Construction Co.,Ltd. (1871) | Komori