Komori
Asanuma (1852) · RiskReframed

Damages Claims Arising from Serious Defects in Construction Projects

First written in FY2016. 3 of 6 entries say "Restated". Latest entry: FY2026.

6entries
11years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY2019WorsenedFY20202016: 120162017: 120172018: 120182019: 120192020: 120202021: 020212022: 020222023: 020232024: 020242025: 020252026: 12026
Same theme, other companies
Housing and Real Estate Construction Defect and Defect Liability RiskA theme 103 companies write about · 103 as a headwind · 4 as a tailwind

Asanuma moved to the "Worse" side of this theme in 2020, 3 years before the typical company in this theme (2023).

The whole theme swung hardest in 2026: 7 of 39 companies on the "Worse" side.

11 other companies' latest entry also says "Reframed".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 103 companies compared. The sentences above are computed from all 103.
Full recordFilings, disclosures and news, newest first
  1. FY2026ReframedAnnual report

    「If a non-conformity occurs in a completed project, this could have an extremely serious impact on the Group's business performance, as it would not only undermine customers' confidence in the quality of the Group's construction work and its social reputation, but also require the Group to provide compensation to customers and third parties under its liability for non-conformity.」

    The terminology has changed from defects and warranty liability for defects to non-conformity and liability for non-conformity, while the recognition of risks involving compensation for customers and third parties and a serious impact on business performance has been maintained.
  2. FY2020WorsenedAnnual report

    「If a defect occurs in a completed project, this could have an extremely serious impact on the Group's business performance, as it would not only undermine customers' confidence in the quality of the Group's construction work and its social reputation, but also require the Group to provide compensation to customers and third parties under its warranty liability for defects.」

    The disclosure specifies the risks associated with damages arising from major defects, including compensation for customers and third parties, damage to trust and social reputation, and an extremely serious impact on business performance.
  3. FY2019RestatedAnnual report

    「If a major defect occurs in a construction project completed by the Group, damages and other costs arising from warranty liability for defects may be incurred, potentially affecting business performance and other matters.」

    The risk of major defects in completed construction projects and resulting damages is reiterated.
  4. FY2018RestatedAnnual report

    「If a major defect occurs in a construction project completed by the Group, damages and other costs arising from warranty liability for defects may be incurred, potentially affecting business performance and other matters.」

    The risk of damages arising from major defects in completed construction projects and warranty liability for defects is reiterated.
  5. FY2017RestatedAnnual report

    「If a major defect occurs in a construction project completed by the Group, damages and other costs arising from warranty liability for defects may be incurred, potentially affecting business performance and other matters.」

    The risk of damages arising from major defects in completed construction projects and warranty liability for defects is reiterated.
  6. FY2016First statedAnnual report

    「If a major defect occurs in a construction project completed by the Group, damages and other costs arising from warranty liability for defects may be incurred, potentially affecting business performance and other matters.」

    Major quality defects and warranty liability for defects are identified as business performance risks.
Moved together

"Downward pressure on the domestic economy from a downturn in overseas economies" moved the same way as this thread, in the same document, in 2 of its 6 moves.

22★12
  1. ★This thread
  2. 1Downward pressure on the domestic economy from a downturn in overseas economies2×
  3. 2Construction Delays and Additional Costs Caused by Construction-Phase Accidents2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Asanuma yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Damages Claims Arising from Serious Defects in Construction Projects | ASANUMA CORPORATION (1852) | Komori