Construction Delays and Additional Costs Caused by Construction-Phase Accidents

First written in FY2016. 4 of 10 entries say "Materialised", first in 2026-05-13. Latest entry: FY2026.

10entries
11years
3from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY2019WorsenedFY20202016: 120162017: 120172018: 120182019: 120192020: 120202021: 020212022: 020222023: 020232024: 020242025: 120252026: 42026
Same theme, other companies
Risk of Construction Delays and Additional Costs Due to Natural DisastersA theme 21 companies write about · 22 as a headwind · 0 as a tailwind

Asanuma moved to the "Worse" side of this theme in 2026, 8 years after the typical company in this theme (2018).

The whole theme swung hardest in 2025: 3 of 6 companies on the "Worse" side.

5 other companies' latest entry also says "Materialised".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 21 companies compared. The sentences above are computed from all 21.
Full recordFilings, disclosures and news, newest first
  1. FY2026MaterialisedAnnual report

    「One fatal accident occurred at one of our worksites. The Group takes this matter seriously, investigated the causes by soliciting opinions from employees and partner companies, and has submitted a recurrence-prevention plan based on the findings to the relevant regulatory authorities.」

    The disclosure states that 1 fatal accident actually occurred in relation to construction accident risks. It also describes measures including investigating the causes, submitting a recurrence-prevention plan to the relevant regulatory authorities, sharing the findings with all worksites, and strengthening management systems and safety training.
  2. FY2025The risk of compensation for construction accidents and mitigation through liability insurance are explicitly stated.Annual report

    「The Group undertakes various initiatives every day to ensure safety during construction. However, if an accident occurs, this could have an extremely serious impact on the Group's business performance, as it would not only undermine customers' confidence in the safety of the Group's construction work and its social reputation, but also require the Group to provide compensation to injured or deceased workers and third parties. The Group currently maintains liability insurance with coverage amounts and scope broadly in line with industry standards, with the aim of mitigating various losses arising from construction accidents and ensuring compensation for victims.」

    For construction accident risks, the disclosure now covers not only construction delays and additional costs, but also compensation for workers and third parties, damage to trust and social reputation, and mitigation through liability insurance.
  3. FY2020WorsenedAnnual report

    「If a major earthquake, typhoon, volcanic eruption or other disaster occurs in any region, or if a fire, flood, terrorist attack or other disaster occurs at a construction site, resulting in construction delays or additional costs, the Group's management may be materially affected.」

    The scope has been expanded from weather-related disasters during construction to include major natural disasters, fires, floods and terrorist attacks, with the potential for a material impact on management explicitly stated.
  4. FY2019RestatedAnnual report

    「If an unexpected disaster occurs during construction due to weather or other causes, business performance and other matters may be affected by construction delays and additional costs.」

    The risk of construction delays and additional costs resulting from accidents during construction is reiterated.
  5. FY2018RestatedAnnual report

    「If an unexpected disaster occurs during construction due to weather or other causes, business performance and other matters may be affected by construction delays and additional costs.」

    The risks of disasters caused by weather or other factors during construction, construction delays and additional costs are reiterated.
  6. FY2017RestatedAnnual report

    「If an unexpected disaster occurs during construction due to weather or other causes, business performance and other matters may be affected by construction delays and additional costs.」

    The risks of disasters caused by weather or other factors during construction, construction delays and additional costs are reiterated.
  7. FY2016First statedAnnual report

    「If an unexpected disaster occurs during construction due to weather or other causes, business performance and other matters may be affected by construction delays and additional costs.」

    Unexpected disasters caused by weather or other factors during construction are identified as a risk.
Moved together

"Downward pressure on the domestic economy from a downturn in overseas economies" moved the same way as this thread, in the same document, in 2 of its 10 moves.

2222★1234
  1. ★This thread
  2. 1Downward pressure on the domestic economy from a downturn in overseas economies2×
  3. 2Soaring Prices for Key Materials and Labor Costs2×
  4. 3Damages Claims Arising from Serious Defects in Construction Projects2×
  5. 4Business impact of shortages of qualified and skilled personnel and labor disputes2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Asanuma yet. It last moved in the General Meetings of Shareholders of 2026-06-10: "Materialised".