Komori
Asanuma (1852) · InitiativeAdvanced

Develop BIM, CIM and other ICT-related systems, as well as core systems

First written in FY2017. 9 of 10 entries say "Advanced", first in FY2018. Latest entry: 2026-08-06.

10entries
10years
1from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2018 – 2026-08-062017: 120172018: 120182019: 120192020: 120202021: 120212022: 020222023: 020232024: 120242025: 220252026: 22026
Same theme, other companies
Integrated development of ICT, including BIM and CIM, and enterprise-wide core systemsA theme 3 companies write about · 0 as a headwind · 3 as a tailwind

1 other company's latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. 2026-08-06AdvancedEarnings

    「The company decided to consolidate and operate multiple systems used at construction sites and paper-based operations on a common platform, and is proceeding with the transition and rollout toward implementation at all sites during fiscal 2026. This is expected to make a significant contribution to improving the efficiency of site operations.」

    The DX and ICT initiative has progressed from developing and rolling out individual systems to consolidating multiple systems and paper-based operations on a common platform and moving toward implementation at all sites.
  2. FY2026AdvancedAnnual report

    「The BIM model-based experiential construction-management education system “Genba Trainer” for young employees expanded its subscription-based services to other companies during the current fiscal year.」

    DX and ICT initiatives have progressed from the development and release of an internal education system to the expansion of Genba Trainer subscription services for other companies.
  3. FY2026-H1AdvancedAnnual report

    「We provide DX training to all employees to improve DX literacy and foster awareness across the company, as well as to develop personnel capable of promoting DX. Through this training, we are building the foundation for accelerating transformation within the company.」

    DX initiatives have expanded beyond system development and certification to DX training for all employees and the development of personnel capable of promoting DX, reaching the stage of building the foundation for internal transformation.
  4. FY2025AdvancedAnnual report

    「In addition, as part of our DX initiatives, in March 2024 we obtained certification as a DX Certified Operator under the Ministry of Economy, Trade and Industry’s DX Certification System.」

    DX initiatives have progressed from policy and system development to certification as a DX Certified Operator, field testing of the AI-based self-inspection system for rebar placement, and expansion of Genba Trainer subscriptions for other companies.
  5. FY2024-Q3AdvancedAnnual report

    「As a human-resources training tool, we jointly developed with another company a system called “Genba Trainer,” which enables users to learn construction management, and released it last autumn. It recreates a virtual worksite with visuals comparable to those of an RPG game, allowing users to operate avatars in a game-like manner while learning. We plan to roll it out as a training and self-development tool, initially for young employees.」

    The ICT-based education system “Genba Trainer” has been developed and released, progressing to the stage of deploying construction-management learning using a virtual worksite for training and self-development by young employees.
  6. FY2021AdvancedAnnual report

    「Across the company, BIM (building information modeling) is being promoted mainly by the BIM Promotion Office for design and construction. At the technology research institute, we are using VR (virtual reality) to develop a technical education system using virtual spaces on computers, and advancing development of a quality-control system using AI (artificial intelligence), specifically a self-inspection system for rebar placement.」

    In addition to rolling out BIM company-wide, the company has used a technical education system based on 3D models in training for young engineers. Further development and field testing of the AI-based self-inspection system for rebar placement are planned, and a ¥367 million capital investment in ICT-related systems is scheduled for completion in March 2024.
  7. FY2020AdvancedAnnual report

    「During the current fiscal year, we developed technical education content for reinforced-concrete construction using 3D models and began using it in training for young engineers and other programs.」

    The use of BIM and ICT has progressed to the development of 3D educational content for reinforced-concrete construction and its initial use in training for young engineers.
  8. FY2019AdvancedAnnual report

    「During the current fiscal year, we developed technical education content for steel-frame construction using 3D models and began using it in training for young engineers.」

    The use of BIM and ICT has reached the operational stage, with technical education content developed and put into use in training for young engineers.
  9. FY2018AdvancedAnnual report

    「Across the company, BIM (building information modeling) is being promoted mainly by the BIM Promotion Office for design and construction. At the technology research institute, we are using VR (virtual reality) to develop a technical education system using virtual spaces on computers and researching the potential of a quality-control system using MR (mixed reality).」

    BIM use is being rolled out company-wide under the leadership of the BIM Promotion Office, while research is progressing into technical education using VR and quality-control systems using MR.
  10. FY2017First statedAnnual report

    「Head office: ICT-related systems (BIM, CIM, etc.)」

    The company has disclosed for the first time a plan to invest ¥590 million in BIM-, CIM- and other ICT-related systems and ¥609 million in core systems, including accounting, payroll, sales, construction and planning systems. Both are scheduled for completion in March 2020.
When this could move next
No upcoming earnings preview for Asanuma yet. It last moved in the Earnings of 2026-08-06: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Develop BIM, CIM and other ICT-related systems, as well as core systems | ASANUMA CORPORATION (1852) | Komori