Difference in Profit Levels Due to Large-Project Design-Change Contracts in the Prior Year
First written in FY2019-Q2. 2 of 6 entries say "Mitigated", first in FY2024-Q3. Latest entry: FY2025.
6entries
8years
0from disclosures
How it moved
Same theme, other companies
Improving Construction Profitability through Change-Order Negotiations and Cost Reductions for Large-Scale ProjectsA theme 3 companies write about · 1 as a headwind · 2 as a tailwind
0 other companies' latest entry also says "Mitigated".
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
- FY2025MitigatedAnnual report
「関東・関西地区での高速道路株式会社発注工事の最終設計変更契約が円滑に実施できたこと」
大型工事の設計変更がなかったことによる利益水準差が過去に示されていたが、今回は高速道路会社発注工事で最終設計変更契約を円滑に実施したと説明した。 - FY2024-Q3MitigatedAnnual report
「JVにて受注しているNEXCO中日本発注の床版取替工事や阪神高速道路発注の大型補修補強工事では設計変更による増額を獲得いたしました。また民間工事では工場製品のプレキャストPC床版製作や下部工補強工事の設計変更による増額を獲得いたしました。」
前年同期に大型工事の設計変更がなかったことによる利益水準差が示されていたが、今回はNEXCO中日本・阪神高速道路等の工事や民間工事で設計変更による増額を獲得したと記載した。 - FY2023-Q3大型工事の設計変更がなく利益減少Annual report
「セグメント利益は、セメントや鋼材などの原材料価格の高騰、大型工事における設計変更がなかったことなどにより2,000百万円(前年同四半期比15.9%減)となりました。」
大型工事における設計変更がなかったことが、原材料価格高騰とともに土木事業のセグメント利益減少要因として記載された。 - FY2020ReinclusionAnnual report
「前期と比べて大型工事の設計変更も少なく、一部工事の遅延などの影響もあり、2,815百万円(前期比6.5%減)となりました。」
一度記載が薄れていた、前年に比べて大型工事の設計変更が少ないことによる利益水準差が、通期の土木事業減益要因として再び記載された。 - FY2019-Q3DroppedAnnual report
「セグメント利益は1,904百万円(前年同四半期比12.9%減)となりました。」
前四半期に示された「前年同四半期に大型工事の設計変更契約が多かった」ことによる比較上の利益差は、本 filingでは具体的要因として記載されていない。 - FY2019-Q2First statedAnnual report
「セグメント利益につきましては、前年同四半期に大型工事の設計変更契約が多かった影響で前年同四半期に比べて減少し、1,041百万円(前年同四半期比37.6%減)となりました。」
土木事業のセグメント利益減少について、前年同期に大型工事の設計変更契約が多かったことによる比較上の影響を新たな要因として説明した。