Komori
Tanabe Engineering (1828) · InitiativeDropped

Strengthening measures to prevent COVID-19 infections and the spread of infection

First written in FY2021-Q1. 4 of 6 entries say "Restated". Latest entry: FY2024.

6entries
5years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2021-Q1 – FY20242020: 220202021: 220212022: 120222023: 020232024: 12024
Same theme, other companies
Response to COVID-19 and Transformation of Work StylesA theme 795 companies write about · 219 as a headwind · 531 as a tailwind

The whole theme swung hardest in 2026: 2 of 9 companies on the "Worse" side.

40 other companies' latest entry also says "Dropped".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 200 companies compared. The sentences above are computed from all 200.Comparing 200 of the theme's 798 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2024DroppedAnnual report
    In this filing, the specific disclosures previously provided regarding measures to prevent COVID-19 infection and its spread, such as working from home, taking temperatures and maintaining space at worksites, could not be confirmed.
  2. FY2022RestatedAnnual report

    「・Measures prioritizing employee safety and health, such as working from home, refraining from business travel and taking daily temperatures ・On-site infection prevention measures in line with standards established by customers, such as maintaining space between workers and checking workers’ activity histories」

    The company continues to implement infection prevention measures, including working from home, refraining from business travel, taking temperatures, maintaining space at worksites and checking activity histories.
  3. FY2021RestatedAnnual report

    「In particular, with respect to COVID-19, which has spread worldwide, the company is working to minimize its impact by establishing an appropriate management framework for prevention and containment measures, including: ・Measures prioritizing employee safety and health, such as working from home, refraining from business travel and taking daily temperatures ・On-site infection prevention measures in line with standards established by customers, such as maintaining space between workers and checking workers’ activity histories」

    The company continues to implement measures to prevent infection and its spread, including working from home, refraining from business travel, taking temperatures, maintaining space at worksites and checking activity histories.
  4. FY2021-Q3RestatedAnnual report

    「Under these circumstances, the Group continues to implement various measures to prevent infection and its spread. In Japan, no significant construction sites have been closed and no construction schedules have been postponed, and production activities have not experienced significant disruption.」

    The company continues to implement measures to prevent infection and its spread. It states that in Japan there has been no significant disruption to production activities, such as the closure of major construction sites or postponement of construction schedules.
  5. FY2021-Q2RestatedAnnual report

    「Under these circumstances, the Group is further strengthening and thoroughly implementing various measures to prevent infection and its spread.」

    As part of its response to COVID-19, the company continues to strengthen and thoroughly implement measures to prevent infection and its spread.
  6. FY2021-Q1First statedAnnual report

    「Under these circumstances, the Group is further strengthening and thoroughly implementing various measures to prevent infection and its spread.」

    As part of its response to COVID-19, the company has disclosed for the first time its efforts to strengthen and thoroughly implement various measures to prevent infection and its spread.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
Tanabe Engineering's next results are scheduled for 2026-11-09. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.