The Zenitaka (1811) · InitiativeDecrease in the number of projects using the system
Use of a real-time road surface measurement system in construction projects
First written in FY2021. 1 of 3 entries say "Advanced", first in FY2022. Latest entry: FY2023.
3entries
3years
0from disclosures
How it moved
Same theme, other companies
Real-time measurement and monitoring of road-surface settlement associated with underground constructionA theme 1 companies write about · 0 as a headwind · 1 as a tailwind
No other company in this theme has enough history to compare yet.
Full recordFilings, disclosures and news, newest first
- FY2023Decrease in the number of projects using the systemAnnual report
「Against this backdrop, the system was used on 4 construction projects in fiscal 2022.」
The number of construction projects using the real-time road surface measurement system decreased from 5 in the previous fiscal year to 4. - FY2022AdvancedAnnual report
「Against this backdrop, the system was used on 5 construction projects in fiscal 2021.」
The number of construction projects using the real-time road surface measurement system increased from 4 in the previous fiscal year to 5. - FY2021First statedAnnual report
「In fiscal 2020, the system was used on 4 construction projects, including a shield tunneling project in Fukuoka Prefecture to ensure construction safety.」
Developed a system for continuously measuring and monitoring road subsidence associated with underground construction, and used it on 4 construction projects in fiscal 2020.