Risk of Rising Construction Material Prices and Labor Costs

First written in FY2016. 24 of 32 entries say "Worsened", first in FY2017. Latest entry: 2026-08-07.

32entries
11years
4from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseWorsenedFY2017 – FY20242016: 220162017: 220172018: 420182019: 220192020: 220202021: 320212022: 420222023: 320232024: 320242025: 220252026: 52026
Same theme, other companies

Moriya moved to the "Worse" side of this theme in 2018, 4 years before the typical company in this theme (2022).

The whole theme swung hardest in 2022: 28 of 41 companies on the "Worse" side.

14 other companies' latest entry also says "Worsened".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 50 companies compared. The sentences above are computed from all 50.
Full recordFilings, disclosures and news, newest first
  1. 2026-08-07WorsenedEarnings

    「Further increases in construction costs reflecting persistently high labor costs caused by the industry’s serious shortage of workers, as well as material shortages and price increases resulting from instability in securing resources」

    The company describes persistently high labor costs, material shortages and price increases, and further increases in construction costs. It also states that pass-through of higher construction costs is progressing.
  2. FY2026MitigatedAnnual report

    「Meanwhile, the earnings environment is beginning to support the securing and improvement of construction earnings as rigorous risk management is applied to each construction project and the persistently high construction costs are gradually being passed on to contract prices.」

    It states that although high construction costs continue, pass-through into order prices is progressing and measures to address margin deterioration caused by rising costs are advancing.
  3. FY2026-H1WorsenedAnnual report

    「Meanwhile, although the order environment has gradually improved as the domestic economy has finally emerged from a prolonged deflationary period and price dumping competition for construction work has subsided, logistics and labor costs are also rising due to persistently high construction material prices, tighter regulations on overtime work and the worsening labor shortage. As there are limits to securing earnings through DX and productivity improvements, downward pressure on earnings remains strong and the future business environment cannot be viewed optimistically.」

    While indicating that price dumping competition has subsided, it describes persistently high construction material prices, soaring logistics and labor costs, and limits to securing earnings through DX and productivity improvements. The situation has returned from the absorption of rising costs indicated for the full fiscal year of the previous year to one in which downward pressure on earnings remains strong.
  4. FY2025MitigatedAnnual report

    「Although the current earnings environment has largely absorbed persistently high construction material prices and higher logistics and labor costs resulting from the promotion of work-style reforms and the labor shortage, and improvements in employee compensation are also progressing, the future earnings environment is expected to change significantly depending on trends in the order environment」

    It states that higher material, logistics and labor costs have largely been absorbed at present, indicating that measures are being taken to address the impact of rising costs. However, the possibility of future deterioration remains.
  5. FY2025-H1RestatedAnnual report

    「The earnings environment remains under pressure from persistently high construction material prices and higher transportation and labor costs due to the labor shortage, with increased costs to address the construction industry's “2024 problem” also added, and the downward pressure on earnings continues to intensify.」

    Persistently high construction material prices, higher transportation and labor costs due to the labor shortage, and costs to address the construction industry's “2024 problem” continue to weigh on earnings. It is stated that there have been no significant changes in business and other risks.
  6. FY2024WorsenedAnnual report

    「Meanwhile, in the earnings environment, persistently high construction material prices and rising labor costs due to the chronic labor shortage are increasingly weighing on earnings. In addition, the increased burden of costs to address the so-called “2024 problem” of work-style reform in the construction industry, implemented from 1 April this year, has added to the pressure, making the future earnings environment increasingly uncertain.」

    In addition to persistently high construction material prices and higher labor costs, the increased burden of costs to address the construction industry's “2024 problem” of work-style reform has been added and specified as a factor weighing on earnings.
  7. FY2024-Q3WorsenedAnnual report

    「In the earnings environment, persistently high construction material prices and rising distribution and labor costs due to the worsening labor shortage are increasingly weighing on earnings. In addition, higher miscellaneous expenses associated with the implementation of the Work Style Reform-related Act from 1 April this year are a concern, leaving the outlook for future performance uncertain.」

    In addition to persistently high construction material prices, rising distribution and labor costs are increasingly weighing on earnings, while higher miscellaneous expenses associated with implementation of the Work Style Reform-related Act have also been added.
  8. FY2024-Q2WorsenedAnnual report

    「Meanwhile, the earnings environment is already being weighed down by persistently high construction material prices and rising distribution costs and labor costs, while higher miscellaneous expenses associated with the full implementation of work-style reforms will add further negative factors, leaving the outlook for future performance uncertain.」

    In addition to persistently high construction material prices, rising distribution costs and labor costs are already weighing on earnings, while higher miscellaneous expenses associated with the full implementation of work-style reforms have been added as a future deterioration factor. The impact on the operating environment is becoming more concrete and expanding. Although it has not been quantified, the actual impact on the earnings environment is described.
  9. FY2023WorsenedAnnual report

    「There are concerns over persistently high construction material and energy prices and declining investment sentiment due to higher costs, and the operating environment surrounding the construction industry is expected to become increasingly challenging.」

    Persistently high construction material and energy prices and declining investment sentiment due to higher costs continue to be cited as factors worsening the earnings environment.
  10. FY2023-Q3WorsenedAnnual report

    「In addition, the earnings environment remains difficult to view optimistically overall, as soaring construction material prices driven by the invasion of Ukraine and the rapid depreciation of the yen, together with higher labor costs and other factors, are increasingly likely to put pressure on earnings.」

    It states that soaring construction material prices caused by the invasion of Ukraine and the rapid depreciation of the yen, together with higher labor costs, are increasingly likely to put pressure on earnings. Concern over the risk of higher construction-related costs continues.
  11. FY2023-Q2WorsenedAnnual report

    「The increase in construction costs resulting from higher construction material prices and labor costs is a factor behind the decline in inquiries for projects」

    It states that higher construction material prices and labor costs have increased construction costs, contributing to the decline in inquiries for projects.
  12. FY2023-Q1WorsenedAnnual report

    「The order environment in the construction industry, the Group’s core business, is expected to remain firm, supported by continued public investment under extensions of the national resilience policy. A certain level of private construction demand is also expected from large-scale urban redevelopment, renewal and renovation of aging facilities, and the solid housing market. However, the earnings environment is expected to become even more challenging as pressure for higher labor costs due to soaring material prices and chronic shortages of construction engineers and skilled workers is intensifying beyond previous levels.」

    The increase in construction costs caused by a sharp rise in material prices and the pressure for higher labor costs due to shortages of construction technical and skilled workers have intensified further, worsening the risk of higher construction-related costs.
  13. FY2022WorsenedAnnual report

    「In addition to the increasingly pronounced rise in prices for construction materials such as steel and cement, if unit labor costs for construction workers rise, quoted prices will increase and weaken price competitiveness when bidding for projects, while if this occurs during construction, it will affect the construction schedule and costs」

    It states that the rise in construction material prices is becoming increasingly pronounced, and expresses concern over its impact on orders and construction costs, together with higher labor costs.
  14. FY2022-Q3WorsenedAnnual report

    「Profitability is beginning to show signs of weakness due to soaring and persistently high material prices, among other factors,」

    It states that soaring and persistently high material prices are beginning to affect profitability, and that the impact of the risk of higher construction-related costs is increasing.
  15. FY2022-Q2WorsenedAnnual report

    「In the public works sector, the order environment in the construction industry, the core business of our Group, remains stable, with steady demand for infrastructure renewal and other projects related to national resilience policies. In the private-sector construction field, housing demand remains firm for both for-sale and rental housing despite the COVID-19 pandemic. However, the earnings environment is becoming increasingly difficult as signs of price competition have begun to re-emerge amid a trend toward fewer projects, while major general contractors are increasingly entering regional projects as large-scale projects decline, particularly in major metropolitan areas. This is compounded by higher labor costs resulting from chronic labor shortages and rising material prices.」

    It states that higher labor costs due to chronic labor shortages and rising material prices, combined with price competition and a decline in projects, are making the earnings environment more challenging. Concern over the risk of higher construction-related costs is increasing.
  16. FY2022-Q1WorsenedAnnual report

    「The order environment in the construction industry, the Group’s core business, is expected to remain firm in public investment due to measures to strengthen national resilience and extend the service life of social infrastructure. However, private-sector construction investment is beginning to trend downward. The earnings environment is expected to deteriorate as price competition to secure projects reduces profitability, compounded by higher labor costs due to shortages of technical and skilled workers and increases in the prices of some materials. The outlook remains uncertain.」

    Increases in labor costs due to shortages of technical and skilled workers, together with rising prices for some materials, are cited as factors adding to margin deterioration from price competition, heightening concern over the risk of higher construction-related costs.
  17. FY2021WorsenedAnnual report

    「In the construction market, competition over order prices is intensifying, and some labor costs and construction materials have shifted to an upward trend,」

    In addition to intensifying competition over order prices, some labor costs and construction materials have shifted to an upward trend, heightening concerns about cost-increase risk.
  18. FY2020WorsenedAnnual report

    「Regarding the outlook for construction investment, government construction investment is expected to remain at the previous year's level due to the promotion of national resilience policies and other measures. However, private construction investment could slow sharply if the COVID-19 pandemic is prolonged. In addition, chronic labor shortages, the aging of construction workers, and declining productivity are expected to persist, while labor costs, material prices, and personnel expenses are also expected to rise. As a result, the business environment surrounding the construction industry is expected to become even more difficult.」

    In addition to the possibility of a sharp slowdown in private construction investment if the pandemic is prolonged, the company highlights labor shortages, an aging workforce, declining productivity, and rising labor costs, material prices, and personnel expenses, strengthening its outlook for a deterioration in the cost environment.
  19. FY2020-Q3WorsenedAnnual report

    「Looking ahead, although the increasing number of foreign visitors to Japan and the upward trend in public works are positive factors, the earnings environment is becoming more challenging due to lost ordering opportunities caused by labor shortages and persistently high labor and material costs. Economic sentiment is gradually deteriorating, particularly in regional areas.」

    The company states that the earnings environment is becoming more difficult due to persistently high personnel and material costs, heightening concerns about the risk of higher construction-related costs.
  20. FY2019WorsenedAnnual report

    「Higher construction material prices, labor costs, and personnel expenses due to labor shortages are difficult to avoid,」

    The company identifies higher construction material prices, labor costs, and personnel expenses resulting from labor shortages as unavoidable factors, with concerns about cost-increase risk continuing and intensifying.
  21. FY2019-Q3WorsenedAnnual report

    「At the same time, pressure for higher costs is beginning to emerge as construction demand remains elevated, labor shortages become more severe, and work-style reforms are enacted. Competition for orders to secure projects after the Olympics and Paralympics is also beginning to flare up, and the business environment is becoming increasingly difficult to view optimistically.」

    Pressure for higher costs arising from the enactment of work-style reforms, in addition to worsening labor shortages, has been identified, heightening concerns about the risk of higher costs for construction materials, labor, and other items.
  22. FY2019-Q2MaterialisedAnnual report

    「In addition to higher construction costs, declining public investment in regional areas, and worsening labor shortages and the resulting difficulty in responding to orders,」

    The company identifies higher construction costs as an actual factor in the business environment during the current quarter, indicating that the risk of higher construction material prices and labor costs remains present.
  23. FY2019-Q1MaterialisedAnnual report

    「In regional areas, the business environment continues to contain risks of deteriorating operating performance, including broad restraints on public investment, sluggish demand associated with increasingly severe labor shortages and population declines, and rising prices of materials and equipment.」

    The company identifies higher equipment and material prices as an actual factor affecting the business environment in the current quarter, indicating that the risk of higher construction-related costs has materialized.
  24. FY2018WorsenedAnnual report

    「The construction market is expected to remain in a difficult business environment, as competition over order prices intensifies, labor costs and construction material prices rise sharply, and shortages of construction engineers and skilled workers become increasingly severe.」

    The company continues to be concerned about competition over order prices and sharp increases in labor costs and material prices, together with the worsening shortage of personnel.
  25. FY2018-Q3WorsenedAnnual report

    「The company is concerned that the business environment may become significantly more difficult, as further cost-increasing factors arising from chronic labor shortages and work-style reforms are expected to emerge.」

    The company indicates that future cost-increasing factors associated with labor shortages and work-style reforms are expected to be added, heightening concerns about the risk of higher construction-related costs.
  26. FY2017WorsenedAnnual report

    「The construction market is expected to remain in a difficult business environment, as competition over order prices intensifies, labor costs and construction material prices rise sharply, and shortages of construction engineers and skilled workers become increasingly severe.」

    The company again explicitly identifies competition over order prices and sharp increases in labor costs and construction material prices as concerns in the business environment.
  27. FY2017-Q3MitigatedAnnual report

    「The upward trend in construction material prices and labor costs has largely subsided」

    The company states that the upward trend in construction material prices and labor costs has largely subsided, easing cost-increase risk.
  28. FY2017-Q2MitigatedAnnual report

    「The pass-through of cost increases into order prices has become largely established, and construction profit margins improved further」

    The company states that the ability to reflect higher costs in order prices has become largely established, and that progress has been made in addressing the risk of lower profitability due to higher material prices and labor costs.
  29. FY2016First statedAnnual report

    「If prices for construction materials such as steel and cement and unit labor costs for construction workers rise, quoted prices will increase and weaken the company's price advantage in order competitions. If such increases occur during construction, they will also affect the construction period and costs,」

    The company states that higher material and outsourced labor costs could affect order competitions, construction periods, and construction costs.
Moved together

"Aging and Chronic Shortages of Skilled Construction Workers and Engineers" moved the same way as this thread, in the same document, in 23 of its 32 moves.

231715151411★123456
  1. ★This thread
  2. 1Aging and Chronic Shortages of Skilled Construction Workers and Engineers23×
  3. 2Risk of lower orders due to an economic downturn and declining public investment17×
  4. 3Improving the Consolidated Operating Margin and Construction Project Profitability15×
  5. 4Risk of Intensifying Competition and Declining Contract Prices15×
  6. 5Profit Growth Through Improved Project Profitability14×
  7. 6Instability in the International Situation and Geopolitical Risks11×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Moriya yet. It last moved in the Earnings of 2026-08-07: "Worsened".