Komori
Taiyo Kisokogyo (1758) · RiskWorsened

Deteriorating profitability due to price competition when securing orders and loss-making construction projects

First written in FY2018-Q2. 8 of 19 entries say "Materialised", first in FY2018-Q2. Latest entry: FY2027-H1.

19entries
10years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseMaterialisedFY2018-Q2MaterialisedFY2020-Q2 – FY2022-Q3MaterialisedFY2024-Q3 – FY20252017: 12018: 120182019: 120192020: 220202021: 320212022: 320222023: 420232024: 120242025: 220252026: 12026
Same theme, other companies
Cost, Schedule and Profitability Risk in Construction Contracting ProjectsA theme 34 companies write about · 34 as a headwind · 0 as a tailwind

Taiyo Kisokogyo moved to the "Worse" side of this theme in 2019, 2 years before the typical company in this theme (2021).

The whole theme swung hardest in 2019: 6 of 16 companies on the "Worse" side.

6 other companies' latest entry also says "Worsened".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 34 companies compared. The sentences above are computed from all 34.
Full recordFilings, disclosures and news, newest first
  1. FY2027-H1WorsenedAnnual report

    「Regarding the outlook from the third quarter onward, ... additional expenditures to meet construction schedules and rising raw-material prices remain challenges in terms of earnings, so we will continue to assess the situation cautiously. ... The provision for construction losses ... increased by ¥116 million」

    Regarding the risk of construction losses and unprofitable construction projects, additional expenditures to meet construction schedules and rising raw-material prices remain challenges, while the provision for construction losses increased from ¥35.025 million at the end of the previous fiscal year to ¥151.594 million, expanding the accounting impact.
  2. FY2026-H1Interim-period provision for construction losses declinedAnnual report

    「Provision for construction losses 14,892 13,874」

    The provision for construction losses declined from ¥14.892 million at the end of the previous fiscal year to ¥13.874 million at the end of the current interim period. A provision for unprofitable construction projects remains.
  3. FY2025WorsenedAnnual report

    「In the Special Civil Engineering and Other Business, orders received and revenue declined due to plan revisions and delays in starting work on urban redevelopment projects. In terms of earnings, difficult construction conditions caused by hard ground, together with extended construction periods, machinery breakdowns and increased staffing, resulted in the recording of unprofitable construction projects that substantially exceeded the budget.」

    The disclosure states that hard ground, extended construction periods, machinery breakdowns and increased staffing combined to cause unprofitable construction projects to substantially exceed the budget.
  4. FY2025-Q1MaterialisedAnnual report

    「However, in the Construction Business, a court issued a preservation order in connection with the bankruptcy proceedings of a subcontractor, resulting in the suspension of construction and an extended construction period. This led to increased labor and rental costs during the work stoppage and the recording of a construction loss following the conclusion of a contract with a new subcontractor. In the Special Civil Engineering and Other Business, construction losses were also recorded because construction periods were extended due to constraints on construction conditions and working hours in a series of projects with different ordering parties by work section, and construction machinery broke down under excessive loads caused by harder-than-expected ground.」

    The disclosure states that construction losses were actually recorded in the Construction Business due to the suspension of construction and extended construction periods associated with a subcontractor’s bankruptcy proceedings, and in the Special Civil Engineering and Other Business due to extended construction periods and construction machinery breakdowns caused by construction conditions and hard ground. Measured: false; materialized: true.
  5. FY2024-Q3MaterialisedAnnual report

    「In urban redevelopment construction under the Special Civil Engineering and Other Business, repeated encounters with underground obstructions forced a substantial extension of the construction period, resulting in the recording of a construction loss.」

    Regarding the risk of unprofitable construction projects and construction losses, the disclosure states that repeated underground obstructions in an urban redevelopment project actually resulted in a substantial extension of the construction period and the recording of a construction loss.
  6. FY2024-Q2MitigatedAnnual report

    「Under these circumstances, we worked to ensure safe, high-quality construction by thoroughly managing budgets and schedules and holding regular construction meetings for both work in progress carried over from the previous fiscal year and newly commissioned projects.」

    In response to unprofitable construction projects and construction-related problems, budget management, schedule management and regular construction meetings have continued. Although the provision for construction losses declined from ¥9.076 million at the end of the previous fiscal year to ¥2.329 million, the disclosure does not state that the risk has disappeared.
  7. FY2024-Q1RestatedAnnual report

    「For construction projects we were commissioned to undertake, we held regular construction meetings from before construction began through handover and worked to ensure safe, high-quality construction.」

    As a response to unprofitable construction projects and construction-related problems, regular construction meetings and safe, high-quality construction have continued from before construction began through handover.
  8. FY2023MitigatedAnnual report

    「We also held regular construction meetings before and during work on projects received, and worked to provide safe, high-quality construction. As a result, this led to fewer construction-related problems and also enabled us to expand profitability.」

    The disclosure states that regular construction meetings were held before and during construction in response to unprofitable construction projects and construction-related problems, leading to fewer problems and higher profitability.
  9. FY2023-Q3WorsenedAnnual report

    「Provision for construction losses 3,500 5,820」

    The provision for construction losses increased from ¥3.5 million at the end of the previous fiscal year to ¥5.82 million at the end of the third quarter. Although it declined from ¥8.316 million at the end of the second quarter, the risk of unprofitable construction projects and construction losses continues to appear in the accounts.
  10. FY2023-Q2WorsenedAnnual report

    「Provision for construction losses 3,500 8,316」

    The provision for construction losses increased from ¥3.5 million at the end of the previous fiscal year to ¥8.316 million at the end of the second quarter, further indicating the risk of unprofitable construction projects and construction losses in the accounts.
  11. FY2022MitigatedAnnual report

    「Meanwhile, construction meetings held before work commenced were becoming established, awareness of high-quality construction increased, and the profit margin improved.」

    The disclosure states that profitability improved in response to the risk of unprofitable construction projects and construction losses as pre-construction meetings became established and awareness of high-quality construction increased.
  12. FY2022-Q3WorsenedAnnual report

    「Provision for construction losses - 30,003」

    The provision for construction losses increased from none at the end of the previous fiscal year to ¥30.003 million, also rising from ¥1.528 million at the end of the previous second quarter. The risk of unprofitable construction projects and construction losses is appearing more significantly in the accounts.
  13. FY2022-Q2MaterialisedAnnual report

    「Provision for construction losses - 1,528」

    Compared with no provision for construction losses recorded in the same period of the previous year, ¥1.528 million was recorded at the end of the current second quarter, indicating that the risk of unprofitable construction projects and construction losses continues to appear in the accounts.
  14. FY2022-Q1MaterialisedAnnual report

    「Provision for construction losses - 4,320」

    A ¥4.320 million provision for construction losses was recorded at the end of the first quarter, although none had been recorded at the end of the previous fiscal year, indicating that the risk of unprofitable construction projects and construction losses has appeared as an accounting provision.
  15. FY2021-Q3MaterialisedAnnual report

    「In the housing-related construction business, there were losses from a decline in the number of detached-house ground-improvement projects carried out due to weak personal consumption and from repairing projects carried out in prior fiscal years, but」

    The disclosure states that losses from a decline in the number of detached-house ground-improvement projects and from repairing projects carried out in prior fiscal years continue to occur.
  16. FY2021-Q2MaterialisedAnnual report

    「The loss resulted from a decline in ground-improvement work for detached houses and other properties, as well as additional costs incurred for subsidence-repair work on ground-improvement projects carried out in the previous fiscal year.」

    The disclosure states that additional costs for subsidence-repair work on ground-improvement projects were actually incurred, leading to a segment loss in the housing-related construction business.
  17. FY2020-Q2MaterialisedAnnual report

    「Segment profit also declined because an additional estimate of construction losses for the East Japan region was recorded.」

    The previous disclosure described measures to address unprofitable construction projects and deteriorating profitability. This time, it states that an additional estimate of construction losses for the East Japan region was recorded, causing segment profit to decline.
  18. FY2019-Q3MitigatedAnnual report

    「The Company has thoroughly managed construction sites, including by holding construction meetings for highly complex projects, with the aim of eliminating unprofitable construction projects.」

    In response to unprofitable construction projects and deteriorating profitability that occurred in the past, the disclosure cites the goal of eliminating unprofitable construction projects, construction meetings and thorough site management as measures. It does not state that the risk has been eliminated.
  19. FY2018-Q2MaterialisedAnnual report

    「In the construction industry, public investment and private-sector capital investment remained firm and continued to trend upward. Although the upward trend in construction-material prices and labor costs weakened, competition over order prices remained intense and profitability continued to face difficult conditions. Against this backdrop, we began pursuing a medium- to long-term goal of becoming a company with ¥15 billion in revenue, supported by a sales structure divided into the East Japan, Central Japan and West Japan regions, with a target of ¥5 billion per region. During the cumulative second-quarter period, order value grew steadily and reached its highest level in the past 5 years in terms of order backlog. However, profitability was affected by the occurrence of unprofitable construction projects.」

    The disclosure states that, in addition to intense competition over order prices and difficult profitability conditions, the Company actually incurred unprofitable construction projects, which affected profitability.
Moved together

"Economic Downturn in Emerging Asian Economies and Yen Appreciation" moved the same way as this thread, in the same document, in 7 of its 19 moves.

766443★123456
  1. ★This thread
  2. 1Economic Downturn in Emerging Asian Economies and Yen Appreciation7×
  3. 2Rising construction material prices6×
  4. 3Economic and Logistics Disruptions Caused by COVID-196×
  5. 4Downward Trend in Public Investment4×
  6. 5Increase in labor costs due to a shortage of skilled technicians4×
  7. 6Achieving a 100-Year Company and ¥15 Billion in Completed Construction Revenue3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Taiyo Kisokogyo yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.