Securing Orders for New Construction That Lead to Renovation Work

First written in FY2016. 29 of 39 entries say "Advanced", first in FY2017-Q1. Latest entry: 2026-09-28.

39entries
11years
5from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2017-Q1 – FY2018AdvancedFY2024 – 2026-09-282016: 320162017: 420172018: 420182019: 320192020: 320202021: 420212022: 420222023: 320232024: 320242025: 220252026: 62026
Same theme, other companies
Expansion of Orders for Electrical and HVAC Piping WorkA theme 2 companies write about · 0 as a headwind · 2 as a tailwind

1 other company's latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「For new construction in the HVAC instrumentation-related business, the Company had identified “company-wide optimization from a medium- to long-term perspective and securing orders for projects that lead to existing-facility work” as an issue to be addressed. Actual performance exceeded the plan, and the Company believes it secured a considerable number of projects that will lead to future existing-facility work, partly because it established construction systems capable of handling large-scale projects in various regions.」

    For new construction, the Company described the establishment of construction systems capable of handling large-scale projects in various regions, order results exceeding the plan and the securing of projects that will lead to future existing-facility work. Orders for new construction in fiscal 2025 totaled ¥16,934 million, compared with the plan of ¥12,600 million.
  2. FY2026-H1AdvancedAnnual report

    「Orders increased for new construction projects for offices, data centers and other facilities, as well as for existing-facility work for offices, factories and other facilities. The breakdown was ¥9,076 million for new construction, up 2.6%, and ¥16,678 million for existing-facility work, up 14.1%.」

    Orders for new construction totaled ¥9,076 million and orders for existing-facility work totaled ¥16,678 million. Orders increased for both new construction and existing-facility work, building up order results related to the theme of securing new construction projects that lead to future existing-facility work.
  3. FY2025AdvancedAnnual report

    「For new construction in the HVAC instrumentation-related business, the Company had identified “company-wide optimization from a medium- to long-term perspective and securing orders for projects that lead to existing-facility work” as an issue to be addressed. Although actual performance fell below the plan, the Company believes it secured a considerable number of projects that will lead to future existing-facility work, partly because it established construction systems capable of handling large-scale projects in various regions.」

    While reporting that new construction fell short of plan, the Company explained that it had established construction systems capable of handling large-scale projects in various regions and secured a considerable number of projects that will lead to future existing-facility work.
  4. FY2025-H1AdvancedAnnual report

    「Orders increased for new construction projects for research facilities, factories and other facilities, as well as for existing-facility work for research facilities, factories and other facilities. The breakdown was ¥8,843 million for new construction, up 30.9%, and ¥14,613 million for existing-facility work, up 3.6%.」

    Orders for new construction totaled ¥8,843 million, up 30.9% year on year. The Company specifically described the increase in projects for research facilities and factories.
  5. FY2024AdvancedAnnual report

    「For new construction in the HVAC instrumentation-related business, although order-taking activities are restricted by limited resource capacity, the Company will use “medium- to long-term company-wide optimization” as a key phrase and work to make effective use of management resources with a view several years ahead, rather than focusing on the short term, while further clarifying its regional strategy.」

    The Company gave more concrete form to its previous policy of “thorough implementation of the company-wide optimization policy and securing orders for projects that lead to existing-facility work” through medium- to long-term use of management resources and clarification of its regional strategy. Orders for new construction totaled ¥15,531 million, compared with the plan of ¥9,000 million, and the Company explained that it had also secured a considerable number of projects that will lead to future existing-facility work.
  6. FY2024-Q3RestatedAnnual report

    「For new construction in the HVAC instrumentation-related business, “thorough implementation of the company-wide optimization policy and securing orders for projects that lead to existing-facility work”」

    The Company continues to identify thorough implementation of the company-wide optimization policy and securing new construction projects that will lead to future existing-facility work as challenges. Orders for new construction totaled ¥11,088 million, down 9.9% year on year.
  7. FY2024-Q2RestatedAnnual report

    「For new construction in the HVAC instrumentation-related business, “thorough implementation of the company-wide optimization policy and securing orders for projects that lead to existing-facility work” The breakdown was ¥6,757 million for new construction, down 16.5%, and ¥14,107 million for existing-facility work, up 3.2%.」

    The Company continues to identify thorough implementation of the company-wide optimization policy and securing new construction projects that will lead to future existing-facility work as challenges. While orders for new construction decreased 16.5% year on year, revenue from new construction totaled ¥7,049 million, up 63.2%.
  8. FY2024-Q1RestatedAnnual report

    「For new construction in the HVAC instrumentation-related business, “thorough implementation of the company-wide optimization policy and securing orders for projects that lead to existing-facility work” The breakdown was ¥2,659 million for new construction, down 30.6%, and ¥8,648 million for existing-facility work, up 3.6%.」

    The Company continues to advance the policy of connecting new construction with existing-facility work and the company-wide optimization policy. Orders for new construction totaled ¥2,659 million, down 30.6% year on year.
  9. FY2023-Q3AdvancedAnnual report

    「For new construction in the HVAC instrumentation-related business, “thorough implementation of the company-wide optimization policy and securing orders for projects that lead to existing-facility work” Orders totaled ¥30,040 million, up 28.4% year on year, as projects for factories, offices and other facilities increased. The breakdown was ¥12,175 million for new construction, up 81.4%.」

    The Company continued its policy of connecting new construction with future existing-facility work and the company-wide optimization policy. Orders for new construction totaled ¥12,175 million, up 81.4% year on year.
  10. FY2023-Q2AdvancedAnnual report

    「For new construction in the HVAC instrumentation-related business, “thorough implementation of the company-wide optimization policy and securing orders for projects that lead to existing-facility work”」

    The Company continued its policy of connecting new construction with future existing-facility work. Orders for new construction totaled ¥8,022 million, up 68.9% year on year.
  11. FY2023-Q1AdvancedAnnual report

    「For new construction in the HVAC instrumentation-related business, “thorough implementation of the company-wide optimization policy and securing orders for projects that lead to existing-facility work” The breakdown was ¥3,799 million for new construction, up 55.3%.」

    The Company continues to advance the policy of connecting new construction with future existing-facility work and the company-wide optimization policy. Orders for new construction totaled ¥3,799 million, up 55.3% year on year.
  12. FY2022AdvancedAnnual report

    「For new construction in the HVAC instrumentation-related business, the Company had identified “thorough implementation of the company-wide optimization policy and securing orders for projects that lead to existing-facility work” as an issue to be addressed. However, the efficient allocation of management resources produced results, actual performance exceeded the plan, and the Company believes it secured a considerable number of projects that will lead to future existing-facility work.」

    Orders for new construction totaled ¥9,322 million, compared with the fiscal 2021 plan of ¥8,050 million, exceeding the plan. The Company explained that it had also secured a considerable number of projects that will lead to future existing-facility work.
  13. FY2022-Q3RestatedAnnual report

    「For new construction in the HVAC instrumentation-related business, “thorough implementation of the company-wide optimization policy and securing orders for projects that lead to existing-facility work”」

    The Company continues to advance the policy of connecting new construction with existing-facility work and the company-wide optimization policy. Orders for new construction totaled ¥6,713 million, down 25.0% year on year.
  14. FY2022-Q2RestatedAnnual report

    「For new construction in the HVAC instrumentation-related business, “thorough implementation of the company-wide optimization policy and securing orders for projects that lead to existing-facility work”」

    The Company continues to advance the policy of connecting new construction with existing-facility work and the company-wide optimization policy. Orders for new construction totaled ¥4,749 million, down 30.9% year on year.
  15. FY2022-Q1RestatedAnnual report

    「For new construction in the HVAC instrumentation-related business, “thorough implementation of the company-wide optimization policy and securing orders for projects that lead to existing-facility work”」

    The Company continues to advance the policy of connecting new construction with existing-facility work and the company-wide optimization policy. Orders for new construction totaled ¥2,447 million, down 35.1% year on year.
  16. FY2021ReframedAnnual report

    「①For new construction in the HVAC instrumentation-related business, “thorough implementation of the company-wide optimization policy and securing orders for projects that lead to existing-facility work”」

    The wording evolved from securing orders for projects that lead to existing-facility work to also include “thorough implementation of the company-wide optimization policy.” Orders for new construction totaled ¥10,828 million, compared with the plan of ¥9,000 million.
  17. FY2021-Q3AdvancedAnnual report

    「For new construction in the HVAC instrumentation-related business, “securing orders for projects that lead to existing-facility work” Orders totaled ¥24,258 million, as projects for offices, research facilities and accommodation facilities increased in new construction, despite a decline in projects for factories and other facilities in existing-facility work. The breakdown was ¥8,955 million for new construction and ¥15,302 million for existing-facility work.」

    The Company continued to identify securing new construction that leads to existing-facility work as a challenge. Orders for new construction totaled ¥8,955 million, while completed construction work totaled ¥6,787 million.
  18. FY2021-Q2AdvancedAnnual report

    「In new construction projects in the HVAC instrumentation business, “securing orders for projects that lead to renovation work”」

    The Company continued to identify securing new construction that leads to existing-facility work as a challenge. Orders for new construction totaled ¥6,868 million.
  19. FY2021-Q1AdvancedAnnual report

    「For new construction in the HVAC instrumentation-related business, “securing orders for projects that lead to existing-facility work” The breakdown was ¥3,768 million for new construction and ¥6,110 million for existing-facility work.」

    The Company continued to identify securing new construction that leads to existing-facility work as a challenge and disclosed orders for new construction of ¥3,768 million.
  20. FY2020-Q3AdvancedAnnual report

    「In new construction projects in the HVAC instrumentation business, “securing orders for projects that lead to renovation work”」

    The Company continued to identify securing new construction that leads to existing-facility work as a challenge. Orders for new construction totaled ¥6,381 million, up 1.8% year on year, while completed construction work totaled ¥5,419 million, up 47.4%.
  21. FY2020-Q2RestatedAnnual report

    「For new construction in the HVAC instrumentation-related business, “securing orders for projects that lead to existing-facility work” New construction totaled ¥4,560 million, down 6.9%.」

    The Company continued to identify securing new construction that leads to existing-facility work as a challenge. Orders for new construction decreased 6.9% year on year, while completed construction work totaled ¥3,781 million, up 88.5%.
  22. FY2020-Q1AdvancedAnnual report

    「For new construction in the HVAC instrumentation-related business, “securing orders for projects that lead to existing-facility work” New construction totaled ¥2,448 million, up 22.3%.」

    The Company continued to identify securing new construction that leads to existing-facility work as a challenge. Orders for new construction totaled ¥2,448 million, up 22.3% year on year.
  23. FY2019-Q3AdvancedAnnual report

    「In new construction projects in the HVAC instrumentation business, “securing orders for projects that lead to renovation work”」

    The Company continued its efforts to connect new construction with existing-facility work. Orders for new construction totaled ¥6,266 million, up 0.5% year on year, while completed construction work totaled ¥3,676 million, up 18.3%.
  24. FY2019-Q2AdvancedAnnual report

    「In new construction projects in the HVAC instrumentation business, “securing orders for projects that lead to renovation work”」

    The Company continued to identify securing new construction that leads to existing-facility work as a challenge. Orders for new construction totaled ¥4,898 million, up 22.6% year on year. Meanwhile, completed construction work totaled ¥2,005 million, down 15.7%.
  25. FY2019-Q1RestatedAnnual report

    「In new construction projects in the HVAC instrumentation business, “securing orders for projects that lead to renovation work”」

    The Company continued to identify securing new construction that leads to existing-facility work as a challenge. Orders for new construction totaled ¥2,001 million, down 17.8% year on year.
  26. FY2018AdvancedAnnual report

    「In new construction projects in the HVAC instrumentation business, “securing orders for projects that lead to renovation work”」

    The Company continued to identify this as a challenge. Orders for new construction totaled ¥8,517 million, up 24.5% year on year. Backlog carried forward to the next period also totaled ¥7,903 million, up 21.4%.
  27. FY2018-Q3AdvancedAnnual report

    「In new construction projects in the HVAC instrumentation business, “securing orders for projects that lead to renovation work”」

    The Company continued to identify securing new construction that leads to existing-facility work as a challenge. Orders for new construction totaled ¥6,235 million, up 9.1% year on year. Meanwhile, completed construction work totaled ¥3,106 million, down 43.0%.
  28. FY2018-Q2AdvancedAnnual report

    「In new construction projects in the HVAC instrumentation business, “securing orders for projects that lead to renovation work”」

    The Company continued to identify this as a challenge. Orders for new construction totaled ¥3,996 million, up 0.6% year on year. Meanwhile, completed construction work totaled ¥2,380 million, down 43.3%.
  29. FY2018-Q1AdvancedAnnual report

    「In new construction projects in the HVAC instrumentation business, “securing orders for projects that lead to renovation work”」

    Continues to identify the challenge. Orders for new construction totaled ¥2,435 million, up 2.6% year on year, while completed construction revenue was ¥860 million, down 21.9%.
  30. FY2017AdvancedAnnual report

    「In new construction projects in the HVAC instrumentation business, “securing orders for projects that lead to renovation work”」

    The challenge continued to be identified. New construction orders totaled ¥6,844 million, up 1.5% year on year, while completed construction revenue totaled ¥7,724 million, up 2.7%.
  31. FY2017-Q3AdvancedAnnual report

    「In new construction projects in the HVAC instrumentation business, “securing orders for projects that lead to renovation work”」

    The challenge continued to be identified. New construction orders totaled ¥5,717 million, up 6.8% year on year, while completed construction revenue totaled ¥5,447 million, up 30.7%.
  32. FY2017-Q2AdvancedAnnual report

    「In new construction projects in the HVAC instrumentation business, “securing orders for projects that lead to renovation work”」

    The challenge continued to be identified. Orders received for new construction totaled ¥3,972 million, up 2.4% year on year, while completed construction revenue totaled ¥4,196 million, up 35.0%.
  33. FY2017-Q1AdvancedAnnual report

    「In new construction projects in the HVAC instrumentation business, “securing orders for projects that lead to renovation work”」

    The challenge was reiterated. Orders received for new construction totaled ¥2,374 million, up 13.7% year on year, mainly due to an increase in large-scale projects.
  34. FY2016First statedAnnual report

    「In new construction projects in the HVAC instrumentation business, “securing orders for projects that lead to renovation work”」

    Identifies securing orders for new construction that can lead to future renovation work as one of the medium-term challenges.
Moved together

"Expanding Business Opportunities and Securing Order Volume in the Renovation Market" moved the same way as this thread, in the same document, in 26 of its 39 moves.

26221916106★123456
  1. ★This thread
  2. 1Expanding Business Opportunities and Securing Order Volume in the Renovation Market26×
  3. 2Order Targets of ¥25,000 Million for Building Automation and ¥5,000 Million for Industrial Instrumentation22×
  4. 3Strengthening the Industrial Instrumentation Business Platform and Expanding Its Scope19×
  5. 4Returning to Profitability Through Higher Revenue and Improved Margins16×
  6. 5Unprofitable Construction Projects Caused by Design Changes and Additional Costs10×
  7. 6Returning Profits While Maintaining a Consistent Dividend Payout Ratio6×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Nihon Dengi's next results are scheduled for 2026-11-04. Read the earnings preview It last moved in the Earnings of 2026-09-28: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.