Komori
Mitsui Matsushima Holdings (1518) · RiskRestated

Factory damage and losses caused by the 2016 Kumamoto Earthquake

First written in FY2017-Q1. 2 of 6 entries say "Worsened", first in FY2017-Q2. Latest entry: FY2018-Q3.

6entries
3years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseWorsenedFY2017-Q1 – FY2017-Q3MitigatedFY2018-Q1RestatedFY2018-Q2 – FY2018-Q32016: 220162017: 320172018: 12018
Same theme, other companies
Direct Disaster Losses from the Kumamoto EarthquakeA theme 37 companies write about · 37 as a headwind · 0 as a tailwind

The whole theme swung hardest in 2026: 5 of 7 companies on the "Worse" side.

6 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 37 companies compared. The sentences above are computed from all 37.
Full recordFilings, disclosures and news, newest first
  1. FY2018-Q3RestatedAnnual report

    「These losses resulted from damage caused by the 2016 Kumamoto Earthquake. Their main components were as follows: Repairs and other costs for property, plant and equipment ¥185 million — million Provision for disaster loss ¥49 million — Total ¥235 million — million」

    While the ¥235 million loss from the Kumamoto Earthquake is shown as comparative information for the previous year, no additional losses were recorded during the current third-quarter cumulative consolidated period.
  2. FY2018-Q2RestatedAnnual report

    「Disaster-related losses ¥220 million —」

    While the ¥220 million loss from the Kumamoto Earthquake is shown as comparative information for the previous year, no losses were recorded during the current second-quarter cumulative consolidated period, and no additional losses are reported.
  3. FY2018-Q1MitigatedAnnual report

    「Disaster-related losses ¥195 million —」

    While disaster-related losses from the Kumamoto Earthquake are shown as comparative information, none were recorded during the current first-quarter cumulative consolidated period.
  4. FY2017-Q3WorsenedAnnual report

    「These losses resulted from damage caused by the 2016 Kumamoto Earthquake. Their main components were as follows: Repairs and other costs for property, plant and equipment ¥185 million Provision for disaster loss ¥49 million Total ¥235 million」

    Losses recorded as a result of the Kumamoto Earthquake totaled ¥235 million for the cumulative third quarter, up from ¥220 million in the previous cumulative quarter.
  5. FY2017-Q2WorsenedAnnual report

    「These losses resulted from damage caused by the 2016 Kumamoto Earthquake. Their main components were as follows: Repairs and other costs for property, plant and equipment ¥150 million Provision for disaster loss ¥70 million Total ¥220 million」

    Losses recorded as a result of the Kumamoto Earthquake totaled ¥220 million on a cumulative quarterly basis. Meanwhile, the damaged Kumamoto plant continues to operate at normal production levels.
  6. FY2017-Q1MaterialisedAnnual report

    「Some areas of the Kumamoto plant of Nippon Straw Co., Ltd., in the food-service materials field, were damaged by the 2016 Kumamoto Earthquake, but following intensive restoration efforts, the plant is now operating at normal production levels.」

    Part of the Kumamoto plant was damaged, and the company recorded ¥100 million in repairs and other costs for property, plant and equipment and ¥95 million in provision for disaster loss, for a total of ¥195 million, as disaster-related losses.
Moved together

"Risks from fluctuations in coal prices, sales volumes and foreign exchange rates" moved the same way as this thread, in the same document, in 3 of its 6 moves.

3★1
  1. ★This thread
  2. 1Risks from fluctuations in coal prices, sales volumes and foreign exchange rates3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Mitsui Matsushima Holdings's next results are scheduled for 2026-11-13. Read the earnings preview