Komori
Mitsui Matsushima Holdings (1518) · RiskMitigated

Strike at the Rix's Creek coal mine in Australia and recovery to normal operations

First written in FY2018-Q2. 1 of 3 entries say "Materialised", first in FY2018-Q2. Latest entry: FY2018.

3entries
2years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseMaterialisedFY2018-Q2 – FY2018-Q32017: 120172018: 22018
Same theme, other companies
Risk of Business Activity Interruption Due to Strikes and Labor DisputesA theme 9 companies write about · 9 as a headwind · 0 as a tailwind

2 other companies' latest entry also says "Mitigated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2018MitigatedAnnual report

    「The strike ended at the end of October 2017, and had no impact on the following consolidated fiscal year.」

    The strike at the Rix's Creek coal mine in Australia ended at the end of October 2017, and the filing states that it had no impact on the following consolidated fiscal year.
  2. FY2018-Q3WorsenedAnnual report

    「Segment profit was ¥556 million, compared with a segment loss of ¥555 million in the same period of the previous year. Although production costs increased because of a temporary strike in the coal production field, higher coal prices and other factors led to a profit.」

    Regarding the temporary strikes at the Rix's Creek coal mine in Australia and elsewhere, the filing describes their impact on results as an increase in production costs in the coal production field, compared with the previous explanation that the impact was limited.
  3. FY2018-Q2MaterialisedAnnual report

    「Intermittent strikes had occurred since June 2017 at the Rix's Creek coal mine in Australia, in which the Company's consolidated subsidiary Mitsui Matsushima Australia holds a 32.5% interest. The strike at the open-cut operation is expected to end, and operations have now returned to normal. As the subsidiary's fiscal year ends in December, with a three-month reporting lag, its results for the period from January 2017 through June 2017 are included, and the impact of the strikes during the cumulative second quarter was therefore limited.」

    This is the first disclosure that the risk of intermittent strikes at the Rix's Creek coal mine in Australia since June 2017 had materialized. It also explains that the strike at the open-cut operation is expected to end, operations have returned to normal, and the impact on the cumulative quarter was limited.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
Mitsui Matsushima Holdings's next results are scheduled for 2026-11-13. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Strike at the Rix's Creek coal mine in Australia and recovery to normal operations | MITSUI MATSUSHIMA HOLDINGS CO.,LTD. (1518) | Komori