Komori
Nittetsu Mining (1515) · RiskWorsenedLatest Financial results presentation (2026-08-06): "Materialised"

Risk of higher production costs from prolonged procurement lead times and soaring raw-material prices

First written in FY2025. 2 of 4 entries say "Materialised", first in 2026-06-02. Latest entry: 2026-08-06.

4entries
2years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2025Materialised2026-06-02 – 2026-08-062025: 120252026: 32026
Same theme, other companies

Nittetsu Mining moved to the "Worse" side of this theme in 2026, 4 years after the typical company in this theme (2022).

The whole theme swung hardest in 2022: 99 of 155 companies on the "Worse" side.

30 other companies' latest entry also says "Materialised".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 173 companies compared. The sentences above are computed from all 173.
Full recordFilings, disclosures and news, newest first
  1. 2026-08-06MaterialisedFinancial results presentation

    「Operating profit declined due to surging raw-material prices for water-treatment chemicals.」

    Surging raw-material prices emerged in the results as a factor reducing operating profit in the Machinery and Environmental business.
  2. FY2026WorsenedAnnual report

    「なお、中東情勢につきましては、原油の価格高騰及び調達の困難化が長期に及ぶ場合、鉱山重機等に使用する軽油等の燃料費や生産設備稼働のための電力料の増加等により、当社グループの経営成績及び財政状態に影響を与える可能性があります。」

    原材料調達リスクに加え、中東情勢による原油価格高騰・調達困難化を通じた燃料費・電力料上昇リスクを追加した。
  3. 2026-06-02MaterialisedOther Disclosures

    「As domestic titanium dioxide production has contracted, procurement conditions for iron sulfate, a by-product used as a raw material for Polytech, have tightened. This has created challenges in addressing the risks of unstable raw-material procurement and higher costs.」

    The company described tighter procurement conditions for Polytech raw materials and the resulting risks of unstable procurement and higher costs.
  4. FY2025First statedAnnual report

    「原材料等の調達が長期化することで、設備投資プロジェクトや設備修繕計画に遅延が生じる場合、また、調達価格の高騰や原料供給先の事業縮小・撤退に伴う代替原料調達などにより生産コストが上昇する場合、当社グループの経営成績及び財政状態に影響を与える可能性があります。」

    原材料調達の長期化、調達価格高騰、供給先の縮小・撤退、代替原料調達による生産コスト上昇を新たなリスクとして独立開示した。調達先の多様化、在庫管理強化、代替原料の研究・開発を対策としている。
Moved together

"Effective use of assets held and reduction of interest-bearing debt" moved the same way as this thread, in the same document, in 2 of its 4 moves.

22★12
  1. ★This thread
  2. 1Effective use of assets held and reduction of interest-bearing debt2×
  3. 2Risks from interest-bearing debt and rising market interest rates2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Nittetsu Mining's next results are scheduled for 2026-11-06. Read the earnings preview It last moved in the Financial results presentation of 2026-08-06: "Materialised".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.