Giken Holdings (1443) · InitiativeAdvancedLatest Results (2026-11-16): "Other"

Eliminating Unprofitable Work and Focusing on Profitability When Accepting Orders

First written in FY2018. 16 of 29 entries say "Advanced", first in FY2019-Q1. Latest entry: 2026-11-16.

29entries
9years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2019-Q1 – FY2022OtherFY2023-Q1 – FY20252018: 320182019: 420192020: 220202021: 420212022: 420222023: 420232024: 320242025: 220252026: 32026
Same theme, other companies
Selective Order Acceptance Focused on ProfitabilityA theme 21 companies write about · 0 as a headwind · 22 as a tailwind

The whole theme swung hardest in 2021: 1 of 6 companies on the "Worse" side.

0 other companies' latest entry also says "Other".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 21 companies compared. The sentences above are computed from all 21.
Full recordFilings, disclosures and news, newest first
  1. 2026-11-16OtherResults

    「昨年、災害復旧工事等の受注が増加しましたが、今期は、その反動の結果、受注高は前年同期比83.2%減の66百万円となり、売上高は前年同期比9.7%増の509百万円、営業利益におきましては、前年同期比27.7%増の105百万円となりました。」

    土木関連事業では災害復旧工事等の受注反動により受注高が大幅に減少した一方、売上高と営業利益は増加した。
  2. FY2026AdvancedAnnual report

    「In this business, which is primarily engaged in slope protection works, orders received increased 60.3% year on year to ¥1,455 million, revenue increased 14.5% to ¥834 million and operating income increased 38.5% to ¥138 million.」

    In the civil engineering-related business, the policy of emphasizing profitability before accepting orders and related measures continued, and orders received, revenue and operating income exceeded the previous year’s levels.
  3. 2026-06-03Cited as achievedGeneral Meetings of Shareholders

    「法面保護工事が主体の当事業は、受注高につきましては前年同期比60.3%増の1,455百万円、売上高につきましては前年同期比14.5%増の834百万円、営業利益につきましては前年同期比38.5%増の138百万円となりました。」

    土木関連事業で受注高、売上高、営業利益が前年同期を上回った実績を引用している。
  4. FY2026-H1AdvancedAnnual report

    「In this business, which is primarily engaged in slope protection works, orders for disaster recovery works and other projects declined last year, but this fiscal year returned to normal levels as a reaction to that decline. As a result, orders received increased 6.3% year on year to ¥397 million, revenue increased 42.6% to ¥464 million and operating income increased 90.0% to ¥82 million.」

    In the civil engineering-related business, orders received, revenue and operating income exceeded the previous year’s levels as activity rebounded from the decline in orders for disaster recovery works and other projects.
  5. FY2025Civil engineering orders increased, but revenue and profit declinedAnnual report

    「In this business, which is primarily engaged in slope protection works, orders received increased 3.0% year on year to ¥908 million, while revenue declined 17.4% to ¥728 million and operating income declined 16.6% to ¥100 million.」

    In the civil engineering-related business, orders received increased, while revenue and operating income fell below the previous fiscal year’s levels.
  6. FY2025-H1Profit improved despite declines in civil engineering orders and revenueAnnual report

    「In this business, which is primarily engaged in slope protection works, orders for recovery works following typhoons and torrential rain declined. As a result, orders received fell 11.3% year on year to ¥374 million and revenue fell 10.6% to ¥325 million as progress on both construction carried forward from the previous fiscal year and projects received during the current fiscal year remained sluggish. However, operating income increased 44.6% to ¥43 million.」

    In the civil engineering-related business, orders received and revenue declined, while operating income exceeded the previous year’s level.
  7. FY2024Revenue and profit continued to decline in the civil engineering businessAnnual report

    「The number of employees in the civil engineering division declined, while orders for projects scheduled during the year were delayed or cancelled. As a result, orders received fell 10.8% year on year to ¥881 million, revenue fell 33.2% to ¥881 million and operating income fell 47.5% to ¥120 million.」

    In the civil engineering business, orders received, revenue and operating income fell below the previous fiscal year’s levels because the workforce declined and orders for projects scheduled during the year were delayed or cancelled.
  8. FY2024-Q3Revenue and profit continued to decline in the civil engineering businessAnnual report

    「In this business, which is primarily engaged in slope protection works, orders received remained broadly in line with the previous fiscal year, declining 0.8% year on year to ¥758 million. However, revenue fell 52.8% to ¥510 million as progress on both construction carried forward from the previous fiscal year and projects received during the current fiscal year remained sluggish, while operating income declined 78.9% to ¥47 million.」

    In the civil engineering-related business, orders received were broadly in line with the previous year’s level, but revenue and operating income declined sharply because construction progress remained sluggish.
  9. FY2024-Q2Revenue and profit continued to decline as disaster recovery orders fell and progress remained sluggishAnnual report

    「In this business, which is primarily engaged in slope protection works, orders for recovery works following typhoons and torrential rain declined. As a result, orders received fell 35.1% year on year to ¥421 million. Revenue fell 49.0% to ¥364 million as progress on both construction carried forward from the previous fiscal year and projects received during the current fiscal year remained sluggish, while operating income declined 79.4% to ¥30 million.」

    In the civil engineering-related business, orders received, revenue and operating income fell below the previous year’s levels because orders for disaster recovery works declined and construction progress remained sluggish.
  10. FY2024-Q1Revenue and profit declined as recovery-work orders fell and progress remained sluggishAnnual report

    「In this business, which is primarily engaged in slope protection works, orders for recovery works following typhoons and torrential rain declined. As a result, orders received fell 82.8% year on year to ¥83 million. Revenue fell 60.1% to ¥170 million as progress on both construction carried forward from the previous fiscal year and projects received during the current fiscal year remained sluggish, while operating income declined 79.5% to ¥18 million.」

    In the civil engineering-related business, orders received, revenue and operating income declined sharply because orders for recovery works fell and construction progress remained sluggish.
  11. FY2023Annual revenue and profit declined due to delayed or cancelled orders for scheduled projectsAnnual report

    「Because orders for projects scheduled during the year were delayed or cancelled, orders received fell 64.7% year on year to ¥988 million, revenue fell 58.3% to ¥1,320 million and operating income fell 62.7% to ¥229 million.」

    In the civil engineering-related business, annual orders received, revenue and operating income declined sharply because orders for projects scheduled during the year were delayed or cancelled.
  12. FY2023-Q3Revenue and profit declined amid delayed orders and project cancellationsAnnual report

    「In this business, which is primarily engaged in slope protection works, orders for projects scheduled during the year were delayed or cancelled. As a result, orders received fell 64.8% year on year to ¥765 million, revenue fell 51.6% to ¥1,081 million and operating income fell 43.0% to ¥222 million.」

    In the civil engineering-related business, orders received, revenue and operating income fell below the previous year’s levels because orders for projects scheduled during the year were delayed or cancelled.
  13. FY2023-Q2Revenue and profit declined as disaster recovery orders fellAnnual report

    「In this business, which is primarily engaged in slope protection works, orders for recovery works following typhoons and torrential rain declined. As a result, orders received fell 55.5% year on year to ¥650 million. Revenue fell 49.7% to ¥714 million as progress on both construction carried forward from the previous fiscal year and projects received during the current fiscal year remained sluggish, while operating income declined 40.2% to ¥146 million.」

    In the civil engineering-related business, orders received, revenue and operating income fell below the previous year’s levels because orders for disaster recovery works declined and construction progress remained sluggish.
  14. FY2023-Q1Revenue and profit declined as orders for recovery works fellAnnual report

    「In this business, which is primarily engaged in slope protection works, orders for recovery works following typhoons and torrential rain declined. As a result, orders received fell 16.2% year on year to ¥486 million. Revenue fell 39.4% to ¥428 million as progress on both construction carried forward from the previous fiscal year and projects received during the current fiscal year remained sluggish, while operating income declined 25.6% from the previous fiscal year to ¥90 million.」

    In the civil engineering-related business, orders received, revenue and operating income fell below the previous year’s levels because orders for disaster recovery works declined and construction progress remained sluggish.
  15. FY2022AdvancedAnnual report

    「In the civil engineering-related business, we have long sought to secure orders with an emphasis on profitability by eliminating unprofitable construction projects, reviewing project profitability before accepting orders and securing appropriate construction capabilities. These measures functioned effectively in the consolidated fiscal year under review, and their benefits are beginning to emerge.」

    The company states that its profitability-focused order-management measures functioned effectively during the fiscal year under review and produced results. Operating income in the civil engineering-related business was ¥614 million.
  16. FY2022-Q3AdvancedAnnual report

    「In this business, which is primarily engaged in slope protection works, orders and revenue from disaster prevention projects in our specialist areas remained firm as budgets under the national resilience plans of the national and local governments were executed. As a result, orders received declined 14.1% year on year to ¥2,173 million, while revenue increased 4.1% to ¥2,234 million and operating income increased 4.5% to ¥391 million.」

    Although orders received declined, revenue and operating income exceeded the previous year’s levels, driven mainly by disaster prevention projects.
  17. FY2022-Q2AdvancedAnnual report

    「In this business, which is primarily engaged in slope protection works, orders received declined 10.6% year on year to ¥1,462 million because total orders declined and competition intensified. However, as construction progressed smoothly, revenue increased 10.6% to ¥1,420 million, while rigorous cost control resulted in operating income of ¥244 million, up 13.7%.」

    In the civil engineering-related business, orders received declined, but construction progress and rigorous cost control lifted revenue and operating income above the previous year’s levels.
  18. FY2022-Q1AdvancedAnnual report

    「In this business, which is primarily engaged in slope protection works, orders received declined 16.5% year on year to ¥579 million because total orders declined and competition intensified. However, as construction progressed smoothly, revenue increased 17.2% to ¥706 million, while rigorous cost control resulted in operating income of ¥121 million, up 25.1%.」

    Although orders declined because total orders fell and competition intensified, construction progress and rigorous cost control lifted revenue and operating income in the civil engineering-related business above the previous year’s levels.
  19. FY2021AdvancedAnnual report

    「We have long sought to secure orders with an emphasis on profitability by eliminating unprofitable construction projects, reviewing project profitability before accepting orders and securing appropriate construction capabilities. These measures functioned effectively in the consolidated fiscal year under review, and their benefits are beginning to emerge.」

    The company explains that eliminating unprofitable construction projects, reviewing profitability before accepting orders and securing construction capabilities functioned effectively during the consolidated fiscal year under review, producing results.
  20. FY2021-Q3AdvancedAnnual report

    「In this business, which is primarily engaged in slope protection works, orders and revenue from disaster prevention projects in our specialist areas remained firm as budgets under the national resilience plans of the national and local governments were executed. As a result, orders received declined 0.2% year on year to ¥2,529 million, revenue increased 5.5% to ¥2,145 million and operating income increased 7.0% to ¥374 million.」

    Revenue from disaster prevention projects increased in the civil engineering-related business, resulting in operating income of ¥374 million, up 7.0% year on year.
  21. FY2020AdvancedAnnual report

    「In terms of profitability, we continued from the previous fiscal year to eliminate unprofitable construction projects through thorough advance investigations of projects received and to rigorously implement our cost-management policy. However, selective bidding focused on highly profitable projects resulted in operating income increasing 60.3% from the previous fiscal year to ¥538 million.」

    The civil engineering-related business continued advance investigations, the elimination of unprofitable construction projects, cost controls and selective bidding, recording operating income of ¥538 million.
  22. FY2020-Q3AdvancedAnnual report

    「In this business, which is primarily engaged in slope protection works, orders received increased 24.6% year on year to ¥2,533 million and revenue increased 12.3% to ¥2,033 million, partly because public budgets for disaster prevention and mitigation under the national resilience program were executed. In terms of profitability, operating income increased 120.4% to ¥349 million as a result of rigorous variable-cost control.」

    The company pursued orders for disaster prevention and mitigation projects in the civil engineering-related business and continued to control variable costs, recording orders received of ¥2,533 million and operating income of ¥349 million.
  23. FY2020-Q2AdvancedAnnual report

    「In this business, which is primarily engaged in slope protection works, orders received declined 3.7% year on year to ¥1,257 million and revenue increased 15.1% to ¥1,211 million, due to the completion of reconstruction support projects following the Great East Japan Earthquake and the impact of intensifying competition as the market contracted. In terms of profitability, operating income increased 180.8% to ¥235 million as a result of rigorous variable-cost control.」

    Despite the impact of market contraction and intensifying competition in the civil engineering-related business, rigorous variable-cost control resulted in operating income of ¥235 million.
  24. FY2020-Q1AdvancedAnnual report

    「In terms of profitability, operating income increased 202.0% year on year to ¥161 million as a result of eliminating unprofitable construction projects through thorough advance investigations of projects received and other measures.」

    The company continued to conduct advance investigations of projects received and eliminate unprofitable construction projects, recording operating income of ¥161 million in the civil engineering-related business, up 202.0% year on year.
  25. FY2019AdvancedAnnual report

    「In terms of profitability, we continued from the previous fiscal year to eliminate unprofitable construction projects through thorough advance investigations of projects received and to rigorously implement our cost-management policy. However, operating income rose 103.6% year on year to ¥336 million, reflecting higher labor costs and persistently elevated construction-material prices.」

    The company continued to eliminate unprofitable construction projects through pre-order investigations and maintain cost controls, recording operating income of ¥336 million in the civil engineering-related business.
  26. FY2019-Q3AdvancedAnnual report

    「In this business, which is primarily engaged in slope protection works, we actively pursued orders for recovery and disaster prevention support in response to frequent natural disasters across Japan. As a result, orders received were ¥2,032 million and revenue was ¥1,809 million. In terms of profitability, operating income was ¥158 million as a result of rigorous variable-cost control and efficient site management.」

    The civil engineering-related business pursued orders actively, controlled variable costs and improved site efficiency, recording operating income of ¥158 million.
  27. FY2019-Q2AdvancedAnnual report

    「This business, which is primarily engaged in slope protection works, conducted proactive sales activities to support disaster recovery and disaster prevention efforts in response to frequent natural disasters in various regions. As a result, orders amounted to ¥1,305 million and net sales to ¥1,052 million. On the earnings side, operating profit was ¥84 million following the implementation of thorough variable-cost controls.」

    The Company advanced sales efforts for natural-disaster recovery and disaster-prevention support and managed variable costs, generating ¥1,305 million in orders and ¥84 million in operating profit in its civil engineering-related business.
  28. FY2019-Q1AdvancedAnnual report

    「As a result of thorough preliminary surveys of projects before accepting orders and the elimination of unprofitable projects, operating profit was ¥53 million.」

    The Company explains that it conducted preliminary surveys before accepting orders and eliminated unprofitable projects, generating operating profit of ¥53 million in its civil engineering-related business.
  29. FY2018First statedAnnual report

    「For some time, the Company has sought to secure orders with an emphasis on profitability, including eliminating unprofitable projects, assessing profitability before accepting orders, and securing an appropriate project execution structure.」

    In deciding whether to accept civil engineering projects, the Company prioritises advance assessment of profitability and securing an appropriate project execution structure.
Moved together

"Securing Stable Earnings Through Rigorous Cost Management and Fixed-Cost Reductions" moved the same way as this thread, in the same document, in 11 of its 29 moves.

1197755★123456
  1. ★This thread
  2. 1Securing Stable Earnings Through Rigorous Cost Management and Fixed-Cost Reductions11×
  3. 2Rigorous Cost Management in the Construction Business9×
  4. 3Establishing a Stable Management Base and Delivering Steady Growth7×
  5. 4Focused Sales Targeting Projects Related to Great East Japan Earthquake Recovery and Reconstruction and National Resilience7×
  6. 5Cost management for the fabrication, maintenance and repair, and transportation of steel formwork5×
  7. 6Group-wide cash management and liquidity management5×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Giken Holdings's next results are scheduled for 2026-11-16. Read the earnings preview It last moved in the Results of 2026-11-16: "Other".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.