Announced details
Adjusting fluctuations in renewable energy generation, balancing electricity supply and demand, and stabilizing the power grid
There are no capital, personnel, business, or related-party relationships between the company and 綜電株式会社 or ESLEAD CORPORATION. 綜電株式会社 is the counterparty to an order contract entered into by the company's 100% subsidiary, 株式会社グリーンエナジー・プラス.
綜電株式会社: Headquartered in Kita Ward, Osaka City; established in May 2006; capital of ¥90 million; representative director: Nakazawa Hiroshi (中澤博司). The company operates power supply services, various electrical construction businesses, and solar power generation businesses. ESLEAD CORPORATION: Located in Kita Ward, Osaka City; established in May 1992; capital of ¥1.983 billion; representative director and president: Aramaki Sugio (荒牧杉夫). It is a comprehensive real estate company listed on the Tokyo Stock Exchange Prime Market and the parent company of 綜電株式会社.
Kyoto Prefecture
In this announcement the company addresses none of Contract Value / Offering price / Impact on Business Performance.
| Item | Details |
|---|---|
| Names of Products / Services Covered | Grid-scale battery storage system |
| Counterparty | 綜電株式会社, ESLEAD CORPORATION (securities code: 8877) |
| Counterparty overview | 綜電株式会社: Headquartered in Kita Ward, Osaka City; established in May 2006; capital of ¥90 million; representative director: Nakazawa Hiroshi (中澤博司). The company operates power supply services, various electrical construction businesses, and solar power generation businesses. ESLEAD CORPORATION: Located in Kita Ward, Osaka City; established in May 1992; capital of ¥1.983 billion; representative director and president: Aramaki Sugio (荒牧杉夫). It is a comprehensive real estate company listed on the Tokyo Stock Exchange Prime Market and the parent company of 綜電株式会社. |
| Relationship with the Company | There are no capital, personnel, business, or related-party relationships between the company and 綜電株式会社 or ESLEAD CORPORATION. 綜電株式会社 is the counterparty to an order contract entered into by the company's 100% subsidiary, 株式会社グリーンエナジー・プラス. |
| Launch date | 30 September 2026 (completed and handed over) |
| Applicable area | Adjusting fluctuations in renewable energy generation, balancing electricity supply and demand, and stabilizing the power grid |
| Location | Kyoto Prefecture |
| Location scale | 2 facilities. Rated output of 1,999 kW per facility and nominal capacity of 8,146 kWh per facility. Combined rated output of 3,998 kW and combined nominal capacity of 16,292 kWh. |
Items this document does not state (10)
These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.
The reasons the company gives
The company's own explanation, not something inferred from the numbers.To adjust fluctuations in renewable energy generation and stabilize the power grid. The company states that it will promote the deployment of grid-scale battery storage facilities and work toward building sustainable energy infrastructure.