Komori
West Holdings (1407) · RiskRestatedLatest Results (2026-10-15): "Softened"

Risk of delays in deliveries of power conditioners and other materials

First written in FY2022-Q1. 3 of 8 entries say "Worsened", first in FY2022-Q2. Latest entry: 2026-10-15.

8entries
5years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2023-Q2 – FY2023-Q32022: 320222023: 320232024: 020242025: 020252026: 22026
Same theme, other companies
Project Progress Risks from Shortages of Materials and Equipment and Delivery DelaysA theme 49 companies write about · 51 as a headwind · 0 as a tailwind

West Holdings moved to the "Worse" side of this theme in 2026, 4 years after the typical company in this theme (2022).

The whole theme swung hardest in 2026: 12 of 28 companies on the "Worse" side.

0 other companies' latest entry also says "Softened".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 49 companies compared. The sentences above are computed from all 49.
Full recordFilings, disclosures and news, newest first
  1. FY2023-Q3RestatedAnnual report

    「Although demand for both has increased substantially, the need to increase construction capacity has become more pressing in light of supply-side risks, including rising geopolitical risks, concerns over accelerating inflation and foreign exchange trends, and we will continue to address this as our highest priority.」

    The company continues to identify geopolitical risks, concerns about accelerating inflation and foreign exchange trends as supply-side risks accompanying expanding demand, and to explain that increasing construction capacity is its top priority.
  2. FY2023-Q2RestatedAnnual report

    「Although demand for both has increased substantially, the need to increase construction capacity has become more pressing in light of supply-side risks, including rising geopolitical risks, concerns over accelerating inflation and foreign exchange trends, and we will continue to address this as our highest priority.」

    In response to expanding demand, the company continues to explain that increasing construction capacity is its top priority, taking into account supply-side risks such as geopolitical risks, concerns about accelerating inflation and foreign exchange trends.
  3. FY2023-Q1WorsenedAnnual report

    「Although demand for both has increased substantially, the need to increase construction capacity has become more pressing in light of supply-side risks, including rising geopolitical risks, concerns over accelerating inflation and foreign exchange trends, and we will continue to address this as our highest priority.」

    The company identified geopolitical risks, accelerating inflation and foreign exchange trends, in addition to delays in materials deliveries, as supply-side risks, and stated that the need to increase construction capacity in response to expanding demand had grown.
  4. FY2022-Q3RestatedAnnual report

    「Although demand for both has increased substantially, concerns remain that logistics disruptions amid heightened geopolitical risks could delay the delivery of materials, and we will continue to pay close attention to the steady execution of construction plans.」

    The company continues to describe concerns about delays in materials deliveries caused by geopolitical risks and logistics disruptions, as well as the need to monitor construction plans.
  5. FY2022-Q2WorsenedAnnual report

    「Although demand for both has increased substantially, concerns remain that logistics disruptions amid heightened geopolitical risks could delay the delivery of materials, and we will continue to pay close attention to the steady execution of construction plans.」

    Regarding the risk of delays in materials deliveries, the company described concerns about delivery delays caused by geopolitical risks and logistics disruptions, in addition to the previous delays centered on power conditioners.
  6. FY2022-Q1First statedAnnual report

    「Although demand for all of these products is rising sharply, deliveries of materials, particularly power conditioners, are beginning to run behind schedule. We will continue to pay close attention to the steady execution of construction plans.」

    The company first stated that, despite expanding demand for self-consumption systems, West FIT and PPA, delays were beginning to occur in deliveries of materials, particularly power conditioners.
Moved together

"Downside risks from foreign exchange and emerging-market economies" moved the same way as this thread, in the same document, in 2 of its 8 moves.

22★12
  1. ★This thread
  2. 1Downside risks from foreign exchange and emerging-market economies2×
  3. 2Stable order intake despite falling FIT prices2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for West Holdings yet. It last moved in the Results of 2026-10-15: "Softened".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.