A specific inter-factory equipment transfer plan to optimize the production structure by transferring the adhesive-liquid manufacturing equipment and buildings at the aging, seismically inadequate Tape Anjo Plant to the Saitama Plant. The equipment was completed in October 2023 and entered full-scale operation.