Efforts to restore public transportation services to normal operations as quickly as possible while prioritising regional recovery and reconstruction following service suspensions and reduced service caused by road closures from the July 2018 Heavy Rains. This is specifically linked to the restoration of route operations after the torrential-rain disaster.