An individual capital investment plan to newly install casting machining equipment and expand a machining line at the Fukuyama Plant, with the aim of ensuring stable production of transmission components and increasing production capacity. This is a time-dependent theme tied to a specific site and specific machining equipment during the 2017–2020 period.