デンコーテクノヒート, a subsidiary of 電気興業, will build and relocate its Suzuka plant to Kofu-cho, Suzuka, Mie Prefecture. The site will measure approximately 4,684 m², about 2.4 times the size of the current plant. Completion is scheduled for March 2027, with relocation of all equipment scheduled for January 2028.
デンコーテクノヒート is proceeding with the relocation and construction of a new Suzuka plant to address aging facilities and space constraints. The new plant will be a two-story steel-frame building above ground, with a site area of approximately 4,684 m², about 2.4 times the size of the current plant.
At the new plant, incoming and outgoing areas will be separated, and robots will be introduced into the heat-treatment equipment to promote automation. As a result, production capacity is expected to increase by approximately 30% from the current plant. A self-consumption solar power generation system with a capacity of approximately 244 kW will be installed on the roof to reduce CO2 emissions. Relocating to elevated ground 42 meters above sea level will reduce the risk of tsunami inundation and strengthen business continuity planning.