The project name for detailed design services undertaken by CTI Engineering Osaka Head Office was identified based on the results of performance ratings for outsourced services published by Osaka City's Urban Development Bureau and Waterworks Bureau for August 2026.
Osaka City published the August 2026 performance ratings for outsourced services commissioned by its Urban Development Bureau and Waterworks Bureau. The scope reportedly included services such as surveying and construction consulting, and the results are expected to serve as a reference for selecting future projects.
Among the projects subject to rating was one for which CTI Engineering Osaka Head Office undertook detailed design services. The project involved detailed design services associated with improvements to receiving and distribution equipment at 2 locations, including the Niwakubo Water Purification Plant management building.