Prime Minister Le Minh Hung (レ・ミン・フン) attended groundbreaking ceremonies in Hai Phong for the construction of a port and a rare-earth materials plant. The two projects, with a combined investment of VND 26.4 trillion, were launched simultaneously and are expected to increase port capacity and strengthen the supply system for high-purity materials.
On the afternoon of 23 November, a groundbreaking ceremony was held in the Lach Huyen port area of Hai Phong for the simultaneous construction of berths 9–12 and a plant producing clean rare-earth raw materials as part of two investment projects. Attendees included Minister Dang Xuan Phong (ダン・スアン・フォン), Minister of Industry and Trade Le Man Hung (レ・マン・フン), senior officials from the relevant ministries and agencies, representatives of Hai Phong and surrounding areas, and representatives of the investors and partners.
The port project covers approximately 146.2 hectares in the Lach Huyen port area and includes 4 container berths, including a 1,800-metre main berth, capable of handling container vessels of 12,000–18,000 TEU. The project will also include a 400-metre barge berth, storage yards, repair workshops, access roads and integrated technical infrastructure.
The plant producing high-purity materials from rare-earth raw materials will be built in plot CN1 of the Xuân Cầu Industrial Park and Free Trade Zone, on a site of approximately 28,000 square metres.
The total investment comprises VND 24.845 trillion for the port project and VND 1.58 trillion for the rare-earth raw materials plant, bringing the combined investment for the two projects to VND 26.4 trillion. Building on these results, the projects are expected to strengthen Hai Phong’s position as an international port and logistics hub.